Mill Creek Metropark; final environmental impact statement

 
9781231253045: Mill Creek Metropark; final environmental impact statement

This historic book may have numerous typos and missing text. Purchasers can download a free scanned copy of the original book (without typos) from the publisher. Not indexed. Not illustrated. 1978* Excerpt: ...Engineering Division Copy furnished: Mr. Robert B. Smythe, Staff Assistant (Water Resources) Council on Environmental Quality, 722 Jackson Place, N.W., WASH, D.C. 20006 Response to Comments by the Amy Corps of Engineers 1. Construction of the Impoundment would require reconstruction of the Fletcher Road bridge froa the current road surface level of 892.9 feet to a surface elevation of at least 896 feat. This was mentioned on page 167 of the draft statement. As Indicated on page 70 of the draft statement, the flow froa a 100-year flood would be passed without significantly altering flood conditions which could be expected should the Impoundment not be constructed. 2. Once the Impoundment Is filled, there would be little effect on downstreaa flow (page 75 of the draft statement). The final statement has been revised to more fully explain the construction, filling, and normal operation procedures to be employed. The Hill Creek Impoundment would have a minor Impact on the development of the Huron River watershed as a whole. This Impact would not be felt outside Lima and Freedom Townships and Is as described In this statement. Memorandum To: Regional Director, Bureau of Outdoor Recreation, Ann Arbor, Michigan Through: "Assistant Secretary--Energy and Minerals LCiAJ-JKl/) MAR 3 1 B75 From: Director, Bureau of Mines Subject: Draft environmental statement. Bureau of Outdoor Recreation, Mil) Creek metropolitan park acquisition; Washtenaw County, Michigan The draft environmental statement prepared by the Bureau of Outdoor Recreation for the Mill Creek metropolitan park acquisition near Ann Arbor, Michigan, has been reviewed by our Eastern Field Operation Center, Pittsburgh. The proposed park will require 3,501 acres of land. Of this area, about 618 acres will b...

"synopsis" may belong to another edition of this title.

(No Available Copies)

Search Books:



Create a Want

If you know the book but cannot find it on AbeBooks, we can automatically search for it on your behalf as new inventory is added. If it is added to AbeBooks by one of our member booksellers, we will notify you!

Create a Want