The Gantt Chart, a Working Tool of Management;

 
9781290838634: The Gantt Chart, a Working Tool of Management;
View all copies of this ISBN edition:
 
 

Unlike some other reproductions of classic texts (1) We have not used OCR(Optical Character Recognition), as this leads to bad quality books with introduced typos. (2) In books where there are images such as portraits, maps, sketches etc We have endeavoured to keep the quality of these images, so they represent accurately the original artefact. Although occasionally there may be certain imperfections with these old texts, we feel they deserve to be made available for future generations to enjoy.

"synopsis" may belong to another edition of this title.

Buy New View Book
List Price: US$ 9.95
US$ 13.82

Convert Currency

Shipping: US$ 6.25
From India to U.S.A.

Destination, Rates & Speeds

Add to Basket

Top Search Results from the AbeBooks Marketplace

1.

ISBN 10: 1290838631 ISBN 13: 9781290838634
New Paperback Aug 01, 2012 Quantity Available: 2
Seller:
Bookshopee US
(Thane, India)
Rating
[?]

Book Description Paperback Aug 01, 2012. Condition: New. Seller Inventory # BSNW9781290838634

More Information About This Seller | Contact this Seller

Buy New
US$ 13.82
Convert Currency

Add to Basket

Shipping: US$ 6.25
From India to U.S.A.
Destination, Rates & Speeds

2.

Published by Hardpress Publishing, United States (2012)
ISBN 10: 1290838631 ISBN 13: 9781290838634
New Paperback Quantity Available: 10
Print on Demand
Seller:
Book Depository International
(London, United Kingdom)
Rating
[?]

Book Description Hardpress Publishing, United States, 2012. Paperback. Condition: New. Language: English . Brand New Book ***** Print on Demand *****. Unlike some other reproductions of classic texts (1) We have not used OCR(Optical Character Recognition), as this leads to bad quality books with introduced typos. (2) In books where there are images such as portraits, maps, sketches etc We have endeavoured to keep the quality of these images, so they represent accurately the original artefact. Although occasionally there may be certain imperfections with these old texts, we feel they deserve to be made available for future generations to enjoy. Seller Inventory # AAV9781290838634

More Information About This Seller | Contact this Seller

Buy New
US$ 20.95
Convert Currency

Add to Basket

Shipping: FREE
From United Kingdom to U.S.A.
Destination, Rates & Speeds

3.

Published by Hardpress Publishing
ISBN 10: 1290838631 ISBN 13: 9781290838634
New Paperback Quantity Available: > 20
Print on Demand
Seller:
BuySomeBooks
(Las Vegas, NV, U.S.A.)
Rating
[?]

Book Description Hardpress Publishing. Paperback. Condition: New. This item is printed on demand. 188 pages. Dimensions: 9.0in. x 6.0in. x 0.4in.Unlike some other reproductions of classic texts (1) We have not used OCR(Optical Character Recognition), as this leads to bad quality books with introduced typos. (2) In books where there are images such as portraits, maps, sketches etc We have endeavoured to keep the quality of these images, so they represent accurately the original artefact. Although occasionally there may be certain imperfections with these old texts, we feel they deserve to be made available for future generations to enjoy. This item ships from La Vergne,TN. Paperback. Seller Inventory # 9781290838634

More Information About This Seller | Contact this Seller

Buy New
US$ 20.96
Convert Currency

Add to Basket

Shipping: FREE
Within U.S.A.
Destination, Rates & Speeds

4.

Published by Hardpress Publishing, United States (2012)
ISBN 10: 1290838631 ISBN 13: 9781290838634
New Paperback Quantity Available: 10
Print on Demand
Seller:
The Book Depository
(London, United Kingdom)
Rating
[?]

Book Description Hardpress Publishing, United States, 2012. Paperback. Condition: New. Language: English . Brand New Book ***** Print on Demand *****.Unlike some other reproductions of classic texts (1) We have not used OCR(Optical Character Recognition), as this leads to bad quality books with introduced typos. (2) In books where there are images such as portraits, maps, sketches etc We have endeavoured to keep the quality of these images, so they represent accurately the original artefact. Although occasionally there may be certain imperfections with these old texts, we feel they deserve to be made available for future generations to enjoy. Seller Inventory # AAV9781290838634

More Information About This Seller | Contact this Seller

Buy New
US$ 22.75
Convert Currency

Add to Basket

Shipping: FREE
From United Kingdom to U.S.A.
Destination, Rates & Speeds