Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that "feedback" (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not sa ti sfy the foregoi ng res tri cti ons.
"synopsis" may belong to another edition of this title.
US$ 2.64 shipping within U.S.A.
Destination, rates & speedsSeller: GreatBookPrices, Columbia, MD, U.S.A.
Condition: New. Seller Inventory # 18681828-n
Quantity: 15 available
Seller: Grand Eagle Retail, Mason, OH, U.S.A.
Paperback. Condition: new. Paperback. Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that "feedback" (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not sa ti sfy the foregoi ng res tri cti ons. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. Shipping may be from multiple locations in the US or from the UK, depending on stock availability. Seller Inventory # 9783540097051
Quantity: 1 available
Seller: Lucky's Textbooks, Dallas, TX, U.S.A.
Condition: New. Seller Inventory # ABLIING23Mar3113020158628
Quantity: Over 20 available
Seller: Best Price, Torrance, CA, U.S.A.
Condition: New. SUPER FAST SHIPPING. Seller Inventory # 9783540097051
Quantity: 2 available
Seller: GreatBookPrices, Columbia, MD, U.S.A.
Condition: As New. Unread book in perfect condition. Seller Inventory # 18681828
Quantity: 15 available
Seller: NEPO UG, Rüsselsheim am Main, Germany
kart. Condition: Sehr gut. 268 S. : graph. Darst. , 25 cm Sofort verfügbar Versand am folgenden Arbeitstag mit Rechnung daily shipping wordwide with invoice ex library Sprache: Deutsch Gewicht in Gramm: 550. Seller Inventory # 99773
Quantity: 1 available
Seller: Ria Christie Collections, Uxbridge, United Kingdom
Condition: New. In. Seller Inventory # ria9783540097051_new
Quantity: Over 20 available
Seller: Chiron Media, Wallingford, United Kingdom
Paperback. Condition: New. Seller Inventory # 6666-IUK-9783540097051
Quantity: 10 available
Seller: Books Puddle, New York, NY, U.S.A.
Condition: New. pp. 276. Seller Inventory # 2658571008
Quantity: 4 available
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that 'feedback' (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not sa ti sfy the foregoi ng res tri cti ons. 276 pp. Englisch. Seller Inventory # 9783540097051
Quantity: 2 available