The 4th the line Dongjiadu: Shanghai Rail Transit restoration project(Chinese Edition)

 
9787560839585: The 4th the line Dongjiadu: Shanghai Rail Transit restoration project(Chinese Edition)
View all copies of this ISBN edition:
 
 

Paperback. Pub Date: December 2008 Pages: 338 Language: Chinese in Publisher: Tongji University Press. is composed of two parts. repair engineering and repair construction. summarizes the Shanghai Rail Transit Line 4 Dongjiadu interval tunnel collapse situ repair works the design. construction. and other aspects of the technology and experience. It combines the soft soil layer track buried deep tunnel large-scale collapse after the in situ restoration project highlights disturbance strata complex environment 40m deep foundation design. construction and environmental protection. new technologies. new processes. new equipment. new materials. The project is the first time in more than 60m of soft soil layer construction a super deep underground continuous wall. the first application of the full rotary rigs large area of ??super deep underground complex obstacles cleanup constru...

"synopsis" may belong to another edition of this title.

Top Search Results from the AbeBooks Marketplace

1.

SHANG HAI SUI DAO GONG CHENG GU FEN YOU XIAN GONG SI SHANG HAI SHEN TONG DI TIE JI TUAN YOU XIAN ...
ISBN 10: 7560839584 ISBN 13: 9787560839585
New paperback Quantity Available: 10
Seller:
liu xing
(JiangSu, JS, China)
Rating
[?]

Book Description paperback. Condition: New. Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Pages Number: 338 Publisher: Tongji University Pub. Date :2008-12-01 version 1. Contents: Engineering design procedures outlined in chapter 1 1.1 Project Background 1.2 1.3 restoration project repaired the general principles of engineering design of the general idea 1.4 1.5 restoration project designed to repair the main content of the course of two engineering major repair projects overall design of the surrounding environment restoration project 2.1 2.2 2.3 bridge restoration rehabilitation program overall program situ remediation program 2 2.4 2.6 .5 repair program repair the main risk repair project selection 2.7 Conclusion 3 Comparison and Selection of restoration of the natural environment and the surrounding geological environment 3.1 3.2 3.3 Engineering geological conditions of site hydrogeological conditions of site 4 lines 4.1 Design Overview 4.2 overall restoration design line 5 range of architectural design architectural design 5.1 5.3 5.2 Project Overview architectural design architectural design principles 6 5.4 6.1 structural design structural design of the land section 6. 2 River to connect the middle section of the structural design 6.3 Subsurface structural waterproofing and structural design of the durability design of 7 waterproof design principles 7.1 7.2 7.3 cut-and water level standard tunneling segment segment Waterproof Waterproof design 8 7.4 Environmental Design 8.1 Overview 8.2 based Riverside Garden Building materials 8.3 pairs of control theory and method of calculating the standard 8.4 8.5 Riverside Garden part of the pile of building failure analysis of the stability of 8.6 8.7 Stress analysis of the pile in the foam pit wall underground tank Shen impact analysis of building a stable 8.8 East and West. the excavation for building stable analysis and evaluation of impact analysis 8.9 Conclusion 9 9 Environmental Control Design .1 9.2 Overview of design principles and design standards for the range 9.3 9.4 tunnel ventilation. smoke control system design 9.5 space ventilation and air conditioning equipment automatic control system design design 9.7 9.6 10 to the drainage and environmental protection 10.1 of the original fire range system layout design brief paragraph 10.2 range repair power system design 11 lighting design 11.1 Overview 11.2 11.3 power supply system design lighting design construction chapter 12 Overview 12.1 rehabilitation engineering background 12.2 12.3 Repair engineering geology and environmental restoration projects outlined in the demonstration program to determine the 13 repair and optimize the preliminary research and testing 13.1 13.2 13.3 comparison and selection of program verification and program overview of the overall 13-situ remediation. 4 restoration of the main difficulties in 13.5 major rehabilitation program to optimize the construction of 14 restoration projects in the river craft and technology 14.1 14.2 cofferdam steel platform and deep underground obstructions and clean cutting techniques 14.3 ultra deep underground wall construction Foundation Reinforcement 14.4 14.5 14.6 Construction of precipitation pressure water excavation and structural reinforcement to freeze production of 14.7 and 14.8 to build a tunnel bored pumping clean up construction projects and environmental monitoring 15.1 15 pit Construction Monitoring 15.2 15.3 Jiang precipitation monitoring the level of the middle wall of frozen real-time dynamic monitoring of remote monitoring and analysis 15.4 16 restoration project risk control and management 16.1 16.2 main construction risk management processes outlined in the risk analysis PostscriptFour Satisfaction guaranteed,or money back. Seller Inventory # LH6010

More information about this seller | Contact this seller

Buy New
US$ 114.26
Convert currency

Add to Basket

Shipping: FREE
From China to U.S.A.
Destination, rates & speeds

2.

SHANG HAI SUI DAO GONG CHENG GU FEN YOU XIAN GONG SI SHANG HAI SHEN TONG DI TIE JI TUAN YOU XIAN GONG SI SHANG HAI SHI SUI DAO GONG CHENG GUI DAO JIAO TONG SHE JI YAN JIU YUAN
ISBN 10: 7560839584 ISBN 13: 9787560839585
New paperback Quantity Available: 1
Seller:
liu xing
(JiangSu, JS, China)
Rating
[?]

Book Description paperback. Condition: New. Paperback. Pub Date: December 2008 Pages: 338 Language: Chinese in Publisher: Tongji University Press. is composed of two parts. repair engineering and repair construction. summarizes the Shanghai Rail Transit Line 4 Dongjiadu interval tunnel collapse situ repair works the design. construction. and other aspects of the technology and experience. It combines the soft soil layer track buried deep tunnel large-scale collapse after the in situ restoration project highlights disturbance strata com. Seller Inventory # CB026084

More information about this seller | Contact this seller

Buy New
US$ 126.83
Convert currency

Add to Basket

Shipping: FREE
From China to U.S.A.
Destination, rates & speeds