The Integration of Industrialized Building System (IBS) with BIM: A concept and Theory to Improve Construction Industry Productivity - Softcover

9783659263309: The Integration of Industrialized Building System (IBS) with BIM: A concept and Theory to Improve Construction Industry Productivity
View all copies of this ISBN edition:
 
 
Construction industry is becoming increasingly technology-oriented. Currently, modern IT based, mechanized based and software-based processes and tools play an active role in developing construction industry. Although many researchers have studied Building Information Modelling (BIM) and Industrialized Building System (IBS), but these topics have been rarely studied together. Hence, there is a gap between integration and coordination of IBS into BIM. In order to implement IBS into BIM successfully, specific frameworks and standards ought to be determined, developed and embedded in BIM software. At the present time, the construction industry is lacking information concerning predefined IBS geometrics and components, which can be used in BIM. This book is to integrate IBS with BIM by the virtue of solving and covering the existing functionality gap between BIM and IBS in order to increase the productivity and efficiency in the construction industry.

"synopsis" may belong to another edition of this title.

About the Author:
Saeed Banihashemi Namini, M.Sc: Studied Construction Management at University Technology Malaysia(UTM). Research Assistant at UTM., Kuala Lumpur.

"About this title" may belong to another edition of this title.

Top Search Results from the AbeBooks Marketplace

Stock Image

Banihashemi Namini, Saeed
ISBN 10: 3659263303 ISBN 13: 9783659263309
New Softcover Quantity: > 20
Seller:
Lucky's Textbooks
(Dallas, TX, U.S.A.)

Book Description Condition: New. Seller Inventory # ABLIING23Mar3113020274241

More information about this seller | Contact seller

Buy New
US$ 60.62
Convert currency

Add to Basket

Shipping: US$ 3.99
Within U.S.A.
Destination, rates & speeds
Stock Image

Banihashemi Namini Saeed
ISBN 10: 3659263303 ISBN 13: 9783659263309
New Softcover Quantity: > 20
Print on Demand
Seller:
Ria Christie Collections
(Uxbridge, United Kingdom)

Book Description Condition: New. PRINT ON DEMAND Book; New; Fast Shipping from the UK. No. book. Seller Inventory # ria9783659263309_lsuk

More information about this seller | Contact seller

Buy New
US$ 67.42
Convert currency

Add to Basket

Shipping: US$ 12.43
From United Kingdom to U.S.A.
Destination, rates & speeds
Stock Image

Banihashemi Namini Saeed
ISBN 10: 3659263303 ISBN 13: 9783659263309
New PF Quantity: 10
Seller:
Chiron Media
(Wallingford, United Kingdom)

Book Description PF. Condition: New. Seller Inventory # 6666-IUK-9783659263309

More information about this seller | Contact seller

Buy New
US$ 63.03
Convert currency

Add to Basket

Shipping: US$ 18.68
From United Kingdom to U.S.A.
Destination, rates & speeds
Stock Image

Banihashemi Namini Saeed
ISBN 10: 3659263303 ISBN 13: 9783659263309
New PAP Quantity: > 20
Print on Demand
Seller:
PBShop.store US
(Wood Dale, IL, U.S.A.)

Book Description PAP. Condition: New. New Book. Shipped from UK. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Seller Inventory # L0-9783659263309

More information about this seller | Contact seller

Buy New
US$ 85.89
Convert currency

Add to Basket

Shipping: FREE
Within U.S.A.
Destination, rates & speeds
Seller Image

Saeed Banihashemi Namini
ISBN 10: 3659263303 ISBN 13: 9783659263309
New Taschenbuch Quantity: 2
Print on Demand
Seller:
BuchWeltWeit Ludwig Meier e.K.
(Bergisch Gladbach, Germany)

Book Description Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Construction industry is becoming increasingly technology-oriented. Currently, modern IT based, mechanized based and software-based processes and tools play an active role in developing construction industry. Although many researchers have studied Building Information Modelling (BIM) and Industrialized Building System (IBS), but these topics have been rarely studied together. Hence, there is a gap between integration and coordination of IBS into BIM. In order to implement IBS into BIM successfully, specific frameworks and standards ought to be determined, developed and embedded in BIM software. At the present time, the construction industry is lacking information concerning predefined IBS geometrics and components, which can be used in BIM. This book is to integrate IBS with BIM by the virtue of solving and covering the existing functionality gap between BIM and IBS in order to increase the productivity and efficiency in the construction industry. 160 pp. Englisch. Seller Inventory # 9783659263309

More information about this seller | Contact seller

Buy New
US$ 65.02
Convert currency

Add to Basket

Shipping: US$ 24.61
From Germany to U.S.A.
Destination, rates & speeds
Stock Image

Banihashemi Namini Saeed
ISBN 10: 3659263303 ISBN 13: 9783659263309
New PAP Quantity: > 20
Print on Demand
Seller:
PBShop.store UK
(Fairford, GLOS, United Kingdom)

Book Description PAP. Condition: New. New Book. Delivered from our UK warehouse in 4 to 14 business days. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Seller Inventory # L0-9783659263309

More information about this seller | Contact seller

Buy New
US$ 69.71
Convert currency

Add to Basket

Shipping: US$ 31.15
From United Kingdom to U.S.A.
Destination, rates & speeds
Seller Image

Saeed Banihashemi Namini
ISBN 10: 3659263303 ISBN 13: 9783659263309
New Taschenbuch Quantity: 2
Print on Demand
Seller:
AHA-BUCH GmbH
(Einbeck, Germany)

Book Description Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Construction industry is becoming increasingly technology-oriented. Currently, modern IT based, mechanized based and software-based processes and tools play an active role in developing construction industry. Although many researchers have studied Building Information Modelling (BIM) and Industrialized Building System (IBS), but these topics have been rarely studied together. Hence, there is a gap between integration and coordination of IBS into BIM. In order to implement IBS into BIM successfully, specific frameworks and standards ought to be determined, developed and embedded in BIM software. At the present time, the construction industry is lacking information concerning predefined IBS geometrics and components, which can be used in BIM. This book is to integrate IBS with BIM by the virtue of solving and covering the existing functionality gap between BIM and IBS in order to increase the productivity and efficiency in the construction industry. Seller Inventory # 9783659263309

More information about this seller | Contact seller

Buy New
US$ 65.80
Convert currency

Add to Basket

Shipping: US$ 35.30
From Germany to U.S.A.
Destination, rates & speeds
Seller Image

Saeed Banihashemi Namini
ISBN 10: 3659263303 ISBN 13: 9783659263309
New Softcover Quantity: > 20
Print on Demand
Seller:
moluna
(Greven, Germany)

Book Description Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Banihashemi Namini SaeedSaeed Banihashemi Namini, M.Sc: Studied Construction Management at University Technology Malaysia(UTM). Research Assistant at UTM., Kuala Lumpur.Construction industry is becoming increasingly technology-or. Seller Inventory # 5144069

More information about this seller | Contact seller

Buy New
US$ 54.29
Convert currency

Add to Basket

Shipping: US$ 52.42
From Germany to U.S.A.
Destination, rates & speeds