An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Emphasis is not on the mathematics--the stress here is on the solution of problems commonly encountered in construction practice.
"synopsis" may belong to another edition of this title.
US$ 3.75 shipping within U.S.A.
Destination, rates & speedsSeller: HPB-Red, Dallas, TX, U.S.A.
paperback. Condition: Acceptable. Connecting readers with great books since 1972. Used textbooks may not include companion materials such as access codes, etc. May have condition issues including wear and notes/highlighting. We ship orders daily and Customer Service is our top priority! Seller Inventory # S_441286446
Quantity: 1 available
Seller: Bank of Books, Ventura, CA, U.S.A.
paperback. Condition: Good. Ex-Library book. No dust jacket. Book has black covers with red and gold titles. Book shows common (average) signs of wear and use. Binding is still tight. Covers are intact but may be repaired. We have 75,000 books to choose from -- Ship within 24 hours -- Satisfaction Guaranteed! Seller Inventory # mon0000937086
Quantity: 1 available
Seller: Bingo Books 2, Vancouver, WA, U.S.A.
Hardcover. Condition: Very Good. 2nd Edition. second edition hardback book in very good condition,name at top of first blank page. Seller Inventory # 121576
Quantity: 1 available
Seller: Bingo Used Books, Vancouver, WA, U.S.A.
Hardcover. Condition: Very Good. Dust Jacket Condition: Very Good. 2nd Edition. hardback in very good+ condition with very good- dust jacket. 2nd edition. Seller Inventory # 118018
Quantity: 1 available
Seller: BookDepart, Shepherdstown, WV, U.S.A.
Hardcover. Condition: UsedGood. Hardcover, second edition; surplus library copy with the usual stampings; reference number taped to spine; fading and edge wear to exterior; otherwise in good condition with clean text, firm binding. Seller Inventory # 53737
Quantity: 1 available
Seller: Mr Pickwick's Fine Old Books, Katoomba, NSW, Australia
Hardcover (Original Cloth). Condition: Very Good. Dust Jacket Condition: No Dust Jacket. Second Edition. One of a collection of 150 specialist Trade books, including carpentry, wood turning, wooden boat building,stonemasonry, blacksmithing, tile making and the like. All are available for sale at this site. Use the special keyword pickwicktrade to compile an on-screen list of all these still available. Size: Octavo (standard book size). 414 pages. Text body is clean, and free from previous owner annotation, underlining and highlighting. Binding is tight, covers and spine fully intact. No foxing in this copy. Edges browned slightly. Quantity Available: 1. Shipped Weight: Under 1 kilogram. Category: Engineering, Industrial, Trade; ISBN: 0471032468. ISBN/EAN: 9780471032465. All our pictures shown here are of the actual item, not stock photos. Inventory No: 32060: Main Trade For further info on this title, click on the "Contact Seller" button within this listing. We will try to reply within 24 hours. Otherwise you can order right now (inclusive of shipping options) from the "Add to Basket" button to the right. Seller Inventory # 32060
Quantity: 1 available