Book by Antill James M Woodhead Ronald W
"synopsis" may belong to another edition of this title.
Seller: HPB-Red, Dallas, TX, U.S.A.
Hardcover. Condition: Acceptable. Connecting readers with great books since 1972. Used textbooks may not include companion materials such as access codes, etc. May have condition issues including wear and notes/highlighting. We ship orders daily and Customer Service is our top priority! Seller Inventory # S_447783455
Seller: BookDepart, Shepherdstown, WV, U.S.A.
Hardcover. Condition: UsedGood. Hardcover; 3rd edition; technical library copy with minimal stampings; refe rence number taped to the spine; fading, soiling, and edge wear to exterior; bump to the upper front corner; in good condition with clean text and tig ht binding. Seller Inventory # 89206
Seller: Anybook.com, Lincoln, United Kingdom
Condition: Fair. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. In fair condition, suitable as a study copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,850grams, ISBN:0471866121. Seller Inventory # 3943250
Quantity: 1 available
Seller: Bingo Books 2, Vancouver, WA, U.S.A.
Hardcover. Condition: Near Fine. 3rd Edition. 3rd edition hardback book in near fine condition. Seller Inventory # 318253
Seller: Bingo Books 2, Vancouver, WA, U.S.A.
Hardcover. Condition: Near Fine. Dust Jacket Condition: Very Good. 3rd Edition. 3rd edition hardback book in near fine condition,dust jacket is very good. Seller Inventory # 127156