Construction projects involve a complex set of relationships, between parties with different professional backgrounds trying to achieve a very complex goal. Under these difficult circumstances, the quality of information on which projects are based should be of the highest possible standard. The line-based, two dimensional drawings on which conventional construction is based render this all but impossible. This is the source of some major shortcomings in the construction industry, and this book focuses on the two most fundamental of these: the failure to deliver projects predictably: to the required quality, on time and within budget; and the failure of most firms in the industry to make a survivable level of profit. By transforming the quality of information used in building, BIM aims to transform construction completely.
After describing and explaining these problems, the way in which BIM promises to provide solutions is examined in detail. A discussion of the theory and practice of BIM is also provided, followed by a review of various recent surveys of BIM usage in the US, UK and selected European economies. The way in which other industries, including retail and manufacturing, have been transformed by information are explored and compared with current developments in the deployment of BIM in construction. Five case studies from the UK show how BIM is being implemented, and the effects it is having on architects and contractors.
This book is perfect for any construction professional interested in improving the efficiency of their business, as well as undergraduate and postgraduate students wishing to understand the importance of BIM.
"synopsis" may belong to another edition of this title.
Ray Crotty worked in a variety of management control roles on North Sea projects with Bechtel, Phillips Petroleum and Shell, before going on to spend 10 years with Bovis. He devised and implemented the extranet-based document management and communications systems – the earliest known project collaboration system – used on the Bluewater project in Kent, England. He founded C3 Systems Ltd in 1999 to develop the Bluewater ideas and to generalise their use in the industry. He was a founding member of the UK chapter of BuildingSMART (formerly IAI).
"About this title" may belong to another edition of this title.
US$ 88.12 shipping from United Kingdom to U.S.A.
Destination, rates & speedsSeller: GreatBookPrices, Columbia, MD, U.S.A.
Condition: New. Seller Inventory # 25818791-n
Quantity: Over 20 available
Seller: Best Price, Torrance, CA, U.S.A.
Condition: New. SUPER FAST SHIPPING. Seller Inventory # 9781138690868
Quantity: 2 available
Seller: Books Puddle, New York, NY, U.S.A.
Condition: New. pp. 232. Seller Inventory # 26374586651
Quantity: 4 available
Seller: Majestic Books, Hounslow, United Kingdom
Condition: New. pp. 232. Seller Inventory # 371458756
Quantity: 3 available
Seller: PBShop.store US, Wood Dale, IL, U.S.A.
PAP. Condition: New. New Book. Shipped from UK. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Seller Inventory # IQ-9781138690868
Quantity: 15 available
Seller: PBShop.store UK, Fairford, GLOS, United Kingdom
PAP. Condition: New. New Book. Delivered from our UK warehouse in 4 to 14 business days. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Seller Inventory # L0-9781138690868
Quantity: Over 20 available
Seller: THE SAINT BOOKSTORE, Southport, United Kingdom
Paperback / softback. Condition: New. New copy - Usually dispatched within 4 working days. 431. Seller Inventory # B9781138690868
Quantity: 1 available
Seller: Biblios, Frankfurt am main, HESSE, Germany
Condition: New. PRINT ON DEMAND pp. 232. Seller Inventory # 18374586641
Quantity: 4 available
Seller: Ria Christie Collections, Uxbridge, United Kingdom
Condition: New. In. Seller Inventory # ria9781138690868_new
Quantity: Over 20 available
Seller: GreatBookPricesUK, Woodford Green, United Kingdom
Condition: New. Seller Inventory # 25818791-n
Quantity: Over 20 available