Items related to Small Wind Turbine Installation Compatibility Demonstration...

Small Wind Turbine Installation Compatibility Demonstration Methodology - Softcover

 
9781508902041: Small Wind Turbine Installation Compatibility Demonstration Methodology

Synopsis

The objective of this project was to assess the compatibility of small wind turbines ( 100 kW) with Army installations, using Fort Drum, New York, for demonstration. Using one 7.7-kW horizontal-axis wind turbine (HAWT) and one 2.9-kW vertical-axis wind turbine (VAWT), we planned to measure radar, acoustic and seismic, turbulence, bird and bat, cold, and icing effects. We also intended to indicate if small wind turbines (SWT), in few and large numbers, are compatible with Army installations. A planned product was the Army’s first Unified Facilities Criteria, addressing the installation of small wind turbines at Army facilities, which would guide installation energy managers in understanding the permitting, installation, and performance of VAWTs and HAWTs in a semi-complex environment. This report describes research executed in FY11 in preparation for wind turbine installation and Intensive Operational Periods of measurements that were planned to be conducted in FY12. Research products include preliminary laboratory or limited field radar, seismic-acoustic, turbulence, and bird and bat results to demonstrate methodologies prior to field use, the permitting process and turbine and site selection processes, and the methodologies proposed for determining icing effects. Because of budget cuts experienced by the funding organization, they did not provide project funding after FY11; therefore, this report discusses the tasks and Army deliverable originally planned for FY12 and FY13.

"synopsis" may belong to another edition of this title.

Buy New

View this item

US$ 11.94 shipping from United Kingdom to U.S.A.

Destination, rates & speeds

Search results for Small Wind Turbine Installation Compatibility Demonstration...

Stock Image

U S Army Corps of Engineers
ISBN 10: 1508902046 ISBN 13: 9781508902041
New Paperback / softback
Print on Demand

Seller: THE SAINT BOOKSTORE, Southport, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Paperback / softback. Condition: New. This item is printed on demand. New copy - Usually dispatched within 5-9 working days 216. Seller Inventory # C9781508902041

Contact seller

Buy New

US$ 21.95
Convert currency
Shipping: US$ 11.94
From United Kingdom to U.S.A.
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

Stock Image

U.S. Army Corps of Engineers
ISBN 10: 1508902046 ISBN 13: 9781508902041
New Paperback

Seller: CitiRetail, Stevenage, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Paperback. Condition: new. Paperback. The objective of this project was to assess the compatibility of small wind turbines ( 100 kW) with Army installations, using Fort Drum, New York, for demonstration. Using one 7.7-kW horizontal-axis wind turbine (HAWT) and one 2.9-kW vertical-axis wind turbine (VAWT), we planned to measure radar, acoustic and seismic, turbulence, bird and bat, cold, and icing effects. We also intended to indicate if small wind turbines (SWT), in few and large numbers, are compatible with Army installations. A planned product was the Army's first Unified Facilities Criteria, addressing the installation of small wind turbines at Army facilities, which would guide installation energy managers in understanding the permitting, installation, and performance of VAWTs and HAWTs in a semi-complex environment. This report describes research executed in FY11 in preparation for wind turbine installation and Intensive Operational Periods of measurements that were planned to be conducted in FY12. Research products include preliminary laboratory or limited field radar, seismic-acoustic, turbulence, and bird and bat results to demonstrate methodologies prior to field use, the permitting process and turbine and site selection processes, and the methodologies proposed for determining icing effects. Because of budget cuts experienced by the funding organization, they did not provide project funding after FY11; therefore, this report discusses the tasks and Army deliverable originally planned for FY12 and FY13. Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability. Seller Inventory # 9781508902041

Contact seller

Buy New

US$ 25.52
Convert currency
Shipping: US$ 49.58
From United Kingdom to U.S.A.
Destination, rates & speeds

Quantity: 1 available

Add to basket