Items related to Resource-Constrained Project Scheduling: Models, Algorithms,...

Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications - Hardcover

 
9781848210349: Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications

Synopsis

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.
In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided.
The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations.
The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.

"synopsis" may belong to another edition of this title.

About the Author

Christian Artigues is a researcher at the Laboratory for Analysis and
Architecture of Systems (LAAS) of the French National Institute for
Scientific Research (CNRS).

Sophie Demassey is an Assistant Professor at the School of Mining Engineering (EMN), Nantes, France.

Emmanuel Néron is Assistant Professor at the Computer Science Department of Polytech'Tours, France, and is a member of the Computer Science Laboratory of the University of Tours, France.

From the Back Cover

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.
In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided.
The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations.
The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.

From the Inside Flap

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.
In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided.
The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations.
The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.

"About this title" may belong to another edition of this title.

Buy Used

Condition: As New
Unread book in perfect condition...
View this item

US$ 2.64 shipping within U.S.A.

Destination, rates & speeds

Buy New

View this item

US$ 60.80 shipping from United Kingdom to U.S.A.

Destination, rates & speeds

Other Popular Editions of the Same Title

9781905209729: Resources-constrained Project Scheduling: Models, Algorithms, Extensions and Applications

Featured Edition

ISBN 10:  190520972X ISBN 13:  9781905209729
Publisher: Iste/Hermes Science Pub
Hardcover

Search results for Resource-Constrained Project Scheduling: Models, Algorithms,...

Stock Image

Christian Artigues (Editor), Sophie Demassey (Editor), Emmanuel Néron (Editor)
Published by Wiley-Blackwell, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
New Hardcover

Seller: New Book Sale, London, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Hardcover. Condition: New. Usually Dispatched within 1-2 Business Days , Buy with confidence , excellent customer service. Seller Inventory # 1848210345--A29

Contact seller

Buy New

US$ 48.71
Convert currency
Shipping: US$ 60.80
From United Kingdom to U.S.A.
Destination, rates & speeds

Quantity: 1 available

Add to basket

Seller Image

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Published by Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
New Hardcover

Seller: GreatBookPrices, Columbia, MD, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: New. Seller Inventory # 5510716-n

Contact seller

Buy New

US$ 161.45
Convert currency
Shipping: US$ 2.64
Within U.S.A.
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

Stock Image

Editor: Christian Artigues (French National Institute for Scientific Research (CNRS)); Editor: Sophie Demassey (School of Mining Engineering (EMN), Nantes, France); Editor: Emmanuel Néron (Computer Science Department of Polytech'Tours, France)
Published by John Wiley and Sons, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
New Hardcover

Seller: INDOO, Avenel, NJ, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: New. Brand New. Seller Inventory # 9781848210349

Contact seller

Buy New

US$ 164.10
Convert currency
Shipping: FREE
Within U.S.A.
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

Seller Image

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Published by Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Used Hardcover

Seller: GreatBookPrices, Columbia, MD, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: As New. Unread book in perfect condition. Seller Inventory # 5510716

Contact seller

Buy Used

US$ 185.94
Convert currency
Shipping: US$ 2.64
Within U.S.A.
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

Stock Image

Christian Artigues
ISBN 10: 1848210345 ISBN 13: 9781848210349
New Hardcover First Edition

Seller: Grand Eagle Retail, Mason, OH, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Hardcover. Condition: new. Hardcover. This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. Shipping may be from multiple locations in the US or from the UK, depending on stock availability. Seller Inventory # 9781848210349

Contact seller

Buy New

US$ 209.99
Convert currency
Shipping: FREE
Within U.S.A.
Destination, rates & speeds

Quantity: 1 available

Add to basket

Seller Image

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Published by Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Used Hardcover

Seller: GreatBookPricesUK, Woodford Green, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: As New. Unread book in perfect condition. Seller Inventory # 5510716

Contact seller

Buy Used

US$ 199.02
Convert currency
Shipping: US$ 20.27
From United Kingdom to U.S.A.
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

Stock Image

Published by Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
New Hardcover

Seller: Ubiquity Trade, Miami, FL, U.S.A.

Seller rating 3 out of 5 stars 3-star rating, Learn more about seller ratings

Condition: New. Brand new! Please provide a physical shipping address. Seller Inventory # 9781848210349

Contact seller

Buy New

US$ 237.10
Convert currency
Shipping: US$ 3.00
Within U.S.A.
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

Seller Image

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Published by Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
New Hardcover

Seller: GreatBookPricesUK, Woodford Green, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: New. Seller Inventory # 5510716-n

Contact seller

Buy New

US$ 235.76
Convert currency
Shipping: US$ 20.27
From United Kingdom to U.S.A.
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

Stock Image

Artigues
ISBN 10: 1848210345 ISBN 13: 9781848210349
New Hardcover First Edition

Seller: Kennys Bookshop and Art Galleries Ltd., Galway, GY, Ireland

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: New. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. Editor(s): Artigues, Christian; Demassey, Sophie; Neron, Emmanuel. Series: ISTE. Num Pages: 288 pages, Illustrations. BIC Classification: KJMV5. Category: (UP) Postgraduate, Research & Scholarly. Dimension: 238 x 164 x 22. Weight in Grams: 612. . 2008. 1st Edition. Hardcover. . . . . Seller Inventory # V9781848210349

Contact seller

Buy New

US$ 248.26
Convert currency
Shipping: US$ 12.29
From Ireland to U.S.A.
Destination, rates & speeds

Quantity: 15 available

Add to basket

Seller Image

Artigues, Christian
Published by ISTE LTD, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
New Hardcover

Seller: moluna, Greven, Germany

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Gebunden. Condition: New. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence const. Seller Inventory # 597090960

Contact seller

Buy New

US$ 230.49
Convert currency
Shipping: US$ 57.36
From Germany to U.S.A.
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

There are 2 more copies of this book

View all search results for this book