Blasting is one of the most economical production excavation method in hard rock mines. Few studies about blasting fragmentation exist due to lack of reliable fragmentation data or even obtaining consistent blasting results. Many researchers have attempted to predict blasting fragmentation using the Kuz-rams Model, an empirical fragmentation model suggested by Cunningham (2005).This work attempted to relate the blasting parameters such as the drill hole diameter, the burden, spacing, charge length and explosive weight to the fragmentation size distribution in order to obtain controlled fragmentation blasting. The project also studied the final profile of the excavated wall and adopted a prespliting blasting techniques in order to produce a smooth stable wall, which reduced dilution of the limestone muck piles as well as ensuring no injuries to mine workers and the equipment. Blasting data analysis indicated drastic reduction of material retained from 16.25% to 0.65%, thus the application of these parameters can be used to solve the issue of large risky boulders at the Bissel Quarry as well as reducing the overall cost in size reduction unit operation by avoiding secondary blasting.
"synopsis" may belong to another edition of this title.
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Blasting is one of the most economical production excavation method in hard rock mines. Few studies about blasting fragmentation exist due to lack of reliable fragmentation data or even obtaining consistent blasting results. Many researchers have attempted to predict blasting fragmentation using the Kuz-rams Model, an empirical fragmentation model suggested by Cunningham (2005).This work attempted to relate the blasting parameters such as the drill hole diameter, the burden, spacing, charge length and explosive weight to the fragmentation size distribution in order to obtain controlled fragmentation blasting. The project also studied the final profile of the excavated wall and adopted a prespliting blasting techniques in order to produce a smooth stable wall, which reduced dilution of the limestone muck piles as well as ensuring no injuries to mine workers and the equipment. Blasting data analysis indicated drastic reduction of material retained from 16.25% to 0.65%, thus the application of these parameters can be used to solve the issue of large risky boulders at the Bissel Quarry as well as reducing the overall cost in size reduction unit operation by avoiding secondary blasting. 76 pp. Englisch. Seller Inventory # 9786138693970
Quantity: 2 available
Seller: Books Puddle, New York, NY, U.S.A.
Condition: New. pp. 76. Seller Inventory # 26377682976
Seller: Biblios, Frankfurt am main, HESSE, Germany
Condition: New. PRINT ON DEMAND pp. 76. Seller Inventory # 18377682986
Quantity: 4 available
Seller: moluna, Greven, Germany
Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Mutinda Emmanuel KiambaMR. EMMANUEL KIAMBA MUTINDA holds BSc in Mining and Mineral Processing Engineering and currently pursuing MSc in Mining Engineering at TTU whereas MR. RICHARD MUTHUI KASOMO of TTU is presently pursing his PhD . Seller Inventory # 280826382
Quantity: Over 20 available
Seller: Revaluation Books, Exeter, United Kingdom
Paperback. Condition: Brand New. 76 pages. 8.66x5.91x0.18 inches. In Stock. Seller Inventory # zk6138693973
Quantity: 1 available
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Blasting is one of the most economical production excavation method in hard rock mines. Few studies about blasting fragmentation exist due to lack of reliable fragmentation data or even obtaining consistent blasting results. Many researchers have attempted to predict blasting fragmentation using the Kuz-rams Model, an empirical fragmentation model suggested by Cunningham (2005).This work attempted to relate the blasting parameters such as the drill hole diameter, the burden, spacing, charge length and explosive weight to the fragmentation size distribution in order to obtain controlled fragmentation blasting. The project also studied the final profile of the excavated wall and adopted a prespliting blasting techniques in order to produce a smooth stable wall, which reduced dilution of the limestone muck piles as well as ensuring no injuries to mine workers and the equipment. Blasting data analysis indicated drastic reduction of material retained from 16.25% to 0.65%, thus the application of these parameters can be used to solve the issue of large risky boulders at the Bissel Quarry as well as reducing the overall cost in size reduction unit operation by avoiding secondary blasting.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 76 pp. Englisch. Seller Inventory # 9786138693970
Quantity: 1 available
Seller: AHA-BUCH GmbH, Einbeck, Germany
Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Blasting is one of the most economical production excavation method in hard rock mines. Few studies about blasting fragmentation exist due to lack of reliable fragmentation data or even obtaining consistent blasting results. Many researchers have attempted to predict blasting fragmentation using the Kuz-rams Model, an empirical fragmentation model suggested by Cunningham (2005).This work attempted to relate the blasting parameters such as the drill hole diameter, the burden, spacing, charge length and explosive weight to the fragmentation size distribution in order to obtain controlled fragmentation blasting. The project also studied the final profile of the excavated wall and adopted a prespliting blasting techniques in order to produce a smooth stable wall, which reduced dilution of the limestone muck piles as well as ensuring no injuries to mine workers and the equipment. Blasting data analysis indicated drastic reduction of material retained from 16.25% to 0.65%, thus the application of these parameters can be used to solve the issue of large risky boulders at the Bissel Quarry as well as reducing the overall cost in size reduction unit operation by avoiding secondary blasting. Seller Inventory # 9786138693970
Quantity: 1 available
Seller: preigu, Osnabrück, Germany
Taschenbuch. Condition: Neu. Limestone Production Optimization Using Fragmentation Control | A Case Study of Bissel Quarry, Kenya | Emmanuel Kiamba Mutinda (u. a.) | Taschenbuch | 76 S. | Englisch | 2019 | Scholars' Press | EAN 9786138693970 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. Seller Inventory # 115845727
Quantity: 5 available