This study was conducted between January 2013 and July 2013 in FMU 09019, the main component of forest concession 1036 allocated to Cameroon United Forests (CUF) by provisional agreement No. 1335/CPE/MINEF/CAB of October 25, 2000, in the South Cameroon Region. Its objective was to evaluate the conformity of the legality of FMU 09019 with the requirements of legality grid 1 of the Cameroon VPA-FLEGT. The study was carried out through a documentary analysis, interviews with stakeholders and field visits. The main results obtained revealed the existence of the following irregularities: - Criteria 1, 2, 4 and 5 of the aforementioned grid are not compliant. All their verifiers were not validated during the assessment of the legal compliance of FMU 09019 within the General Directorate of the CUF;- of the fifty-three (53) applicable verifiers assessed, eleven (11) are non-compliant, as they were not verified in the physical form of legal documents required by the FLEGT legality verification process
"synopsis" may belong to another edition of this title.
Seller: Books Puddle, New York, NY, U.S.A.
Condition: New. Seller Inventory # 26396037702
Quantity: 4 available
Seller: Majestic Books, Hounslow, United Kingdom
Condition: New. Print on Demand. Seller Inventory # 401387929
Quantity: 4 available
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -This study was conducted between January 2013 and July 2013 in FMU 09019, the main component of forest concession 1036 allocated to Cameroon United Forests (CUF) by provisional agreement No. 1335/CPE/MINEF/CAB of October 25, 2000, in the South Cameroon Region. Its objective was to evaluate the conformity of the legality of FMU 09019 with the requirements of legality grid 1 of the Cameroon VPA-FLEGT. The study was carried out through a documentary analysis, interviews with stakeholders and field visits. The main results obtained revealed the existence of the following irregularities: - Criteria 1, 2, 4 and 5 of the aforementioned grid are not compliant. All their verifiers were not validated during the assessment of the legal compliance of FMU 09019 within the General Directorate of the CUF;- of the fifty-three (53) applicable verifiers assessed, eleven (11) are non-compliant, as they were not verified in the physical form of legal documents required by the FLEGT legality verification process 80 pp. Englisch. Seller Inventory # 9786204864501
Quantity: 2 available
Seller: Biblios, Frankfurt am main, HESSE, Germany
Condition: New. PRINT ON DEMAND. Seller Inventory # 18396037708
Quantity: 4 available
Seller: moluna, Greven, Germany
Condition: New. Seller Inventory # 628871799
Quantity: Over 20 available
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germany
Taschenbuch. Condition: Neu. Neuware -This study was conducted between January 2013 and July 2013 in FMU 09019, the main component of forest concession 1036 allocated to Cameroon United Forests (CUF) by provisional agreement No. 1335/CPE/MINEF/CAB of October 25, 2000, in the South Cameroon Region. Its objective was to evaluate the conformity of the legality of FMU 09019 with the requirements of legality grid 1 of the Cameroon VPA-FLEGT. The study was carried out through a documentary analysis, interviews with stakeholders and field visits. The main results obtained revealed the existence of the following irregularities: - Criteria 1, 2, 4 and 5 of the aforementioned grid are not compliant. All their verifiers were not validated during the assessment of the legal compliance of FMU 09019 within the General Directorate of the CUF;- of the fifty-three (53) applicable verifiers assessed, eleven (11) are non-compliant, as they were not verified in the physical form of legal documents required by the FLEGT legality verification processBooks on Demand GmbH, Überseering 33, 22297 Hamburg 80 pp. Englisch. Seller Inventory # 9786204864501
Quantity: 2 available
Seller: AHA-BUCH GmbH, Einbeck, Germany
Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - This study was conducted between January 2013 and July 2013 in FMU 09019, the main component of forest concession 1036 allocated to Cameroon United Forests (CUF) by provisional agreement No. 1335/CPE/MINEF/CAB of October 25, 2000, in the South Cameroon Region. Its objective was to evaluate the conformity of the legality of FMU 09019 with the requirements of legality grid 1 of the Cameroon VPA-FLEGT. The study was carried out through a documentary analysis, interviews with stakeholders and field visits. The main results obtained revealed the existence of the following irregularities: - Criteria 1, 2, 4 and 5 of the aforementioned grid are not compliant. All their verifiers were not validated during the assessment of the legal compliance of FMU 09019 within the General Directorate of the CUF;- of the fifty-three (53) applicable verifiers assessed, eleven (11) are non-compliant, as they were not verified in the physical form of legal documents required by the FLEGT legality verification process. Seller Inventory # 9786204864501
Quantity: 1 available