The problem of project performance in the construction sector is a global phenomenon and Zambia's construction industry has not been spared. This work seeks to investigate the factors that are affecting project performance by local constructors in Zambia.The Iron Triangle was used as a theoretical under pinning to the work. This is so because any successful quality of a project or outcome, the project manager needs to balance between the triple constraints.The research adopted the descriptive research design because it tried to describe the actual factors affecting project performance by local constructors. Since both qualitative and quantitative data was sort, a mixed method research design was employed to be specific the convergent parallel design was used.The study concluded that for most of the project undertaken in Choma by the local constructors lack the supervision of qualified consultants attached to the project, as such there is no professional or expert advice to local constructors on the costing, timing and quality of the project.
"synopsis" may belong to another edition of this title.
Seller: California Books, Miami, FL, U.S.A.
Condition: New. Seller Inventory # I-9786208433277
Seller: PBShop.store US, Wood Dale, IL, U.S.A.
PAP. Condition: New. New Book. Shipped from UK. Established seller since 2000. Seller Inventory # L2-9786208433277
Seller: PBShop.store UK, Fairford, GLOS, United Kingdom
PAP. Condition: New. New Book. Shipped from UK. Established seller since 2000. Seller Inventory # L2-9786208433277
Quantity: Over 20 available
Seller: Ria Christie Collections, Uxbridge, United Kingdom
Condition: New. In. Seller Inventory # ria9786208433277_new
Quantity: Over 20 available
Seller: Books Puddle, New York, NY, U.S.A.
Condition: New. Seller Inventory # 26404103211
Seller: Majestic Books, Hounslow, United Kingdom
Condition: New. Print on Demand. Seller Inventory # 409051124
Quantity: 4 available
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -The problem of project performance in the construction sector is a global phenomenon and Zambia's construction industry has not been spared. This work seeks to investigate the factors that are affecting project performance by local constructors in Zambia.The Iron Triangle was used as a theoretical under pinning to the work. This is so because any successful quality of a project or outcome, the project manager needs to balance between the triple constraints.The research adopted the descriptive research design because it tried to describe the actual factors affecting project performance by local constructors. Since both qualitative and quantitative data was sort, a mixed method research design was employed to be specific the convergent parallel design was used.The study concluded that for most of the project undertaken in Choma by the local constructors lack the supervision of qualified consultants attached to the project, as such there is no professional or expert advice to local constructors on the costing, timing and quality of the project. 88 pp. Englisch. Seller Inventory # 9786208433277
Quantity: 2 available
Seller: Biblios, Frankfurt am main, HESSE, Germany
Condition: New. PRINT ON DEMAND. Seller Inventory # 18404103201
Quantity: 4 available
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -The problem of project performance in the construction sector is a global phenomenon and Zambia's construction industry has not been spared. This work seeks to investigate the factors that are affecting project performance by local constructors in Zambia.The Iron Triangle was used as a theoretical under pinning to the work. This is so because any successful quality of a project or outcome, the project manager needs to balance between the triple constraints.The research adopted the descriptive research design because it tried to describe the actual factors affecting project performance by local constructors. Since both qualitative and quantitative data was sort, a mixed method research design was employed to be specific the convergent parallel design was used.The study concluded that for most of the project undertaken in Choma by the local constructors lack the supervision of qualified consultants attached to the project, as such there is no professional or expert advice to local constructors on the costing, timing and quality of the project.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 88 pp. Englisch. Seller Inventory # 9786208433277
Quantity: 1 available
Seller: preigu, Osnabrück, Germany
Taschenbuch. Condition: Neu. Assessing Factors Affecting Project Performance of Local Constructors | A Case Study of Choma District | Shamu Malilwe | Taschenbuch | Englisch | 2025 | LAP LAMBERT Academic Publishing | EAN 9786208433277 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. Seller Inventory # 131851379
Quantity: 5 available