Paperback. Pub 2011-05-01 231 Chinese Dalian University of Technology Press. Cost Control and Case Study (third edition). including a total of determining articles. control papers. training articles . The first chapter to determine the module 1 piece construction project cost control and project cost constituted 1.1 1.2 1.3 Cost of equipment and workers constitutes. appliance purchase fee calculation 1.4 construction and installation costs constitute 1. 1.6 construction contingency calculation 5 other expenses constitute the construction loan interest 1.7 1.8 integrated applications Summary exercises module 2 construction cost is determined on the basis of the construction norms 2.1 2.2 construction BOQ 2.4 2.3 other comprehensive basis for determining the application case summary exercises The second control module chapter ...
"synopsis" may belong to another edition of this title.
Seller: liu xing, Nanjing, JS, China
paperback. Condition: New. Paperback. Pub Date: 2011-05-01 Pages: 231 Language: Chinese Publisher: Dalian University of Technology Press. Cost Control and Case Study (third edition). including a total of three: determining articles. control papers. training articles . Contents: The first chapter to determine the module 1 piece construction project cost control and project cost constituted 1.1 1.2 1.3 Cost of equipment and workers constitutes. appliance purchase fee calculation 1.4 construction and installation costs co. Seller Inventory # DM020524