How to Build a House : A Practical, Common-Sense Guide to Residential Construction
Language: English
Published by Iuniverse, 2011
- Softcover
- New

Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH
AbeBooks seller since August 14, 2006
Condition: New
US$ 34.22
Quantity: 1 available
Add to basketItem description from seller
nach der Bestellung gedruckt Neuware - Printed after ordering - In How to Build a House, author and professional engineer George Michael Rentz, PE is informative and entertaining while taking the mystery out of residential construction. With more than thirty-five years in the construction industry, Rentz provides an overview of the information necessary when you are considering buying or building a new home. From the basics of site selection and design to cost estimates and construction, How to Build a House describes all of the steps integral to residential construction from the ground up. Through personal anecdotes, Rentz shows how developing good plans and selecting the right contractor are key to enjoying the process of watching your new home being constructed. How to Build a House provides insight into the construction process in order to avoid the struggles and hassles often associated with home building.
Seller Inventory # 9781450288613
- Title
- How to Build a House : A Practical, Common-Sense Guide to Residential Construction
- Author
- George Michael Rentz
- Publisher
- Iuniverse
- Publication year
- 2011
- Condition
- Neu
- Binding
- Taschenbuch
- Language
- English
- ISBN 10
- 1450288618
- ISBN 13
- 9781450288613
- Item weight
- 282 grams
- Dimensions
- 229x152x11 mm
Through personal anecdotes, Rentz shows how developing good plans and selecting the right contractor are key to enjoying the process of watching your new home being constructed. How to Build a House provides insight into the construction process in order to avoid the struggles and hassles often associated with home building.
"Synopsis" may belong to another edition of this title.
Excerpt. © Reprinted by permission. All rights reserved.
How to Build a House
A Practical, Common-Sense Guide to Residential ConstructionBy George Michael RentziUniverse, Inc.
Copyright © 2011 George Michael RentzAll right reserved.
ISBN: 978-1-4502-8861-3
Contents
Introduction..............................................................viiChapter 1 Site and House Planning and Design..............................1Chapter 2 Foundations.....................................................19Chapter 3 Masonry and Fireplaces..........................................31Chapter 4 Framing.........................................................43Chapter 5 Roofing.........................................................60Chapter 6 Windows and Exterior Doors......................................65Chapter 7 Exterior Siding.................................................74Chapter 8 Stairs, Ramps, and Elevators....................................81Chapter 9 Exterior Trim Work..............................................86Chapter 10 Plumbing, Fixtures, and Hardware...............................90Chapter 11 Electrical and Lighting........................................97Chapter 12 Heating, Ventilation, and Air Conditioning.....................104Chapter 13 Insulation.....................................................108Chapter 14 Sheetrock and Interior Walls...................................111Chapter 15 Ceramic Tile and Stone.........................................118Chapter 16 Floors.........................................................123Chapter 17 Interior Trim and Cabinets.....................................127Chapter 18 Paint, Finishes, and the Punch List............................135Chapter 19 Glass, Smoke, and Mirrors......................................142Chapter 20 Carpet.........................................................145Chapter 21 Appliances and Furnishings.....................................147Chapter 22 Landscaping....................................................150Chapter 23 Cost and Scheduling............................................153Chapter 24 Warranty and Maintenance.......................................156Conclusion................................................................159Index.....................................................................163
Chapter One
Site and House Planning and DesignThe patch of planet Earth the house will sit on is the house site. The site includes the geographic location—where on the planet you are—and the specific physical characteristics of the earth under and surrounding the house.
The geographic location of the site includes the following considerations:
All of these items must be addressed in the design of the house.
Specific characteristics of the site include the following considerations:
These site characteristics impact the construction cost and time, and the future maintenance of the house.
Choosing the Best Site for Your House
Choosing the best site for your house can be done in two ways. First, do you already know what type of house you want (Spanish, farm, townhouse, etc.) and just need a site to build on? Will any site do as long as you can make it fit the house? Second, do you know what area you want to live in (ocean, mountains, city, subdivision, country), and will you design the house to fit the site (kind of like site-specific art)? I recommend that you choose the area you want to live in and match the house to the site. You still have certain types of houses you like but aren't dead-set on a specific one and nothing else. You're flexible—and they say that's always good, unless you're trying to row a rowboat with a rope. Unless the site you pick is so unrelated to the type of house you like, matching the house to the site is the best way to go. Keep in mind, however, that a New York City townhouse on the top of a peak in the Rocky Mountains just doesn't seem right.
Access to the site is the only thing some people think about when it comes to site considerations. What are the directions to the house? Directions to some houses in the sticks will usually include something like "Turn off the paved road just past the dumpster," but there's more to site access than directions. First, be sure there is a road to the site that can handle construction traffic, such as concrete trucks and building supply trucks. If you have to build a road (not a driveway) to get to your site, you will need to find another source for information. Road construction is a topic separate from residential construction and is not discussed in this book, except to say that relative to the cost of houses, roads are very expensive to build and maintain. If you have to build a road, don't let some levelheaded bulldozer operator talk you into letting him cut your road in for you so he can save you some money. If the chewing tobacco drips from both sides of his mouth at the same time, you know he's levelheaded. In that case, just tell him that when you want to chew some horse dung, you'll let him know. Go hire a civil engineer to design the road and supervise the construction.
Some roads are not designed for highway loads (such as tractor-trailers) and can be seriously damaged by construction traffic. Some roads are too steep for construction traffic, and the construction material will have to be offloaded at the base of a hill and double handled with four-wheel drive forklifts to get to the top. Some sites don't have roads at all. Island sites without bridges will have to use boats and barges to get the construction material to the house site. Sites without proper access for construction material will increase the cost of the construction and the time it takes to build.
Water
The above mentioned questions involving the forces of nature (wind, rain, snow, etc.) for a general area are easily answered by the local building officials and codes and the design professionals (architect, engineers, and contractors). The physical characteristics of the specific site require a little more understanding. This brings me to one of the most important topics a person needs to understand about residential construction: water. You may think I'm getting off the site topic, but bear with me. Water is such an important topic that some aspect of it needs to be addressed now.
I know water sounds kind of simple, and it is, but it's also very important. Ninety percent of all the problems I've seen in houses have involved water. These problems could have been avoided with a little understanding and planning. If you don't think water can cause problems, just try to breathe it.
On earth, water runs downhill and follows the path of least resistance. I think the part about water running downhill was the basis for several doctoral programs at a major university; I could be wrong though. Water flowing at ten miles per hour is approximately equal to the force of wind blowing at a hundred miles per hour. Water is the universal solvent; given enough time, it will dissolve anything. Running water usually purifies itself. Fresh water weights 62.2 pounds per cubic foot, and saltwater weights 64.4 pounds per cubic foot. Water is the only liquid that expands when it freezes. Water is made of hydrogen and oxygen, both highly flammable, yet water does not burn. Cool water on a hot day is one of life's sweet pleasures. Life as we know it on earth, or anywhere else, cannot be sustained very long without water. These are just some of the properties of H2O that we will expand on later.
Water is one of the most important things to plan for when designing a house. To keep it simple, water is good and bad. To give you an example of the good use of water, consider the location of water outlets in the house. There are sinks, tubs, showers, dishwashers, water heaters, icemakers, refrigerators, drinking fountains, washing machines, steam machines, humidifiers, exterior wall faucets, pools, exterior fountains, hot tubs, irrigation, condensation lines, toilets, and the list goes on. People normally associate these water outlets with good feelings, and they should.
Water becomes bad (in fact downright mean) when it is not planned for or is allowed to go uncontrolled in and around a house—for example, water leaks. Leaks occur in pipes, roofs, basements, windows, doors, pools, etc. Just about any place where there is water, it can leak if not controlled. Have you ever tried to find a leak in a roof? Keep in mind that water flows downhill, so where you see the leak coming through the ceiling is usually not where its source is. It's somewhere uphill. Storm water surface runoff and underground water can cause major problems for a house if not controlled. If a house is on a body of water, storm surges and flooding can destroy a house very quickly. Water in the form of snow or ice can collapse a roof. Pipes can freeze and burst. Termites cannot live without water, and mold and fungus cannot grow. Wherever there is an introduction point for water, there must be a discharge point. If there is no discharge point and if the water does not evaporate, it may become stagnant and breed mosquitoes. Water can be really nasty if we allow it to be.
Preventing water from becoming a problem during the life of the house is one of the most important parts of the house and site plan. The areas involving water need careful thought. When proportioning the money to be spent on the various items in the house, do not skimp on the ones involving water. Some typical areas where water can become a problem are roof flashing, gutters, toilets, sinks, water heaters, and anything water is piped to or rain can get to.
I have witnessed many times when people think they're saving money by stopping the tile around the shower just above the showerhead and installing wallpaper or paint from the top of the tile to the ceiling. Any savings in the initial cost of the tile is quickly lost when the wallpaper or paint peels off the wall and mildew grows due to the moisture from the shower. This becomes a maintenance problem and will continue to get worse until the tile is run up to the ceiling.
A second major problem area for water is roofs. One of the dumbest things ever conceived by the construction industry is the concept of flat roofs. These roofs leak and never stop. If not designed stiff enough, they also do a thing called ponding. Flat roofs are supposed to have scuppers four inches or so above the low point in the roof. Most of them do, but the designer forgot to tell the leaves not to clog up the scuppers. Ponding is a situation in a flat roof where the water cannot run off. As the depth of water on the roof increases, the water's weight makes the members sag. When they sag, they make a little pond. The little pond can hold more water, so there's more sag, then more water, then more sag, and so on until everyone involved with the roof gives you their best surprised look—that is, if nobody got hurt.
The third problem area is storm drainage. I have seen houses that have downspouts that empty the storm water directly by the exterior wall of the house and make no previsions for it to drain off. Over time, the soil around the downspout becomes saturated from the water and loses its bearing capacity. Basically the soil turns to mud, and the foundations sink in this area, cracking everything above them.
These are just three of the things this book will help you avoid; we will cover others later on. Where all of the water comes from and goes to in a house must be thought out. If not, you may hear those dripping sounds in the night that remind you of what you read in this book.
We'll get back to water inside the house later in the book. For now, with regard to the site, let's look at how all the water that will come into contact with the site should be addressed.
When it rains, where will the storm water run? Will water from adjacent sites or the street run to your site? When you place your house on the site will you dam the natural runoff of the water? The ideal site for surface runoff or flooding would be one where the house location is, also the highest point in the site. This location would prevent water from running toward the house, and the water from the roof would run away from the house. If the house location is not at the highest elevation on the site, then some water will flow toward the house and must be diverted around the house. This is done with grading the surface with swells (swells are wide, flat ditches) and installing drains around the perimeter of the house.
If your site is on a body of water, you will have to know the high water mark. Some people call this the high high water mark because when the moon is in a certain location, the water is higher on site than normal high water. If your site has tide ranges, you need to know high tide and low tide and storm surge elevations. If you are on a river, you will need to know the hundred-year flood stages. On your specific site, there is an elevation to which the water is not supposed to rise; that's the high water mark. The living space in the house has to be above this elevation, and the remaining structure must be designed for the moving water if it can come in contact with the house.
These high water marks are measured from the elevation of the oceans. If the elevation for your house on your site is 360 feet MSL (mean sea level), this means that the house must be 360 feet above the mean sea level of the ocean. Your site may be 350 feet MSL, in which case your house would be ten feet higher than your site. These numbers vary from site to site and really only come into play if you are on a body of water or in a floodplain. If you are on a body of water, your house must be designed for the worst-case scenario of the water from a hundred-year storm. Designing a house to withstand flowing water is extremely expensive; keep that in mind if your site is on a body of water. If your site is on a body of water, it is usually on the downhill side of the surrounding sites. When a rainstorm comes, a lot of water will run through your site to the body of water.
Most sites are not involved with a body of water. However, a hundred-year rainstorm (or snowstorm when it melts) can produce a lot of water. For example, say the hundred-year storm in your area was seven inches of rain in twenty-four hours. A 10,000 square foot lot, (100 feet times 100 feet), or approximately a one-quarter acre lot, would produce 43,633 gallons of water if all the rain ran off the site. One inch of rain would produce 6,233 gallons of water over the site. If the house on the site is 2,500 square feet, the amount of water that would fall on the house in the hundred-year storm would be 10,908 gallons in twenty-four hours. Again, one inch would be 1,558 gallons. Unless the roof leaks, all of this water is going to run off the house. All of the water on the nonporous areas like patios, driveways, and streets is going to run off somewhere. If your site has the type of soil, such as sand or a granular type soil, that will allow water to soak into the ground, that's good as long as it doesn't soak into the ground around the perimeter of the house.
Some soils are very porous, and others are not. The perk test tells how fast water soaks into the ground (so many gallons per hour). Perk tests are required for septic tank permits. How fast the water soaks into the ground (perks) will determine how long the drain lines have to be for the septic tank or if you can have a septic system at all. The best way to see where and what the storm water will do on your site is to visit it during a heavy rain and watch your site and the surrounding ones. If the water does not soak into the ground quickly enough, manholes and piping may be required to drain the site. One way to determine how quickly the water needs to soak into the ground is to decide how long you want to look at a puddle of water in your yard. During a frog-drowning storm, say five inches of rain an hour, I would be happy if the water was gone by the next morning. The last thing you want is for the surrounding sites or streets to drain through your site. If there is a storm water easement running through your site, be wary. Even if the easement is piped underground with manholes, pipes clog up sooner or later, and there are always maintenance problems. If the pipes clog, what will the water do on your site?
The water table is the depth from ground surface down to where water is found in the soil. If you need a well on your site, you will have to know this. How deep the water table is determines how much the well will cost. Water tables vary greatly, from ground surface at the ocean and in swampy areas to several hundred feet deep in the mountains and in deserts. A high water table will impact the foundation or basement of the house and the driveway and roads. This is because when soil gets wet, it loses some of its bearing capacity, so the foundation will have to get bigger. Water tables on sites near bodies of water are usually at the surface elevation of the water and vary with the seasons and elevation of the water. I do not recommend putting a basement in a house if the basement will be below the water table. Even if the basement is "waterproofed" and there is a sump pump in the basement floor, the basement will leak and the sump pump will wear out.
(Continues...)
Excerpted from How to Build a Houseby George Michael Rentz Copyright © 2011 by George Michael Rentz. Excerpted by permission of iUniverse, Inc.. All rights reserved. No part of this excerpt may be reproduced or reprinted without permission in writing from the publisher.
Excerpts are provided by Dial-A-Book Inc. solely for the personal use of visitors to this web site.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 7 to 10 business days | 5 to 7 business days |
|---|---|---|
| First item | US$ 39.21 | US$ 50.41 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Das Unternehmen AHA-BUCH GmbH: Seit der Gründung von AHA-BUCH im Juli 2005 ist unser Hauptziel, zufriedenen Kunden so schnell und so preisgünstig wie möglich ihren Bücherwunsch zu erfüllen. Unsere Firma beschäftigt 16 Mitarbeiter, die nur ein Ziel kennen: den Kunden und seine Wünsche! Auf über 3700 m2 Fläche haben wir über 100.000 Bücher, Modernes Antiquariat und Spiele auf Lager.
Specialty
Kinderbücher & Kinderhör Casetten, German Books, Software, Natur & Tiere, Ratgeber, Sachbücher, Englische Bücher, Medizin & Gesundheit, Universität & StudiumSeller's business information
AHA-BUCH GmbH
Garlebsen 48
Einbeck, Germany 37574
Terms of sale
General Terms and Conditions and Customer Information / Privacy Policy
I. General Terms and Conditions
§ 1 Basic provisions
(1) The following terms and conditions apply to all contracts that you conclude with us as a provider (AHA-BUCH GmbH) via the Internet platforms AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of any of your own terms and conditions used by you will be objected to
(2) A consumer within the meaning of the following regulations is any natural person who concludes a legal transaction for purposes that can predominantly be attributed neither to their commercial nor their independent professional activity. An entrepreneur is any natural or legal person or a partnership with legal capacity who, when concluding a legal transaction, acts in the exercise of his independent professional or commercial activity.
§ 2 Conclusion of the contract
(1) The object of the contract is the sale of goods.
(2) If an article is listed by us at AbeBooks or ZVAB, the activation of the offer page at AbeBooks or ZVAB constitutes the binding offer to conclude a contract under the conditions contained in the article page.
(3) The contract is concluded via the online shopping cart system as follows:
The goods intended for purchase are stored in the "shopping cart". Via the corresponding button in the navigation bar you can call up the "shopping cart" and make changes there at any time.
After calling up the "Checkout" page and entering the personal data as well as the payment and shipping conditions, all order data will be displayed again on the order overview page.
Before sending the order, you have the option of checking all information again, changing it (also via the "back" function of the Internet browser) or cancelling the purchase.
By submitting the order via the "Buy now" button, you declare the acceptance of the offer in a legally binding manner, whereby the contract is concluded.
(4) The processing of the order and transmission of all information required in connection with the conclusion of the contract is partly automated by e-mail. You must therefore ensure that the e-mail address you have stored with us is correct, that the receipt of the e-mails is technically ensured and, in particular, that spam filters do not prevent it.
§ 3 Right of retention, retention of title
(1) You can only exercise a right of retention if it concerns claims from the same contractual relationship.
(2) The goods remain our property until full payment of the purchase price.
§ 4 Warranty
(1) The statutory warranty rights exist.
(2) In the case of used goods, the warranty period is one year from delivery of the item, deviating from the statutory regulation. The shortening of the deadline does not apply:
- culpably caused damages attributable to us from injury to life, limb or health and in the case of other damages caused intentionally or through gross negligence;
- insofar as we have fraudulently concealed the defect or have assumed a guarantee for the quality of the item.
(3) As a consumer, you are requested to check the item immediately upon delivery for completeness, obvious defects and transport damage and to inform us and the freight forwarder of any complaints as soon as possible. If you do not comply with this, this will have no effect on your statutory warranty claims.
§ 5 Choice of law, place of performance, place of jurisdiction
(1) German law shall apply. In the case of consumers, this choice of law shall only apply insofar as this does not withdraw the protection afforded by mandatory provisions of the law of the state of the consumer's habitual residence (principle of favourability).
(2) The place of performance for all services arising from the existing business relationships with us as well as the place of jurisdiction is our registered office, insofar as you are not a consumer, but a merchant, a legal entity under public law or a special fund under public law. The same applies if you do not have a general place of jurisdiction in Germany or the EU or if the domicile or habitual residence is not known at the time the action is brought. The right to appeal to the court at another statutory place of jurisdiction remains unaffected by this.
(3) The provisions of the UN Convention on Contracts for the International Sale of Goods shall expressly not apply.
II. Customer Information
- Identity of the Seller
AHA-BUCH GmbH
Garlebsen 48
D-37574 Einbeck
Germany
Telephone: 055639996039
E-mail: abebooks@aha-buch.de.
Alternative dispute resolution:
The European Commission provides a platform for out-of-court online dispute resolution (ODR platform), which can be accessed under https://ec.europa.eu/odr.
- Information on the conclusion of the contract
The technical steps for the conclusion of the contract, the conclusion of the contract itself and the correction options are carried out in accordance with the provisions "Conclusion of the contract" of our General Terms and Conditions (Part I.).
- Contract language, contract text storage
3.1. The contract language is german.
3.2. The complete text of the contract will not be stored by us. Before sending the order, the contract data can be printed out or electronically saved via the print function of the browser. After receipt of the order by us, the order data, the legally prescribed information for distance contracts and the General Terms and Conditions will be sent to you again by e-mail.
- Essential characteristics of the goods or services
The essential characteristics of the goods and/or services can be found in the respective offer.
- Prices and terms of payment
5.1. The prices stated in the respective offers as well as the shipping costs represent total prices. They include all price components including all applicable taxes.
5.2. The shipping costs incurred are not included in the purchase price. They can be called up via a correspondingly designated button on our website or in the respective offer, are shown separately in the course of the ordering process and are to be borne by you in addition, unless free shipping has been promised.
5.3. If the delivery is made to countries outside the European Union, we may incur additional costs for which we are not responsible, such as.B customs duties, taxes or money transfer fees (transfer or exchange rate fees of the credit institutions), which are to be borne by you. Any costs incurred for the transfer of money shall also be borne by you in cases where the delivery is made to an EU member state, but the payment was initiated outside the European Union.
5.4. The payment methods available to you are indicated under a corresponding button on our website or in the respective offer.
5.5. Unless otherwise stated for the individual payment methods, the payment claims from the concluded contract are due for payment immediately.
- Terms of delivery
6.1. The terms of delivery, the delivery date and, if applicable, existing delivery restrictions can be found under a correspondingly designated button on our website or in the respective offer.
Insofar as no other deadline is specified in the respective offer or under the correspondingly designated button, the delivery of the goods will take place within 3-5 days after conclusion of the contract (in the case of agreed advance payment, however, only after the time of your payment instruction).
6.2. Insofar as you are a consumer, it is regulated by law that the risk of accidental loss and accidental deterioration of the sold item during dispatch shall only pass to you upon handover of the goods, regardless of whether the shipment is insured or uninsured. This does not apply if you have independently commissioned a transport company not named by the entrepreneur or a person otherwise designated to carry out the shipment.
- Statutory liability for defects
Liability for defects is governed by the "Warranty" provision in our General Terms and Conditions (Part I).
last update: 01/06/2022
Privacy policy
Unless otherwise stated below, the provision of your personal data is neither required by law or contract, nor is it necessary for the conclusion of a contract. You are not obliged to provide the data. Failure to provide this will have no consequences. This only applies if no other information is provided in the subsequent processing operations.
Collection, processing and disclosure of personal data when placing orders
When ordering, we collect and process your personal data only to the extent necessary to fulfil and process your order and to process your enquiries. The provision of the data is necessary for the conclusion of the contract. Failure to provide this provision means that no contract can be concluded. The processing takes place on the basis of Art. 6 para. 1 lit.b GDPR and is necessary for the performance of a contract with you.
Your data will be passed on, for example, to the shipping companies and dropshipping providers selected by you, payment service providers, service providers for order processing and IT service providers.
In all cases, we strictly observe the legal requirements. The scope of data transmission is limited to a minimum.
Duration of storage
After completion of the contract, the data will first be stored for the duration of the warranty period, then taking into account legal, in particular tax and commercial retention periods and then deleted after expiry of the period, unless you have consented to further processing and use.
Rights of the data subject
If the legal requirements are met, you have the following rights under Articles 15 to 20 GDPR: Right to information, to correction, to erasure, to restriction of processing, to data portability.
In addition, pursuant to Article 21 (1) GDPR, you have the right to object to processing based on Article 6 (1) f GDPR and to processing for direct marketing purposes.
Contact us on request. The contact details can be found in our imprint.
Right to lodge a complaint with the supervisory authority
In accordance with Article 77 GDPR, you have the right to complain to the supervisory authority if you believe that the processing of your personal data is not lawful.
Right to object
If the personal data processing listed here is based on our legitimate interest pursuant to Art. 6 para. 1 lit. f GDPR, you have the right to object to this processing at any time with effect for the future for reasons arising from your particular situation.
Shipping terms
We ship your order after we received them
for articles on hand latest 24 hours,
for articles with overnight supply latest 48 hours.
In case we need to order an article from our supplier our dispatch time depends on the reception date of the articles, but the articles will be shipped on the same day.
Our goal is to send the ordered articles in the fastest, but also most efficient and secure way to our customers.