The Building Estimator's Reference Book: A Reference Book Setting Forth Detailed Procedures and Cost Guidelines for Those Engaged in Estimating Buildings
Language: English
Published by Frank R Walker, 1725
- Hardcover
- Used

Seller: Greenworld Books, arlington, TX, U.S.A.Greenworld Books
AbeBooks seller since June 20, 2025
Condition: Used - Good
US$ 15.65
Quantity: 1 available
Add to basketItem description from seller
Fast Free Shipping – Good condition. It may show normal signs of use, such as light writing, highlighting, or library markings, but all pages are intact and the book is fully readable. A solid, complete copy that's ready to enjoy.
Seller Inventory # GWV.0911592253.G
- Title
- The Building Estimator's Reference Book: A Reference Book Setting Forth Detailed Procedures and Cost Guidelines for Those Engaged in Estimating Buildings
- Publisher
- Frank R Walker
- Publication year
- 1725
- Condition
- good
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 0911592253
- ISBN 13
- 9780911592252
"Synopsis" may belong to another edition of this title.
Excerpt. © Reprinted by permission. All rights reserved.
Hours
Rate
Total
Rate
Total Labor...................................3.00
$...
$...
$19.13
$57.39 Hoisting engineer
.35
...
...
25.96
9.09
Cost per c.y.
$...
$66.48
Cost per cu.m
Hours
Rate
Total
Rate
Total Labor...................................3.92
$...
$...
$19.13
$74.99 Hoisting engineer
.46
...
...
25.96
11.94
Cost per c.y.
$...
$86.93 If union rules require a mixer engineer, deduct 0.35 (.46) hours labor time and add 0.35 (.46) hours engineer time per c.y. (cu.m). If concrete is discharged from mixer directly into a hoist concrete bucket and wheeled from a floor hoppper to place of deposit, deduct .50-hr. Labor time. For concrete roof fill on flat roofs, deduct about 10% from the above costs. On pitch or gable roofs, add 25% to 50%, depending on the steepness of slope, accessibility, etc. After the cubic yard (cu.m) cost has been computed, to obtain the s.f. (sq.m) cost, divide the c.y. (cu.m) cost by the number of s.f. (sq.m) of fill obtainable from one c.y. (cu.m) and the result will be the labor cost per s.f. (sq.m) of fill. Example: find the s.f. (sq.m) labor cost of 3" (.075 m) floor fill with a cost of $43.90 per c.y. (57.39 per cu.m). The tables on previous pages give 108 s.f. of 3" (10 sq.m of .075 m) fill obtainable from one c.y. $43.90/108 = $0.406 per s.f (57.39/10 = $5.74 per sq.m). To the above costs must be added the cost of setting screeds and all finishing operations.
"About the title" may belong to another edition of this title.
Greenworld Books
arlington, TX, U.S.A.
AbeBooks seller since June 20, 2025
Shipping rates within U.S.A.
| Item | 4 to 8 business days | 4 to 8 business days |
|---|---|---|
| First item | US$ 0.00 | US$ 0.00 |
Payment methods
Specialty
Popular booksSeller's business information
Greenworldbooks
3703 Avenue E East
Arlington, TX U.S.A. 76011