Complex Systems Design & Management | Proceedings of the 14th International Conference on Complex Systems Design & Management CSD&M 2023
Language: English
Published by Springer, 2024
- Softcover
- New

Seller: preigu, Osnabrück, Germanypreigu
AbeBooks seller since August 5, 2024
Condition: New
US$ 243.02
Quantity: 5 available
Add to basketItem description from seller
Seller Inventory # 130141248
- Title
- Complex Systems Design & Management | Proceedings of the 14th International Conference on Complex Systems Design & Management CSD&M 2023
- Author
- Daniel Krob (u. a.)
- Publisher
- Springer
- Publication year
- 2024
- Condition
- Neu
- Binding
- Taschenbuch
- Language
- English
- ISBN 10
- 9819965136
- ISBN 13
- 9789819965137
- Item weight
- 651 grams
- Dimensions
- 235 x 155 x 24 mm
- Seller catalogs
- Bücher
This book contains all refereed papers accepted during the 14th International Conference on Complex Systems Design & Management CSD&M 2023 that took place in Beijing, People’s Republic of China by the end October 2023.
Mastering complex systems requires an integrated understanding of industrial practices as well as sophisticated theoretical techniques and tools. This explains the creation of an annual go-between European and Asian forum dedicated to academic researchers and industrial actors working on complex industrial systems architecting, modeling and engineering.
These proceedings cover the most recent trends in the emerging field of complex systems, both from an academic and professional perspective. A special focus was put this year on “New Trends in Complex Systems Engineering.”
The CSD&M series of conferences were initiated under the guidance of CESAM Community in Europe, managed by CESAMES. Its Asian version took place in Singapore for three consecutive sessions during 2014 and 2018. The fourth Asian edition was held in Beijing in hybrid with the Chinese Society of Aeronautics and Astronautics (CSAA) as the co-organizer in 2021. Since 2023, its European and Asian conferences merge into one, taking place in China and Europe in turn.
CESAM Community aims in organizing the sharing of good practices in systems architecting and model-based systems engineering (MBSE) and certifying the level of knowledge and proficiency in this field through the CESAM certification.
The CESAM systems architecting, and model-based systems engineering (MBSE) certification is especially currently the most disseminated professional certification in the world in this domain through more than 3,000 real complex system development projects on which it was operationally deployed and around 10,000 engineers who were trained on the CESAM framework at international level.
"Synopsis" may belong to another edition of this title.
About the Author
Prof. Daniel Krob:
Prof. Daniel Krob is a senior researcher at the French National Center for Scientific Research (CNRS). Daniel Krob worked in algebraic and enumerative combinatorics, algorithms for mobile telecommunications and finite automata and formal languages, before specializing nowadays in systems architecture, systems engineering and systems modeling. He is the author of more than 90 scientific papers and 4 books and holds 2 patents. Daniel Krob founded and directed the “Laboratoire d’Informatique Algorithmique: Fondements et Applications” ( LIAFA) of University Paris 7 for 6 years. He was also the head, for several years, of the steering committees of two major international conferences in combinatorics and theoretical computer science (FPSAC & STACS). At international level, he is also one of the 15 founding members of the Omega-Alpha honor association in Systems Engineering. Daniel Krob is a INCOSE fellow since February 2014.
Dr. Lefei Li:
Dr. Lefei Li is the vice department chair and the director of the Tsinghua Operations and Service Research Lab (TOPS). He received his B.S. degree in Electronic Engineering from Zhejiang University in 2002, M.S. (2004) degree in Industrial Engineering and Ph.D. (2006) degree in Systems and Industrial Engineering from the University of Arizona. Lefei Li joined Tsinghua University in 2006, conducting research in systems engineering, service operations and management, logistics and complex systems modeling and simulation. Dr. Li has managed or actively participated in several urban transportation and logistics/service network design projects, sponsored by top logistics companies or public agencies in China. He has been serving as a PI or co-PI in several research projects funded by the National Science Foundation of China and Ministry of Science and Technology of China.
Prof. Xinguo Zhang:
Prof. Xinguo Zhang is currently the director of Complex Systems Engineering Research Center, Tsinghua University, China INCOSE ESEP, President of INCOSE Beijing Chapter.
Dr. Zhang is recognized as one of the world’s leading systems engineering experts. He spreads the knowledge and promotes the practice of INCOSE Systems Engineering in China. He focuses on developing and applying methodologies of enterprise architecture, system of systems engineering and model-based systems engineering to solve complex system engineering problems with very high level of creativity. As a former EVP & CIO at AVIC, Dr. Zhang architected the digital engineering strategy and carried out the digital transformation in the aviation domain, which have been expanded to other industrial domains in China.
Dr. Junchen Yao:
Dr. Junchen Yao is currently the vice president and secretary general of the Chinese Society of Aeronautics and Astronautics(CSAA). He majored in medal materials and thermal treatment and gained his master’s degree from Beihang University (BUAA) in 1988. During 2002–2006, he pursued his doctor degree at BUAA. Dr. Yao was the deputy division director at the Science and Technology Bureau of Aviation Industries of China. He later on took the duties of the deputy director at the Science and Technology Department of the Aviation Industry Corporation of China 1(AVIC 1), director at the Department of Scientific Research of AVIC Foundation Technology Research Institute and director of the AVIC Changcheng Institute of Metrology & Measurement. Dr. Yao has been tracking the frontier of aeronautical materials during his position with AVIC headquarters. He has chaired and participated in quite a few key projects.
Dr. Mengyu Guo:
Dr. Mengyu Guo received his B.S. degree in Mechanical Engineering from Southeast University in 2009 and Ph.D. degree in Industrial Engineering from Tsinghua University in 2014. Before joining Tsinghua University, Dr. Guo worked for the AVIC research and development center for 3 years as a project engineer and thereafter joined University of California at Berkeley as a postdoctoral researcher and assistant researcher. Dr. Guo joined Tsinghua University in 2020, conducting research in systems engineering, complex system architecting, modeling, simulation and optimization with dozens of journal papers and peer-reviewed conference papers output. His domain expertise includes production, intelligent transportation and healthcare. Dr. Guo is the representative of INCOSE Beijing Chapter and committee member of CSD&M 2021 international conference.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 60 to 60 business days | 60 to 60 business days |
|---|---|---|
| First item | US$ 81.40 | US$ 81.40 |
Payment methods
- Paypal
Store description
Specialty
Bücher, SpielwarenSeller's business information
preigu GmbH & Co. KG
Lengericher Landstraße 19
Osnabrück, Germany 49078
Terms of sale
Standard Business Terms and customer information
I. Standard business terms
§ 1 Basic provisions
(1) The following terms and conditions of business apply for all contracts concluded with us as the supplier (preigu GmbH & Co. KG) via the websites AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of your own terms and conditions is explicitly rejected.
(2) A ‘consumer' in the sense of the following regulations is every natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities. The term ‘businessman' refers to every natural person, legal person or legally responsible partnership that concludes a legal transaction in pursuance of his/its independent professional or commercial activity.
§ 2 Conclusion of the contract
(1) The subject-matter of the contract is the selling of products .
(2) If an article is placed by us with AbeBooks or ZVAB, the activation of the page on AbeBooks or ZVAB shall involve the binding offer to conclude a contract under the terms and conditions contained in the article page.
(3) The contract shall become effective via the online shopping cart system as follows:
The products intended for purchase are moved to the "shopping cart". You can select the "Shopping Cart" using the appropriate buttons on the navigation bar and make changes there at any time.
After calling up the "Checkout" page and entering the required personal data and payment and shipping conditions, all order information is then displayed again on the order summary page.
Before submitting the order, you have the ability once more to review or change any information here (you may also use the "back" button on the Internet browser), or to cancel the purchase.
By clicking the "Buy now" button to submit the order, you declare your legally binding acceptance of the order which makes the contract effective.
(4) The execution of the order and the sending of all the details necessitated by the conclusion of the contract take place via e-mail, in a partially-automated manner. Consequently, you have to ensure that the e-mail address that you have deposited with us is the correct one, and that the receipt of the respective e-mails is guaranteed. In particular, you have to ensure that the respective e-mails are not blocked by a SPAM filter.
§ 3 Right of retention, reservation of proprietary rights
(1) You can only exercise a right of retention if the situation in question involves claims arising from the same contractual relationship.
(2) The goods remain our property until the purchase price is paid in full.
§ 4 Warranty
(1) The statutory warranty rights are applicable.
(2) As a consumer, you are requested to promptly check the product for completeness, visible defects and transport damage as soon as it is delivered, and promptly disclose your complaints to us and the shipping company in writing. Even if you do not comply with this request, it shall have no effect on your legal warranty claims.
(3) If a characteristic of the goods deviates from the objective requirements, the deviation shall only be deemed to be agreed if you were informed of the same by us before submitting the contractual declaration and the deviation was expressly and separately agreed between the contracting parties.
§ 5 Choice of law, place of fulfilment, jurisdiction
(1) German law shall apply. This choice of law only applies to customers if it does not result in the revocation of the protection guaranteed by the mandatory provisions of the law of the country in which the respective customer's usual place of residence is located (benefit-of-the-doubt principle).
(2) If you are not a consumer, but a businessman, a legal entity under public law or an institutional fund governed by public law, our place of business is the place of jurisdiction as well as the place of fulfilment for all services that follow from the business relationships that exist with us. The same condition applies to situations in which you are not associated with a general place of jurisdiction in Germany or the EU, as well as situations in which the place of residence or the usual place of residence is not known at the time of commencement of proceedings. This has no bearing on the capacity to call upon the court associated with another place of jurisdiction.
(3) The provisions of the UN Convention on Contracts for the International Sale of Goods are explicitly inapplicable.
II. Customer information
- Identity of the seller
preigu GmbH & Co. KG
Lengericher Landstr. 19
49078 Osnabrück
Germany
Telephone: 0541-580 72 84
E-Mail: mail@preigu.de
We are neither willing nor obliged to participate in dispute resolution proceedings before consumer arbitration boards.
- Information regarding the conclusion of the contract
The technical steps associated with the conclusion of the contract, the contract conclusion itself and the correction options are executed in accordance to the regulations "conclusion of the contract" in our standard business terms (part I.).
- Contractual language, saving the text of the contract
3.1 Contract language shall be English.
3.2 The complete text of the contract is not saved with us. Before the order is sent, the contract data can be printed out or electronically saved using the browser's print function. After the order is received by us, the order data, the legally-mandated details related to distance selling contracts and the standard business terms are re-sent to you via e-mail.
- Main features of the product or service
The key features of the goods and/or services can be found in the respective quote.
- Prices and payment arrangements
5.1 The prices mentioned in the respective offers represent total prices, as do the shipping costs. They include all the price components, including all the incidental taxes.
5.2 The dispatch costs that are incurred are not included in the purchase price. They can be viewed by clicking the appropriate button on our website or in the respective quote, are shown separately over the course of the order transaction and must additionally be borne by you, insofar as free delivery is not confirmed.
5.3 If delivery is made to countries outside of the European Union, we may incur unreasonable additional costs, such as duties, taxes or money transfer fees (transfer or foreign exchange fees charged by the banks), which you must bear.
5.4 You must also bear the costs arising from money transfers in cases in which the delivery is made to an EU Member State, but the payment is initiated outside of the European Union.
5.5 The payment methods that are available to you are shown by clicking the appropriate button on our website or are disclosed in the respective quote.
5.6 Unless otherwise specified for the respective payment methods, the payment claims arising from the contract that has been concluded become payable immediately.
- Delivery conditions
6.1 The delivery conditions, delivery date and existing supply restrictions, if applicable, can be found by clicking the appropriate button on our website or in the respective quote.
Unless a different period is specified in the item description or our delivery conditions, the goods are delivered within 3-5 days after the conclusion of the contract (in case an advance payment has been agreed upon, after the payment authorisation).
6.2 If you are a consumer, the following is statutorily regulated: The risk of the sold item accidentally being destroyed or degraded during shipping only passes over to you when the item in question is delivered, regardless of whether or not the shipping operation is insured. This condition does not apply if you have independently commissioned a transport company that has not been specified by us or a person who has otherwise been appointed to execute the shipping operation.
- Statutory warranty right
Liability for defects is governed by the "Warranty" provisions in our General Terms and Conditions of Business (Part I).
Information on battery disposal
In connection with the sale of batteries or the delivery of devices containing batteries, we are obliged to inform you of the following:
Batteries must not be disposed of with household waste.
You can either return used batteries that we carry or have carried in our range as new batteries to us at your own expense or return them free of charge to our shipping warehouse (shipping address). Alternatively, you can hand in the batteries at your local collection points.
As an end user, you are legally obliged to return used batteries so that they can be recycled or disposed of properly.
Used batteries may contain harmful substances that can damage the environment or your health if not stored or disposed of properly. However, batteries also contain important raw materials such as iron, zinc, manganese or nickel and can be recycled.
The symbols on the batteries have the following meanings:
The symbol of the crossed-out wheelie bin means that the battery must not be disposed of with household waste.
For batteries containing a certain amount of lead, cadmium or mercury, the following additions below the symbol with the crossed-out wheelie bin indicate the respective pollutants:
Pb = Battery contains more than 0.004% lead by weight
Cd = Battery contains more than 0.002% cadmium by weight
Hg = Battery contains more than 0.0005% mercury by weight
Information on the costs involved in accordance with Article 56 (4) of the EU Battery Regulation (Regulation 2023/1542) can be found at the ‘Batterie-Zurück (https://www.batterie-zurueck.de/de/bewirtschaftungvonaltbatterien/)' initiative.
Please pay attention to the above instructions.