Computer Integrated Construction Project Scheduling
Language: English
Published by Pearson, 2004
- Softcover
- Used

Seller: Greenworld Books, arlington, TX, U.S.A.Greenworld Books
AbeBooks seller since June 20, 2025
Condition: Used - Very good
US$ 293.46
Quantity: 1 available
Add to basketItem description from seller
Fast Free Shipping – Very Good condition book with a firm cover and clean pages. Shows normal use and some light wear or limited notes markings. A solid, nice copy to enjoy.
Seller Inventory # GWV.0131114654.VG
- Title
- Computer Integrated Construction Project Scheduling
- Author
- Buttelwerth, John
- Publisher
- Pearson
- Publication year
- 2004
- Condition
- very_good
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 0131114654
- ISBN 13
- 9780131114654
Written in a style that is meant to be open and inviting to the reader with shorter paragraphs and interesting illustrations, this book provides a single source comprehensive examination of construction project scheduling. Content begins with introducing concepts of the construction industry to provide the necessary framework and background, then fully discusses planning and scheduling topics in detail. It offers extensively reviewed coverage on the most current version of SureTrak Software, thorough coverage of manual network diagramming and CPM calculations, and has built into it a capstone project. The book includes an abundance of real world examples of numerous scheduling exercises—including 17 pages of full-size drawings and schedules that are part of the exercises. Additionally, the information is presented modularly in such a way that it can be customized to fit any learning situation. Covers planning and scheduling including the determination of project activities, logic, and durations; drawing precedence network diagrams and manually calculating CPM schedules; creating and updating computer-generated schedules and schedule reports. Well suited to be used as a guide or reference by construction practitioners such as Project managers, Superintendents, and Construction managers.
"Synopsis" may belong to another edition of this title.
Greenworld Books
arlington, TX, U.S.A.
AbeBooks seller since June 20, 2025
Shipping rates within U.S.A.
| Item | 4 to 8 business days | 4 to 8 business days |
|---|---|---|
| First item | US$ 0.00 | US$ 0.00 |
Payment methods
Specialty
Popular booksSeller's business information
Greenworldbooks
3703 Avenue E East
Arlington, TX U.S.A. 76011