From
ThriftBooks-Atlanta, AUSTELL, GA, U.S.A.
Seller rating 5 out of 5 stars
AbeBooks Seller since March 24, 2009
May have limited writing in cover pages. Pages are unmarked. ~ ThriftBooks: Read More, Spend Less. Seller Inventory # G0470505338I4N00
An easy-to-follow guide to the theory and practice of project scheduling and control
No matter how large or small the construction project, an efficient, well-thought-out schedule is crucial to achieving success. The schedule manages all aspects of a job, such as adjusting staff requirements at various stages, overseeing materials deliveries and equipment needs, organizing inspections, and estimating time needs for curing and settling—all of which requires a deep understanding on the part of the scheduler.
Written by a career construction professional, Construction Project Scheduling and Control, Second Edition has been fully revised with up-to-date coverage detailing all the steps needed to devise a technologically advanced schedule geared toward streamlining the construction process. Solved and unsolved exercises reinforce learning, while an overview of industry standard computer software sets the tone for further study. Some of the features in this Second Edition include:
Focus on precedence networks as a viable solution to scheduling, the main part of project control
The concepts of Dynamic Minimal Lag, a new CPM technique developed by the author
A new chapter on schedule risk management
By combining basic fundamentals with advanced techniques alongside the robust analysis of theory to enhance real-world applications, Construction Project Scheduling and Control is an ideal companion for students and professionals looking to formulate a schedule for a time-crunched industry in need of better ways to oversee projects.
About the Author: Saleh A. Mubarak holds a Ph.D. in civil engineering / construction management from Clemson University and a M.Sc. in civil engineering / structures from Ohio University. He has over 22 years of diversified experience. He worked as a professor, consultant, project controls manager, project scheduler, cost estimator, structural engineer, and civil engineer. His experience includes academics as well as the construction industry. He is the author of two books and an international authority in project planning, scheduling, cost estimating, and project control. He is an active member of several professional organizations such as PMI and AACE International. He continues to conduct professional seminars on several topics around the world. Currently, he is the head of the Civil & Architectural Engineering Department at Qatar University.
Title: Construction Project Scheduling and Control
Publisher: Wiley
Publication Date: 2010
Binding: Hardcover
Condition: Very Good
Dust Jacket Condition: No Jacket
Edition: 2nd Edition
Seller: Anybook.com, Lincoln, United Kingdom
Condition: Fair. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. Book contains pencil markings. In fair condition, suitable as a study copy. No dust jacket. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,1050grams, ISBN:9780470505335. Seller Inventory # 8767571
Quantity: 1 available
Seller: World of Books (was SecondSale), Montgomery, IL, U.S.A.
Condition: Good. Item in good condition. Textbooks may not include supplemental items i.e. CDs, access codes etc. Seller Inventory # 00101845897
Seller: GoldBooks, Denver, CO, U.S.A.
Hardcover. Condition: new. New Copy. Customer Service Guaranteed. Seller Inventory # 57D81_23_0470505338