Deep Foundations for Infrastructure Development in India, Volume 2
New - Hardcover
Condition: New
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 1917685107
This book contains select proceedings of the 12th annual conference of Deep Foundations Institute of India, DFI-India 2023, held during 05–07 October 2023. The book showcases the advancement in deep foundation technologies through articles on research works and case histories under sub-themes:
1) Deep foundation and deep excavation techniques. 2) Sustainability practices in deep foundation industry. 3) Innovative techniques and testing for foundations and geotechnical investigations, monitoring, and performance. 4) Construction and QA/QC of deep foundations including case studies. 5) Ground improvement techniques. 6) Geotechnics for marine, near-shore, and coastal construction. 7) Innovations in experimental and numerical methods in deep foundations and ground improvement. 8) Futuristic technologies in deep foundations―large diameter piles, helical piles, monopiles, tiebacks, driving devices, etc.; legal and contractual aspects of deep foundation construction projects.
The articles covered in this book are of immense value to professionals and academicians for improving their work practice.
Dr. Jaykumar Shukla is presently responsible for coordinating the technical development strategy, geotechnical consulting assignments for the leading consulting and testing organization geo dynamics since 2019. With more than 20 years of experience, he is Principal Engineer presently and responsible for the geotechnical consulting and instrumentation areas. He has worked with Royal Haskoning India and Essar Steel Ltd previously. He is Recipient of university gold medal for undergraduate studies and obtained his Ph.D. from IIT Bombay. He is Executive Committee Member of Indian Geotechnical Society for the term 2019-2020. He is actively involved in research and development activities and has more than 30 research publication written in the national and international forums. He is also Member of Board of Studies of Civil engineering and Member of Faculty Board of Engineering and Technology of Charotar University of Science and Technology, Gujarat.
Dr. Dhananjay L Shah retired as Senior Professor from MS University of Baroda in the year 2017 after 40 years of academic service starting as Assistant Professor at BVM Engineering College, Vallabh Vidyanagar in 1987. He was Assistant Research Officer at Gujarat Engineering Research Institute, Vadodara, for about ten years before starting his academic career. Dr. Shah received several best paper awards for his more than 150 research papers published in the journals and conference proceedings. He also received IGS-Prof. Dinesh Mohan award for innovative geotechnical practices, during IGC, 2022, held at Kochi. Prof. DL Shah guided more than sixty M.Tech. students and two Ph.D. students. There are four published books in his credit apart from editing six conference proceedings. One of his books ‘Grouting Technology in Tunnelling and Dam Construction,’ was Published by Oxford and IBH Publishing Co., New Delhi, 1992 (ISBN 81 – 204 – 0735 – 9).
Prof. Deepankar Choudhury is Prof. T. Kant Chair Professor (HAG) and Head of Civil Engineering Department at IIT Bombay, Mumbai, India. Prof. Choudhury’s major research areas are civil geotechnical earthquake engineering, computational geomechanics, sustainable foundation engineering, CPRF, soil dynamics, disaster resilient geostructures. His pioneering research on pseudo-dynamic method of analysis and design of earthquake-resistant geotechnical structures and dynamic formulation of Combined Pile-Raft Foundation (CPRF) is considered as fundamental engineering and scientific contributions. He was Secretary of technical committee TC 207 of International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE), Secretary of TC 212 of ISSMGE, Editorial Board of ISSMGE Bulletin, Member of TC 203. He is Core Committee Member of several IS codes under CED-43 of Bureau of Indian Standards (BIS), IRCC code, and was one of the Main Creators of first ever international design manual on CPRF published by ISSMGE, recognized and appreciated across the globe.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
Order quantity | 26 to 60 business days | 26 to 60 business days |
---|---|---|
First item | US$ 57.55 | US$ 57.55 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.