Design and Engineering, Volume 3
Language: English
Published by Emerald Publishing Limited, GB, 2023
- Hardcover
- New

Seller: Rarewaves.com USA, London, London, United KingdomRarewaves.com USA
AbeBooks seller since June 11, 2025
Condition: New
US$ 121.24
Quantity: Over 20 available
Add to basketItem description from seller
The main construction of HS2, Britain's new zero carbon, high-speed railway, began in September 2020, when delivery activity on Phase One moved from enabling works, scheme design and preparatory work to full construction of the railway. The new railway will link London and the West Midlands and eventually extend services to the North and Scotland. High-speed trains powered by zero carbon electricity will reach speeds of 225mph and transform journey times, while opening up capacity on the existing, conventional railway network.This volume of High Speed Two: Infrastructure Design and Construction from the HS2 Project, contains a collection of papers submitted to HS2 Ltd's Technical Papers Competition. Contributions have come from consultants, contractors, suppliers and third-party stakeholders involved in the delivery of HS2. As part of HS2's Learning Legacy programme, the organisation seeks to share its learnings and best practices with the rest of the industry throughout the project lifecycle. This volume includes high-quality papers on best practice in planning, design, construction and management for large-scale railway infrastructure projects. It is divided into two sections: ground engineering (geotechnics, groundworks and earthworks) and structural engineering (bridges, viaducts, tunnels and underground structures).…
Seller Inventory # LU-9780727766892
- Title
- Design and Engineering, Volume 3
- Author
- High Speed Two
- Publisher
- Emerald Publishing Limited, GB
- Publication year
- 2023
- Condition
- New
- Binding
- Hardback
- Language
- English
- ISBN 10
- 0727766899
- ISBN 13
- 9780727766892
- Item weight
- 784 grams
The main construction of HS2, Britain’s new zero carbon, high-speed railway, began in September 2020, when delivery activity on Phase One moved from enabling works, scheme design and preparatory work to full construction of the railway. The new railway will link London and the West Midlands and eventually extend services to the North and Scotland. High-speed trains powered by zero carbon electricity will reach speeds of 225mph and transform journey times, while opening up capacity on the existing, conventional railway network.
This volume of High Speed Two: Infrastructure Design and Construction from the HS2 Project, contains a collection of papers submitted to HS2 Ltd’s Technical Papers Competition. Contributions have come from consultants, contractors, suppliers and third-party stakeholders involved in the delivery of HS2. As part of HS2’s Learning Legacy programme, the organisation seeks to share its learnings and best practices with the rest of the industry throughout the project lifecycle. This volume includes high-quality papers on best practice in planning, design, construction and management for large-scale railway infrastructure projects. It is divided into two sections: ground engineering (geotechnics, groundworks and earthworks) and structural engineering (bridges, viaducts, tunnels and underground structures).
"Synopsis" may belong to another edition of this title.
Rarewaves.com USA
London, London, United Kingdom
AbeBooks seller since June 11, 2025
Shipping rates from United Kingdom to U.S.A.
| Item | 12 to 17 business days | 12 to 17 business days |
|---|---|---|
| First item | US$ 0.00 | US$ 0.00 |
Payment methods
Seller's business information
RAREWAVES.COM LIMITED
Elsley Court, 20-22 Great Titchfield Street
London, United Kingdom W1W 8BE
Shipping terms
Please note that we do not offer Priority shipping to any country.
We currently do not ship to the below countries:
Russia
Belarus
Ukraine
Please do not attempt to place orders with any of these countries as a ship to address - they will be cancelled.