Determinants Of Construction Project Success In India (topics In Safety, Risk, Reliability And Quality)
Language: English
Published by Springer, 2013
Series: Book 14 of 27 - Topics in Safety, Reliability and Quality
- Hardcover
- New

Seller: Romtrade Corp., STERLING HEIGHTS, MI, U.S.A.Romtrade Corp.
AbeBooks seller since April 17, 2013
Condition: New
US$ 86.06
Quantity: 1 available
Add to basketItem description from seller
This is a Brand-new US Edition. This Item may be shipped from US or any other country as we have multiple locations worldwide.
Seller Inventory # ABBB-154938
- Title
- Determinants Of Construction Project Success In India (topics In Safety, Risk, Reliability And Quality)
- Author
- Jha, Kumar Neeraj
- Publisher
- Springer
- Publication year
- 2013
- Condition
- New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 9400762550
- ISBN 13
- 9789400762558
- Series
- Book 14 of 27: Topics in Safety, Reliability and Quality
This study presents exploratory work and seeks to identify and evaluate the success and failure factors that could form a guideline for further study and to some extent help professionals to understand some critical aspects that impact project performance concerning construction in India. A total of 55 attributes affecting the performance of construction projects are analysed in terms of their level of influence on four key performance criteria – schedule, cost, quality, and no disputes – using a two-stage questionnaire survey. These attributes are then further analysed, interpreted and evaluated.
Based on the critical success factors obtained from the study, a neural network model-based predictive model for project performance has been developed. The performance prediction models have been derived for all four project performance criteria. Further, a hypothesis that ‘project success’ is influenced by ‘success traits’ has also been formulated. The hypothesized positive inter-relationships between success traits and project success have been tested using the structural equation modelling technique.
Besides supporting the intuition of past researchers in recognizing ‘coordination’ as a key success factor, this study has revealed that coordination is not an isolated and independent activity, but is a typical management function with an inherent role in all major management activities. Key elements affecting coordination have also been identified and their influence on coordination effort has been studied. Furthermore, the present study has also identified three broad skill groups required of effective project coordinators.
The results are validated through case studies of live projects and structured interviews with experts in the field of construction management.
"Synopsis" may belong to another edition of this title.
From the Back Cover
This study presents exploratory work and seeks to identify and evaluate the success and failure factors that could form a guideline for further study and to some extent help professionals to understand some critical aspects that impact project performance concerning construction in India. A total of 55 attributes affecting the performance of construction projects are analysed in terms of their level of influence on four key performance criteria – schedule, cost, quality, and no disputes – using a two-stage questionnaire survey. These attributes are then further analysed, interpreted and evaluated.
Based on the critical success factors obtained from the study, a neural network model-based predictive model for project performance has been developed. The performance prediction models have been derived for all four project performance criteria. Further, a hypothesis that ‘project success’ is influenced by ‘success traits’ has also been formulated. The hypothesized positive inter-relationships between success traits and project success have been tested using the structural equation modelling technique.
Besides supporting the intuition of past researchers in recognizing ‘coordination’ as a key success factor, this study has revealed that coordination is not an isolated and independent activity, but is a typical management function with an inherent role in all major management activities. Key elements affecting coordination have also been identified and their influence on coordination effort has been studied. Furthermore, the present study has also identified three broad skill groups required of effective project coordinators.
The results are validated through case studies of live projects and structured interviews with experts in the field of construction management.
"About the title" may belong to another edition of this title.
Romtrade Corp.
STERLING HEIGHTS, MI, U.S.A.
AbeBooks seller since April 17, 2013
Shipping rates within U.S.A.
| Item | 3 to 6 business days | 5 to 10 business days |
|---|---|---|
| First item | US$ 0.00 | US$ 0.00 |
Payment methods
Store description
We sell textbooks to students at very affordable prices. All books are brand new, satisfaction guaranteed.
Specialty
TextbooksSeller's business information
Romtrade Corp.
39137 BYERS DR.
STERLING HEIGHTS, MI U.S.A. 48310
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web
sites. If you're dissatisfied with your purchase (Incorrect Book/Not as
Described/Damaged) or if the order hasn't arrived, you're eligible for a refund
within 30 days of the estimated delivery date. If you've changed your mind about
a book that you've ordered, please use the Ask bookseller a question link to
contact us and we'll respond within 2 business days. The contact persons name is
Constantin Marandici and the mail id where you can send a mail is
discount_scientific_books@yahoo.com. We can be also contacted at 586-977-9198.
Our address
39137 Byers Dr.
Sterling Heights, MI - 48310
USA
Shipping terms
Orders usually ship within 2 business days. Shipping costs are based on books weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact you to let you know extra shipping is required. We use USPS, DHL and ARAMEX for shipping.