The Double Constraint Inversion Methodology
Wouter Zijl|Florimond De Smedt|Mustafa El-Rawy|Okke Batelaan
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Wouter Zijl received his Ph.D. in 1978 from Eindhoven University of Technology (TU/e) in Technical Physics, with emphasis on free surface flow applied to two-phase flow. In 1973 he received his M.Sc. degree in Technical Physics, also from TU/e, on ioniza.
Seller Inventory # 179443121
Includes hydrogeological case studies demonstrating the practical relevance of the approach
Explains how to apply the inversion methodology using comprehensible mathematics
Clarifies the differences between inversion methods
Wouter Zijl received his Ph.D. in 1978 from Eindhoven University of Technology (TU/e) in Technical Physics, with emphasis on free surface flow applied to two-phase flow. In 1973 he received his M.Sc. degree in Technical Physics, also from TU/e, on ionization phenomena in shock waves. In 1966 he received his B.Sc. degree in Electrical Engineering from the Higher Institute of Technology Amsterdam (HTS-A). He has been working as head of the Thermal Hydraulics department at Neratoom B.V. in The Hague, and as senior Geophysicist, Petroleum Reservoir Engineer and Hydrogeologist at the Netherlands Organization for Applied Scientific Research. Presently he is visiting professor at Vrije Universiteit Brussel (VUB). His expertise includes fluid dynamics in clear and porous media, geophysical modeling (imaging, calibration, data assimilation, scale analysis), geomechanics and applied mathematical physics in general. He is a member of the International Association of Hydrogeologists (IAH) and of the European Association of Geoscientists and Engineers (EAGE).
Mustafa El-Rawy received his Ph.D. from Vrije Universiteit Brussel (VUB) in Water Resources Engineering in 2013. He received his M.Sc. from Katholieke Universiteit Leuven (KUL) and Vrije Universiteit Brussel (VUB) in Water Resources Engineering (IUPWARE programme) in 2008. He received his B.Sc. degree Civil Engineering from Faculty of Engineering, Minia University, Minia, Egypt in 2002. He worked as a research scientist at Sultan Qaboos University, Muscat, Oman on the project of “Managed Aquifer Recharge using Treated Wastewater in Different Geological Setting of MENA Countries” (2014 - 2015). He has been awarded with a master scholarship from the VLIR-UOS, Belgium (2006- 2008), a PhD scholarship from the Erasmus Mundus External Cooperation Window (EMECW) Programme, and Vrije Universiteit Brussel (VUB), Belgium (2009 - 2013), a postdoctoral Fellowship from Sultan Qaboos University, Muscat, Oman (2014 - 2015), and apostdoctoral Fellowship from the Egyptian Ministry of High Education at the Vrije Universiteit Brussel, Brussels, Belgium (October, 2015 - March, 2016). He is currently working as an Assistant Professor in the Department of Civil Engineering, Faculty of Engineering, Minia University, Minia, Egypt and his expertise includes Inverse Groundwater Modeling, Managed aquifer Recharge (MAR), Groundwater Modeling, Water Resources Management, and Groundwater-Surface Water Interaction.
Florimond De Smedt received his Ph.D. from Vrije Universiteit Brussel (VUB) in Civil Engineering (Hydrology) in 1979, M.Sc. degree in Agronomy (Soil Physics) from New Mexico State University in 1979, and M.Sc. in Civil Engineering from VUB in 1973. He is Em. Professor and former Head of the Department of Hydrology and Hydraulic Engineering, VUB. His main fields of research are hydrogeology, groundwater modelling, hydrology, and physical land resources. He supervised 29 Ph.D. theses and about 100 M.Sc. theses and is author or co-author of 120 journal papers with impact factor, 10 books or chapters in books and 200 other scientific contributions.
Professor Okke Batelaan is a graduate of the Free University of Amsterdam, Netherlands (MSc - Hydrogeology) and of the Free University Brussels, Belgium (PhD - Engineering). He worked for 23 years at the Free University Brussels and led for 6 years the hydrogeology group at the KU Leuven, Belgium. Since 2012 Okke is Strategic Professor in Hydro(geo)logy, Dean of the School of the Environment (2015-2017), Flinders University. Okke has broad experience in teaching groundwater hydrology and modelling, GIS-remote sensing for hydrological applications. He supervised more than 140 MSc and 25 PhD students. His extensive research experience and a publication record covers shallow groundwater hydrology and modeling, recharge-discharge estimation and modeling, urban hydrology and distributed modelling, ecohydrology and impacts of landuse and climate change on groundwater systems. He coordinated-participated in a large number of projects in Europe, Africa, South America, Asia and Australia. He is editor-in-chief of Journal of Hydrology: Regional Studies.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | US$ 56.85 | US$ 56.85 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.