Energy Generation using Reverse Electrodialysis
Book 43 of 104: SpringerBriefs in Continuum MechanicsDaejoong Kim|Kilsung Kwon|Deok Han Kim|Longnan Li
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: 1 available
Add to basketCondition: New
Quantity: 1 available
Add to basketHelps exisiting researchers or newcomers to the field to obtain an overview of the current state of reverse electrodialysis researchProvides a complete definition and working theory of reverse electrodialysisCovers practical implementation .
Seller Inventory # 220295279
This book provides an introduction to the working principles of reverse electrodialysis and its practical application in the generation of electricity.
Salinity gradient energy (SGE) has received significant attention recently due to the energy crisis resulting from the depletion of fossil fuels and the growth in energy demand. There are currently three methods to convert SGE into electricity: pressure retarded osmosis (PRO), reverse electrodialysis (RED), and capacitive mixing (CAPMIX). This book covers the theory and implementation of reverse electrodialysis, which uses ion exchange membranes to selectively deliver cations or anions, and its advantages over other methods, such as high reliability without any moving parts, the direct energy conversion process from chemical energy to electrical energy, and its low fouling rate. All of these have made RED an attractive option, however, there are various challenges in the route to commercialization and these are also described.
The book summarizes the research progress and current status of RED, with a final chapter considering the outlook for the future of the technology at a commercial level.
Daejoong Kim received the PhD degree in mechanical engineering at Stanford University, Stanford, California, in 2007. Before that, he earned the BS and MS degrees in mechanical engineering at Seoul National University, Seoul, Korea, in 1999 and 2001, respectively. He was a postdoctoral research associate at the University of Illinois, Urbana-Champaign (UIUC). He is currently an associate professor at Sogang University in Department of Mechanical Engineering since 2008. He specializes in fluid mechanics and transport phenomena at micro- and nanoscale. His research includes micropumps, micromixers, micro power sources, reverse electrodialysis, seawater desalination, and molecular dynamics simulation. He served as a reviewer for many archived journals including Sensors and Actuators A: Physical and Microfluidics and Nanofluidics. He also served as a secretary general, a session organizer, or a session chair in many conferences sponsored by American Society of Mechanical Engineers (ASME) and Korean Society of Mechanical Engineers (KSME).
Kilsung Kwon received the MS and PhD degree in mechanical engineering at Sogang University in 2011 and 2015, respectively. Before that, he earned the BS degree at Seoul National University of Technology in 2009. He is currently a postdoctoral researcher at Korea Atomic Energy Research Institute since 2016. He specializes in mass/heat transport phenomena. His research includes micropump, fuel cell, reverse electrodialysis, and heat exchanger. He served as a peer-reviewer for Applied Thermal Engineering, Applied Energy and Energy and Conversion Management.
Deok Han Kim received M.S degree in Mechanical Engineering at Sogang University in South Korea in 2018. During his master study, he partly worked as a research intern in Soft matter, Fluidics and Interfaces group at University of Twente in Netherlands. He is currently working as a system engineering researcher at Hanwha defense systems. His research field was heat and mass transport phenomena in micro/nano scales, especially through membranes.
Longnan Li received PhD degree in Mechanical Engineering from Sogang University in 2017, He holds a Bachelor's degree in Water Supply and Sewerage Engineering from Northeast Petroleum University, China. He is currently a postdoctoral research associate at University of Illinois, Urbana-Champaign. He specializes in heat and mass transport phenomena in micro/nano scales. His research includes micro heat pipes, enhanced condensation/frosting on engineered surfaces, micro/nanofluidics and membrane process in seawater desalination.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 13 to 40 business days | 13 to 40 business days |
|---|---|---|
| First item | US$ 56.92 | US$ 56.92 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.