Frank R. Walker's Building Estimator's Reference Book
Language: English
Published by Frank R Walker, 1994
- Softcover
- Used

Seller: Cheryl's Books, Vinemont, AL, U.S.A.Cheryl's Books
AbeBooks seller since April 17, 2025
Condition: Used - Fair
US$ 9.95
Quantity: 1 available
Add to basketItem description from seller
hardcover reference book in acceptable condition. Some shelf and use wear, including some pages with bumped corners. light rubbing and scuffing on cover boards, some discoloration on edges of page block, and the front end paper and several pages have been puled loose from the front cover hinge. Overall, still a good usable, readable copy.
Seller Inventory # Hawkeye0131180165397
- Title
- Frank R. Walker's Building Estimator's Reference Book
- Author
- Siddens, Scott [Editor]
- Publisher
- Frank R Walker
- Publication year
- 1994
- Condition
- Fair
- Binding
- Paperback
- Language
- English
- ISBN 10
- 0911592253
- ISBN 13
- 9780911592252
- Item weight
- 43 ounces
- Dimensions
- 8x5x2
"Synopsis" may belong to another edition of this title.
Excerpt. © Reprinted by permission. All rights reserved.
Hours
Rate
Total
Rate
Total Labor...................................3.00
$...
$...
$19.13
$57.39 Hoisting engineer
.35
...
...
25.96
9.09
Cost per c.y.
$...
$66.48
Cost per cu.m
Hours
Rate
Total
Rate
Total Labor...................................3.92
$...
$...
$19.13
$74.99 Hoisting engineer
.46
...
...
25.96
11.94
Cost per c.y.
$...
$86.93 If union rules require a mixer engineer, deduct 0.35 (.46) hours labor time and add 0.35 (.46) hours engineer time per c.y. (cu.m). If concrete is discharged from mixer directly into a hoist concrete bucket and wheeled from a floor hoppper to place of deposit, deduct .50-hr. Labor time. For concrete roof fill on flat roofs, deduct about 10% from the above costs. On pitch or gable roofs, add 25% to 50%, depending on the steepness of slope, accessibility, etc. After the cubic yard (cu.m) cost has been computed, to obtain the s.f. (sq.m) cost, divide the c.y. (cu.m) cost by the number of s.f. (sq.m) of fill obtainable from one c.y. (cu.m) and the result will be the labor cost per s.f. (sq.m) of fill. Example: find the s.f. (sq.m) labor cost of 3" (.075 m) floor fill with a cost of $43.90 per c.y. (57.39 per cu.m). The tables on previous pages give 108 s.f. of 3" (10 sq.m of .075 m) fill obtainable from one c.y. $43.90/108 = $0.406 per s.f (57.39/10 = $5.74 per sq.m). To the above costs must be added the cost of setting screeds and all finishing operations.
"About the title" may belong to another edition of this title.
Cheryl's Books
Vinemont, AL, U.S.A.
AbeBooks seller since April 17, 2025
Shipping rates within U.S.A.
| Item | 5 to 14 business days | 3 to 6 business days |
|---|---|---|
| First item | US$ 6.45 | US$ 9.75 |
Payment methods
Store description
Cheryl's Books has a wide variety of used, rare, and out-of-print books for your reading enjoyment. With an inventory of over 17,000 titles, you are sure to find the book you are looking for. Our inventory is growing rapidly and new items are added daily, so check our inventory often.
Specialty
Used, rare, and out-of-print booksSeller's business information
Cheryl's Books
AL, U.S.A.
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're
dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order
hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If
you've changed your mind about a book that you've ordered, please use the Ask bookseller a
question link to contact us and we'll respond within 2 business days.
Shipping terms
Shipping costs are based on books weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.