Handbook of Process Integration (Pi): Minimisation of Energy and Water Use, Waste and Emissions
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketHandbook of Process Integration (PI): Minimisation of Energy and Water Use, Waste and Emissions, Second Edition provides an up-to-date guide on the latest PI research and applications. Since the first edition published, methodologies and sustainab.
Seller Inventory # 470977554
Handbook of Process Integration (PI): Minimisation of Energy and Water Use, Waste and Emissions, Second Edition provides an up-to-date guide on the latest PI research and applications. Since the first edition published, methodologies and sustainability targets have developed considerably. Each chapter has been fully updated, with six new chapters added in this release, covering emissions, transport, water scarcity, reliability and maintenance, environmental impact and circular economy. This version also now includes worked examples and simulations to deepen the reader’s understanding.
With its distinguished editor and international team of expert contributors, this book is an important reference work for managers and researchers in all energy and sustainability industries, as well as academics and students in Energy, Chemical, Process, and Environmental Engineering.
Prof Dr-Hab Jiří Jaromír KLEMEŠ, DSc, Dr h c (mult) and George Pólya Professor. Head of a Centre of Excellence “Sustainable Process Integration Laboratory – SPIL”, NETME Centre, Faculty of Mechanical Engineering, Brno University of Technology - VUT Brno, Czech Republic. Previously the Project Director, Senior Project Officer and Hon Reader at Department of Process Integration at UMIST, The University of Manchester and the University of Edinburgh, UK Founder and a long-term Head of the Centre for Process Integration and Intensification – CPI2, University of Pannonia, Veszprém, Hungary. Awarded by the EC with Marie Curie Chair of Excellence (EXC). Track record of managing and coordinating 97 major EC, NATO, bilateral and UK Know-How projects. Research funding attracted over 46 M€. Co-Editor-in-Chief of Journal of Cleaner Production (IF 2020 = 9.297) and Chemical Engineering Transactions, Editor in Chief Cleaner Technologies and Engineering and Cleaner Chemical Engineering (Elsevier); Subject Editor of Energy (IF 2020 = 7.147) Managing Guest Editor of Renewable and Sustainable Energy Reviews (IF 2020 = 14.982). The founder and President of 25 y of PRES (Process Integration for Energy Saving and Pollution Reduction) conferences. Seven years Chairperson of CAPE Working Party of European Federation of Chemical Engineering, a member of WP on Process Intensification. A Member of the IChemE, UK, Sargent Medal International Committee on CAPE. Awarded by the Web of Science and Publons as a Highly Cited Researcher, Top Peer Reviewer and Top Handling Editor. He authored and co-authored 792 papers (WoS) in 106 scientific journals, h-index in Google Scholar 78, Scopus 67, PUBLONS (WoS) 61. His Publons profile (Web of Science) has 2,552 reviews for 186 scientific journals and 17,020 Editor Merits for 24 Editorial boards. Invited lecturer at 68 universities, 14 Distinguished Visiting Professor, 6 Doctor Honoris causa, 36 PhD students, 44 Expert Evaluator. Several times Distinguished Visiting Professor incl Universiti Teknologi Malaysia and University Technology Petronas, Malaysia; Xi’an Jiaotong University; the South China University of Technology, Guangzhou, Xi’an Jiaotong-Liverpool University Suzhou, JiangSu, and Tianjin University in China; University of Maribor, Slovenia; the Brno University of Technology, the Russian Mendeleev University of Chemical Technology, Moscow and Cracow University of Technology, Poland. Doctor Honoris Causa of Kharkiv National University “Kharkiv Polytechnic Institute”, Ukraine, the University of Maribor, Slovenia, University POLITEHNICA Bucharest, Romania, Széchenyi István University Györ, Hungary and “Honorary Doctor of Engineering” Universiti Teknologi Malaysia”. Awarded with “Honorary Membership of Czech Society of Chemical Engineering”, “European Federation of Chemical Engineering (EFCE) Life-Time Achievements Award” and “Pro Universitaire Pannonica” Gold Medal.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | US$ 57.49 | US$ 57.49 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.