Integration of Nature and Technology for Smart Cities
Anil Ahuja
Sold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since August 14, 2006
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: 1 available
Add to basketSold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since August 14, 2006
Condition: New
Quantity: 1 available
Add to basketDruck auf Anfrage Neuware - Printed after ordering - This book is a resumption of the work 'Integrated M/E Design: Building Systems Engineering' published by Anil Ahuja in 1997. Together with an international group of authors from the engineering, urban planning, and architecture fields, Mr. Ahuja discussed new trends and paradigms in the smart buildings and smart city sectors and extended the topic of the previous publication from the building to the entire city. A smart, sustainable building is not just about the building itself. There are things happening in the inside of the building and on the outside. A smart building connects the inside with the outside, provides efficiencies on both sides, synchronizes the outside infrastructure with its inside systems, and integrates nature and its occupants in its design. A smart building doesn't just provide technology solutions. It is about constant exchange between the inside and the outside of the building, the contribution of the building to the quality of the entire neighborhood and the rest of the city, how the smart building can connect people in a sharing community, and how technology can be the key to make it happen.
Seller Inventory # 9783319257136
Mr. Ahuja is President of CCJM, a multi-disciplinary engineering firm providing Smart City and Smart Building designs, including urban development strategies, major water and wastewater system engineering, and bridge and highway design and rehabilitation.
Anil has been active in the sustainability field for many years. He joined the Board of Directors of USGBC-IL in 2015. Additionally, Anil is a Board Member of the Chicagoland Chamber of Commerce and currently serves as Chair for the Environmental and Sustainability Committee. As chair of IMSA’s Energy Center, Anil is co-developing innovation prototypes that transform teaching and learning in science, technology, engineering and mathematics (STEM).
Anil has over 30 years of experience in sustainable Building Systems Design, Design Management, Construction Management, Commissioning and Operations and Maintenance. Prior to joining CCJM, Anil served as Vice President/General Manager of the Integrated Building Services Groupwith a focus on the 2020 Energy Vision Program at Exelon Corporation (the largest utility in the United States), ComEd’s parent company. Other past experience includes Chief Engineer of Building Systems at The Austin Company, an international design/build company and Chief Engineer on board merchant ships.
Anil has written several articles for Pure Power Magazine and Building Design and Construction. He is a regular contributor and was featured three times on the cover of Consulting Specifying Engineer (July 2004, February, 2001 and September, 1994 issues). Anil is also recently featured in the anniversary issue of i4Design Magazine in its “wall of fame” as one of the Midwest’s established stars.
His sustainable design work has led to participation on the Chicago Center for Green Technology Engineering Advisory Committee. Integration of building systems is a continuing focus of Anil’s as evidenced with his involvement with ASHRAE’s Technical Committee on Integrated Design.
"About this title" may belong to another edition of this title.
General Terms and Conditions and Customer Information / Privacy Policy
I. General Terms and Conditions
§ 1 Basic provisions
(1) The following terms and conditions apply to all contracts that you conclude with us as a provider (AHA-BUCH GmbH) via the Internet platforms AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of any of your own terms and conditions used by you will be objected to
(2) A consumer within the meaning of the following regulations is any natural person who concludes...
We ship your order after we received them
for articles on hand latest 24 hours,
for articles with overnight supply latest 48 hours.
In case we need to order an article from our supplier our dispatch time depends on the reception date of the articles, but the articles will be shipped on the same day.
Our goal is to send the ordered articles in the fastest, but also most efficient and secure way to our customers.
| Order quantity | 30 to 40 business days | 7 to 14 business days |
|---|---|---|
| First item | US$ 74.87 | US$ 86.49 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.