International Conference on Civil Engineering Innovative Development in Engineering Advances (ICC IDEA - 2025) Volume 4
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 2568882683
This book presents select proceedings from the International Conference on Civil Engineering Innovative Development in Engineering Advances (ICC IDEA 2025), highlighting holistic innovations in civil engineering for sustainable and smart infrastructure development. It covers breakthrough technologies and integrated approaches aimed at enhancing the sustainability, resilience, and intelligence of modern infrastructure. Topics include smart cities, eco-friendly construction practices, renewable energy integration, advanced materials, and digital solutions such as Internet of Things (IoT) and Building Information Modeling (BIM) for optimizing infrastructure performance. The book also explores sustainable urban planning, green infrastructure, and strategies for reducing the environmental footprint of civil engineering projects. It serves as a valuable resource for students, researchers, and professionals involved in civil engineering, urban development, and smart infrastructure planning.
Dr. Mohammed Alias Yusof
Dr. Mohammed Alias Yusof is currently a Professor in the Department of Civil Engineering at Universiti Pertahanan Nasional, Malaysia. He specializes in blast-resistant materials and construction project management. He holds a Ph.D. in Civil Engineering from Universiti Pertahanan Nasional, Malaysia (2012), an M.Sc. in Construction Project Management from Universiti Teknologi MARA, Malaysia (2005), and a B.E. in Civil Engineering from Universiti Teknologi Malaysia (2002).
Dr. Sreevalsa Kolathayar
Dr. Sreevalsa Kolathayar is an Associate Professor in the Department of Civil Engineering at the National Institute of Technology Karnataka (NITK), one of India’s premier technical institutions. He earned his M.Tech. from IIT Kanpur and Ph.D. from the Indian Institute of Science (IISc), and served as International Research Staff at UPC BarcelonaTech, Spain. Dr. Sreevalsa has authored/edited 21 books, published over 150 research articles, and holds five patents. His books are globally recognized and used as reference texts in prestigious institutions such as MIT, Stanford, IITs, and NITs. He has received numerous awards, including the IEI Young Engineer Award, South India’s Most Inspiring Young Teacher Award, and the ISET D.K. Paul Research Award. He actively contributes to professional and academic communities, serving on editorial boards of international journals, technical committees of the ASCE Geo-Institute, and working groups of BIS CED 39.
Dr. S. Durgadevagi
Dr. S. Durgadevagi is currently an Associate Professor in the Department of Civil Engineering at SRM Institute of Science and Technology, Kattankulathur Campus. She has fourteen years of diverse experience in academics and research projects. She completed her B.E in Civil Engineering at Anna University, Chennai, her M.E. in Geoinformatics with a gold medal at the College of Engineering, Guindy, Anna University and her Ph.D. at SRM Institute of Science and Technology, Kattankulathur. She has published more than 30 research papers in peer-reviewed journals. Dr. Durgadevagi has successfully undertaken a major funded project titled "Enabling of Academic Institutes in Technical Textiles”, as a Co- Principal Investigator, supported by the National Technical Textiles Mission (NTTM), Ministry of Textiles, with a grant of ₹5.09 crore.
Dr. R. Ramasubramani
Dr. R. Ramasubramani is an Associate Professor in the Department of Civil Engineering at SRM Institute of Science and Technology, Kattankulathur Campus. He obtained his B.E. in Civil Engineering from Anna University, followed by an M.Tech. in Structural Engineering and a Ph.D. in Concrete Technology from SRM Institute of Science and Technology. His research focuses on sustainable and advanced concrete materials, including coconut shell concrete, fiber-reinforced concrete, high-strength concrete, and innovative structural systems. Dr. Ramasubramani has published over 70 papers in SCI and Scopus-indexed journals, served as a reviewer for 14 international journals, and holds one granted patent with two more published. Dr. Ramasubramani served as Co-Principal Investigator for a major funded project titled “Enabling of Academic Institutes in Technical Textiles”, supported by the National Technical Textiles Mission (NTTM), Ministry of Textiles, with a grant of ₹5.09 crore.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | US$ 56.89 | US$ 56.89 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.