The Making of the Channel Tunnel | 10 + (1 Duplicate) Original Colour Photographs of the Channel Tunnel Construction Comprising (i): 30-08-1987 Howden Engineering Glasgow View of T.B.M. and System Being Dismantled Prior to Transhipment to Dover Site (ii): 18-08-1987 Assembly of T.B.M. No. 1 Howden Engineering Glasgow (iii): 18-08-1987 Assembly of T.B.M. No. 1 Howden Engineering Glasgow (iv): 13-09-1987 Delivery of T.B.M. Drive Module Romules & Remus First of the Hunsiet Rack and Adhesion Locos on Site at Shakespeare Cliffs, Dover (v): 13-09-1987 Delivery of T.B.M. Drive Module Romules & Remus First of the Hunsiet Rack and Adhesion Locos on Site at Shakespeare Cliffs, Dover (vi): 18-08-1987 Assembly of T.B.M. No. 1 Howden Engineering Glasgow
Aero Industrial Photographic | Howden Engineering Glasgow | Transmanche Link Joint Venture |
Sold by Little Stour Books PBFA Member, Canterbury, United Kingdom
Association Member:
Heritage Bookseller
AbeBooks Seller since November 17, 1999
Used
Ships from United Kingdom to U.S.A.
Quantity: 1 available
Add to basket