Oil & Gas Handbook : A Roughneck's guide to the Universe
Language: English
Published by Authorhouse, 2012
- Softcover
- New

Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH
AbeBooks seller since August 14, 2006
Condition: New
US$ 37.92
Quantity: 2 available
Add to basketItem description from seller
nach der Bestellung gedruckt Neuware - Printed after ordering - This book offers you a brief, but very involved look into the operations in the drilling of an Oil & Gas well. From start to finish, you'll see a general prognosis of the drilling process. If you are new to the oil & gas industry, you'll enjoy having a leg up with the knowledge of these processes. If you are a seasoned oil & gas person, you'll enjoy reading what you may or may not know in these pages.
Seller Inventory # 9781468545319
- Title
- Oil & Gas Handbook : A Roughneck's guide to the Universe
- Author
- Will Pettijohn P. E. C.
- Publisher
- Authorhouse
- Publication year
- 2012
- Condition
- Neu
- Binding
- Taschenbuch
- Language
- English
- ISBN 10
- 1468545310
- ISBN 13
- 9781468545319
- Item weight
- 276 grams
- Dimensions
- 229x152x10 mm
"Synopsis" may belong to another edition of this title.
Excerpt. © Reprinted by permission. All rights reserved.
OIL & GAS HANDBOOK
A ROUGHNECK'S GUIDE TO THE UNIVERSEBy Will PettijohnAuthorHouse
Copyright © 2012 Will Pettijohn P.E.C.All right reserved.
ISBN: 978-1-4685-4531-9
Contents
Chapter 1 Rig move & rig up................................................1Chapter 2 Pre-spud Inspection..............................................11Chapter 3 Spudding in......................................................15Chapter 4 Drilling surface.................................................17Chapter 5 Running surface casing...........................................10Chapter 6 Blowout preventers...............................................22Chapter 7 Nipple up B.O.P.'s...............................................24Chapter 8 Testing the B.O.P.'s.............................................27Chapter 9 Drillout.........................................................28Chapter 10 Vertical wells..................................................31Chapter 11 Horizontal wells................................................31Chapter 12 Directional wells...............................................34Chapter 13 Total Depth (TD)................................................35Chapter 14 Tripping pipe...................................................36Chapter 15 Laying down drill pipe..........................................38Chapter 16 Running intermediate casing.....................................40Chapter 17 Running production casing.......................................42Chapter 18 Rig release.....................................................44Chapter 19 Rigging down....................................................45Chapter 20 Rig Equipment...................................................47Chapter 21 Terms and Definitions...........................................53Chapter 22 State of Mind...................................................62Chapter 23 The Totem Pole..................................................64Chapter 24 Surface kill sheet..............................................66Chapter 25 Descriptions of air hammer drilling.............................68Chapter 26 History of air hammers..........................................69Chapter 27 Air drilling techniques.........................................72Chapter 28 Mist drilling...................................................79Chapter 29 Stable and stiff foam drilling..................................82Chapter 30 Air compressors.................................................85Chapter 31 Estimating flow rates...........................................87Chapter 32 Particle dynamics...............................................92Chapter 33 Rule of thumb calculations for air drilling.....................95Chapter 34 Hammers.........................................................98Chapter 35 Mud motors......................................................101Chapter 36 Geology.........................................................115Chapter 37 Blow outs.......................................................121Chapter 38 Helpful equations and factors...................................124Chapter 39 Oilfield acronyms...............................................133Chapter 40 Closing.........................................................171
Chapter One
Rig move & rig upAll oil or gas wells begin in the same place. We must have a drilling rig, a location and a drilling program to complete the operation of drilling an oil or gas well.
(Location; a permitted piece of property designed to support and maintain the Rig during normal drilling operations)
Once we have our location permitted and surveyed, it must then be designed for the type of rig that is going to move onto it. If your rig is a diesel electric, for example; you will probably need a much larger location than a double jackknife or single lay-down rig would need. These are three different types of rigs that we will cover later. If your Rig requires a reservoir or reserve pit, it should be ready and lined, before you arrive on location.
If your rig is a multi load rig, you will use several trucks to move the rig. Some rigs, such as an RD-20 or a Schramm rig are mounted onto a truck themselves and only require trucks to move their pipe trailers and equipment. We should have trucks on location early. You will see several different types of trucks, such as haul trucks, bed trucks, pole trucks "in some instances" and cranes and forklifts if necessary. These trucks will have their own operators and more than likely a swamper for each truck; swampers do the tying on and spotting.
You as a roughneck will more than likely need to help these people in tying onto and spotting the equipment as it is moved. If your rig is large enough to use several trucks, you will more than likely have one crew on the old location, loading out the equipment and one crew on the new location doing a spot in rig up.
(Spot in rig up; rigging up all that you can, as the rig is brought in that doesn't slow the rig move down)
You will need several tools, so ask your driller or tool pusher/ rig manager what tools you will need. Remember, the more you do without being told, the quicker you'll move up in this industry. You will be helping someone who knows where each load is to be placed. As the loads begin arriving, try and think about where they are supposed to go and be ready for them. For the most part, your rig will only go together one way. After you have rigged the Rig up once, you will know better where things are and supposed to be.
(Remember that everything you put together should be tight and ready to drill. If you put something together handy "hand tight" it looks tight and it may be missed later, some things that are pressurized during normal drilling operations and are not tight could result in an accident. So if you put it together, tighten it up; this will save valuable time and energy later, because it will already be done. And it also may prevent a horrific accident if it is done right the first time.)
In general, the first things that will arrive will be the substructure and several other loads at once, (mud tanks) also known as mud pits will come with the first loads. The substructure, draw works and other loads that will be used to put these together. First they will bring in the substructure and level it. The substructure is placed in the center of the location over the planned well-bore. The mud tanks are always placed at the back of location next to the reserve pit (if applicable) or reclamation tanks in other cases will be set up to receive the materials that will be removed from the earth during the drilling operations. Then they will bring in the shaker/ sand pit and set it into place. They will place it and adjust it according to the schematic of your rig. If your rig has a two tank system, they will bring in the settling/suction pit next. Unless your rig only has a one mud tank system which is becoming more common in many cases; then these two will serve the purpose of holding, treating and reclaiming the active drilling fluids during the drilling operations. This is where you come in; you will need to connect all of the hoses, risers and spreaders between the two tanks and install the walkway and handrails. After the pit/pits are set in, ask your supervisor if you need to put any handrails or anything else on top of them (remember to wear your harness if there is a chance of falling). Some mud tanks/pits have stationary handrails and others do not, it usually depends upon the height restrictions when mobilizing. You may also need to bolt down a de-sander/de-silter or shaker assembly and connect any hoses that would accompany them as well. These may be removed or they may stay on the mud tanks when mobilizing; depending on how tall your tanks are, some equipment must be removed for clearances under bridges and other low lying structures.
After the pits have been set in, a lot more will be happening. Your supervisor will let you know what you will be doing as the day progresses. Remember O.S.H.A. (the Occupational Safety & Health Administration) a federal safety and regulatory organization, has certain laws that you must comply with. So you'll need to remember the safety rules that your company has set forth in accordance to the regulations and made you aware of. We will cover a few of the O.S.H.A. rules as we get further in depth. For instance, any person that is 4 feet or more off of the ground (at their foot position) must be tied off 100% using a fall protection apparatus. This is usually a full body harness, if you have to wear a full body harness, it should be fitted to your body frame and inspected daily for wear and tear. After you have observed the safety rules of O.S.H.A. and your company, it's time to get to work.
During the process of installing the mud tanks and hooking them together, the substructure will be set in and leveled. If you are going to be putting the substructure together, you will have to use a few tools. You may need to drive pins into the different components to secure them together. You may have to use a level, to insure the substructure is level and drill stable. This is usually done while the pusher has the trucks raise or lower to adjust it and level it by placing boards under the sides or front and back. The substructure is the base of the operation; this is what holds everything else above it. A substructure is rated for depth and weight by certain qualities that are built into the structural steel. These range from shallow hole substructures to more than forty thousand feet substructures and this is regulated by mandatory periodic inspections called category (CAT) inspections. After the substructure is now spotted in place, level and ready to receive the other components, you will have to get with your supervisor to find out where you'll be working. There are several different types of substructures. There are hydraulic slingshot substructures, box type substructures, double box substructures and even pony substructures. You may receive two sides and several components that will be placed in the middle to connect the two sides. These inner pieces are often called frogs, because they jump from one side to the other. You may see one large substructure on your rig. This type of substructure usually only has a rotary table that is removed for mobilization. The box on box type substructure usually has one main base substructure and then pony substructures that are placed under them to obtain a certain height requirement. This is usually to accommodate a blow out preventer configuration for the area that you'll be drilling in.
After the substructure has been put together and leveled, the derrick is ready to be installed; the crane or pole trucks will attach a cable or sling onto either end of it and maneuver it over the substructure where it is to be pinned onto the floor of the substructure. You will then line it up and drive your pins into the allotted pin holes. The derrick stand will be placed under the other end of the derrick. The trucks will lower the derrick onto the stand; this in turn, will release the trucks from the derrick, so they can continue to rig up. After pinning the derrick and releasing the trucks, one truck will raise the a-legs. After the a-legs are raised and pinned into place the blocks will be set onto the catwalk to be strung up with drilling line. The derrick is the large tower structure which stands in the air and houses the traveling blocks, or the track and top drive which will be installed after it is pinned to the substructure. The derrick is usually the only part of the rig you see in the air when the rig is noticed from a distance. The derrick is also called a mast, but the more common term in the oilfield is derrick. If your rig is a free block and tackle rig, then you will string the blocks and install the pick-up line (also called a bull line) at this point. If it is a top drive rig, then you will install the track that it will ride on and then string the blocks and install the bull line. The derrick keeps the blocks and drilling assembly in the center of the operation to distribute the weight of the drill string. The weight of the drill string can astonish some people who aren't used to dealing with weights such as that. A derrick is designed very carefully and is an engineering marvel.
On all rigs except truck mounted rigs, or hydraulic track rigs, you will install the draw works, also known as a draw tool. This is the winch on for the power end of the rig. There will be a large winch assembly with either mechanical motors or electrical components to power it and allow the blocks to be moved up or down when needed. In the instance of mechanical motors, they will be either attached to the draw works skid, or they will be separate and will be attached using chains which drive the torque converters which in turn power a clutch and then gears that operate the blocks. If your rig is a SCR (silicon-controlled-rectifier) you will need to attach the electrical lines to provide the power source to the draw works. On an SCR rig, the difference is; the motors which power the gears are electric friction motors, instead of mechanical geared motors. These are often cleaner and less noisy rigs that are capable of a lot more horsepower. After all fuel lines, electrical lines and hydraulic lines have been ran to their proper place and tightened up to the motors or power source; then you can string your blocks and bull line, or install the top drive track for the blocks, with 6,8,10 or in some cases even12 lines; this will allow more or less string weight to be lifted by the blocks.
(Example: If your blocks have 5 sheaves, you could Rig up on 6, 8 or 10 lines)
The blocks may use 8 lines if the well is not going to be very deep. Most rigs use 10 to 12 lines if the blocks are capable to handle the weight and the blocks house enough sheaves. The more lines used, the slower the blocks will travel, but the more weight you're able to lift with the blocks. After you have strung the blocks, using the drilling line, then you will attach it to the draw works. Some rigs leave the blocks strung up when they move. These are usually the smaller rigs, but if it is an option, it makes it convenient and efficient for moving and rigging up. Different size rigs use different size drilling line and will also use a different number of lines running through the blocks. After you get the block or top drive rigged up, you should be ready to raise the derrick.
The next step is raising the derrick, with the exception of the truck mounted rigs that we discussed earlier, where the derrick is mounted permanently; this is not referring to the fixed truck rigs that scope up and down. The truck mounted rigs stay together and to raise the of derrick, you simply pull hydraulic levers. You can now perform the visual derrick inspection and weight stress test. The derrick inspection is a visual inspection, to insure that all safety pins, bolts, shackles and clevises are installed properly
(Note: If any piece of equipment is to be overhead, it must be approved to be used as an overhead device; secured using a safety pin assembly and a safety cable in the event that the safety pin should fail. This will insure that the equipment will not fall out of the derrick during the raising or drilling operations.)
The stress test is a company regulated test, as well as an API (American Petroleum Institute) standard test to be performed on the derrick at its heaviest and most stressful point. Once the derrick is raised off of the derrick stand, which is the most stressful point. The industry standard is @ 89° degrees or 6" for 20 minutes. This means, that you'll raise the derrick off of the derrick stand approximately 6" and hold it there for approximately 20 minutes. This places all of the weight on the pick-up line or bull line. The objective of this test is to prevent dropping the derrick in the event of a line failure. If the line fails, the derrick will only fall the distance that it is off of the stand and is less likely to hurt someone falling such a short distance.
A visual walk around inspection of these lines, sheaves and all other components should be performed before and during the stress test. Once the stress test is performed and all lines have passed, the derrick can then be raised and pinned into place and the rig up can be completed.
(Warning) do not stand under the derrick as it is being raised.
Anything could happen, causing the derrick to fall and crush you. Even a new line can fail and cause the derrick to fall. Stay a safe distance away while you're watching all of the lines and keeping them from getting pinched or hung onto something during the raising process.
The next step, after the derrick is pinned and secured, is to begin bringing all of the floor equipment onto the rig floor. Such as the tongs, swivel, kelly, valves and miscellaneous tools needed. The tongs are going to be hung onto separate stationary cables attached to the derrick and counter weight buckets; these counterweights will assist in raising and lowering the tongs due to the extreme weight of them. The tongs are also attached to the derrick leg using a snub-line; this prevents the tongs from moving further than the desired position and causing serious injury when being used. The tongs are also hooked to a cable or chain from the draw-works; this is the power side of the tongs and will force the tongs in a desired direction to tighten or loosen the tubular as it is being placed into or removed from the drill string.
(Tubular; is a piece of threaded pipe, drill pipe/drill collar, casing, motor, sub etc.)
Now the (back yard) can be completely rigged up and prepared for the drilling operations. The back yard refers to everything that goes behind the rig. At this time, you will probably spot in the mud mumps, two if applicable, some rigs only use one mud pump and others use up to three. So you will have one, two or three of them to rig up and connect together, depending on how large your rig is and how deep you are drilling. Most rigs have tri-plex pumps; they use three swab pistons to pull in and expel the drilling fluid; which will give the desired volume and pressure will be needed to drill. After spotting the mud pumps, you will probably set in the rest of your back yard; such as a water tank, light plant/generator or SCR house, mud house (if applicable), a diesel tank and the other buildings that may also be on your well site.
All drilling rigs must have diesel, the diesel lines will have to be ran and hooked up to all components. Some rigs are diesel electric rigs; these rigs have an SCR house that distributes electricity to miscellaneous components instead of using a specific motor for each individual component. In this instance, an electric line is ran and attached to each component, with a variety of distribution panels in strategic places; this will allow one single large cable to be ran to the distribution panel and the smaller satellite cables will be ran to the many components from there.
On the power rigs, or compound rigs, this changes a bit. Power rigs, also called compound rigs, due to the oil storage reservoir it uses to lubricate the gears, will have a motor for each component such as the draw-works, mud pumps and even the generator. Even as the component has its own motor, it will still need diesel and more than likely air for the starter and clutch. On most power rigs; you will need 3 lines ran to each motor, one for diesel, one for air supply and one for the clutch actuation to engage the clutch from a remote panel. If lights are on the component, or it has an electric actuation solenoid, you will need to run an electric line to these motors as well.
(Continues...)
Excerpted from OIL & GAS HANDBOOKby Will Pettijohn Copyright © 2012 by Will Pettijohn P.E.C.. Excerpted by permission of AuthorHouse. All rights reserved. No part of this excerpt may be reproduced or reprinted without permission in writing from the publisher.
Excerpts are provided by Dial-A-Book Inc. solely for the personal use of visitors to this web site.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 7 to 10 business days | 5 to 7 business days |
|---|---|---|
| First item | US$ 39.21 | US$ 50.41 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Das Unternehmen AHA-BUCH GmbH: Seit der Gründung von AHA-BUCH im Juli 2005 ist unser Hauptziel, zufriedenen Kunden so schnell und so preisgünstig wie möglich ihren Bücherwunsch zu erfüllen. Unsere Firma beschäftigt 16 Mitarbeiter, die nur ein Ziel kennen: den Kunden und seine Wünsche! Auf über 3700 m2 Fläche haben wir über 100.000 Bücher, Modernes Antiquariat und Spiele auf Lager.
Specialty
Kinderbücher & Kinderhör Casetten, German Books, Software, Natur & Tiere, Ratgeber, Sachbücher, Englische Bücher, Medizin & Gesundheit, Universität & StudiumSeller's business information
AHA-BUCH GmbH
Garlebsen 48
Einbeck, Germany 37574
Terms of sale
General Terms and Conditions and Customer Information / Privacy Policy
I. General Terms and Conditions
§ 1 Basic provisions
(1) The following terms and conditions apply to all contracts that you conclude with us as a provider (AHA-BUCH GmbH) via the Internet platforms AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of any of your own terms and conditions used by you will be objected to
(2) A consumer within the meaning of the following regulations is any natural person who concludes a legal transaction for purposes that can predominantly be attributed neither to their commercial nor their independent professional activity. An entrepreneur is any natural or legal person or a partnership with legal capacity who, when concluding a legal transaction, acts in the exercise of his independent professional or commercial activity.
§ 2 Conclusion of the contract
(1) The object of the contract is the sale of goods.
(2) If an article is listed by us at AbeBooks or ZVAB, the activation of the offer page at AbeBooks or ZVAB constitutes the binding offer to conclude a contract under the conditions contained in the article page.
(3) The contract is concluded via the online shopping cart system as follows:
The goods intended for purchase are stored in the "shopping cart". Via the corresponding button in the navigation bar you can call up the "shopping cart" and make changes there at any time.
After calling up the "Checkout" page and entering the personal data as well as the payment and shipping conditions, all order data will be displayed again on the order overview page.
Before sending the order, you have the option of checking all information again, changing it (also via the "back" function of the Internet browser) or cancelling the purchase.
By submitting the order via the "Buy now" button, you declare the acceptance of the offer in a legally binding manner, whereby the contract is concluded.
(4) The processing of the order and transmission of all information required in connection with the conclusion of the contract is partly automated by e-mail. You must therefore ensure that the e-mail address you have stored with us is correct, that the receipt of the e-mails is technically ensured and, in particular, that spam filters do not prevent it.
§ 3 Right of retention, retention of title
(1) You can only exercise a right of retention if it concerns claims from the same contractual relationship.
(2) The goods remain our property until full payment of the purchase price.
§ 4 Warranty
(1) The statutory warranty rights exist.
(2) In the case of used goods, the warranty period is one year from delivery of the item, deviating from the statutory regulation. The shortening of the deadline does not apply:
- culpably caused damages attributable to us from injury to life, limb or health and in the case of other damages caused intentionally or through gross negligence;
- insofar as we have fraudulently concealed the defect or have assumed a guarantee for the quality of the item.
(3) As a consumer, you are requested to check the item immediately upon delivery for completeness, obvious defects and transport damage and to inform us and the freight forwarder of any complaints as soon as possible. If you do not comply with this, this will have no effect on your statutory warranty claims.
§ 5 Choice of law, place of performance, place of jurisdiction
(1) German law shall apply. In the case of consumers, this choice of law shall only apply insofar as this does not withdraw the protection afforded by mandatory provisions of the law of the state of the consumer's habitual residence (principle of favourability).
(2) The place of performance for all services arising from the existing business relationships with us as well as the place of jurisdiction is our registered office, insofar as you are not a consumer, but a merchant, a legal entity under public law or a special fund under public law. The same applies if you do not have a general place of jurisdiction in Germany or the EU or if the domicile or habitual residence is not known at the time the action is brought. The right to appeal to the court at another statutory place of jurisdiction remains unaffected by this.
(3) The provisions of the UN Convention on Contracts for the International Sale of Goods shall expressly not apply.
II. Customer Information
- Identity of the Seller
AHA-BUCH GmbH
Garlebsen 48
D-37574 Einbeck
Germany
Telephone: 055639996039
E-mail: abebooks@aha-buch.de.
Alternative dispute resolution:
The European Commission provides a platform for out-of-court online dispute resolution (ODR platform), which can be accessed under https://ec.europa.eu/odr.
- Information on the conclusion of the contract
The technical steps for the conclusion of the contract, the conclusion of the contract itself and the correction options are carried out in accordance with the provisions "Conclusion of the contract" of our General Terms and Conditions (Part I.).
- Contract language, contract text storage
3.1. The contract language is german.
3.2. The complete text of the contract will not be stored by us. Before sending the order, the contract data can be printed out or electronically saved via the print function of the browser. After receipt of the order by us, the order data, the legally prescribed information for distance contracts and the General Terms and Conditions will be sent to you again by e-mail.
- Essential characteristics of the goods or services
The essential characteristics of the goods and/or services can be found in the respective offer.
- Prices and terms of payment
5.1. The prices stated in the respective offers as well as the shipping costs represent total prices. They include all price components including all applicable taxes.
5.2. The shipping costs incurred are not included in the purchase price. They can be called up via a correspondingly designated button on our website or in the respective offer, are shown separately in the course of the ordering process and are to be borne by you in addition, unless free shipping has been promised.
5.3. If the delivery is made to countries outside the European Union, we may incur additional costs for which we are not responsible, such as.B customs duties, taxes or money transfer fees (transfer or exchange rate fees of the credit institutions), which are to be borne by you. Any costs incurred for the transfer of money shall also be borne by you in cases where the delivery is made to an EU member state, but the payment was initiated outside the European Union.
5.4. The payment methods available to you are indicated under a corresponding button on our website or in the respective offer.
5.5. Unless otherwise stated for the individual payment methods, the payment claims from the concluded contract are due for payment immediately.
- Terms of delivery
6.1. The terms of delivery, the delivery date and, if applicable, existing delivery restrictions can be found under a correspondingly designated button on our website or in the respective offer.
Insofar as no other deadline is specified in the respective offer or under the correspondingly designated button, the delivery of the goods will take place within 3-5 days after conclusion of the contract (in the case of agreed advance payment, however, only after the time of your payment instruction).
6.2. Insofar as you are a consumer, it is regulated by law that the risk of accidental loss and accidental deterioration of the sold item during dispatch shall only pass to you upon handover of the goods, regardless of whether the shipment is insured or uninsured. This does not apply if you have independently commissioned a transport company not named by the entrepreneur or a person otherwise designated to carry out the shipment.
- Statutory liability for defects
Liability for defects is governed by the "Warranty" provision in our General Terms and Conditions (Part I).
last update: 01/06/2022
Privacy policy
Unless otherwise stated below, the provision of your personal data is neither required by law or contract, nor is it necessary for the conclusion of a contract. You are not obliged to provide the data. Failure to provide this will have no consequences. This only applies if no other information is provided in the subsequent processing operations.
Collection, processing and disclosure of personal data when placing orders
When ordering, we collect and process your personal data only to the extent necessary to fulfil and process your order and to process your enquiries. The provision of the data is necessary for the conclusion of the contract. Failure to provide this provision means that no contract can be concluded. The processing takes place on the basis of Art. 6 para. 1 lit.b GDPR and is necessary for the performance of a contract with you.
Your data will be passed on, for example, to the shipping companies and dropshipping providers selected by you, payment service providers, service providers for order processing and IT service providers.
In all cases, we strictly observe the legal requirements. The scope of data transmission is limited to a minimum.
Duration of storage
After completion of the contract, the data will first be stored for the duration of the warranty period, then taking into account legal, in particular tax and commercial retention periods and then deleted after expiry of the period, unless you have consented to further processing and use.
Rights of the data subject
If the legal requirements are met, you have the following rights under Articles 15 to 20 GDPR: Right to information, to correction, to erasure, to restriction of processing, to data portability.
In addition, pursuant to Article 21 (1) GDPR, you have the right to object to processing based on Article 6 (1) f GDPR and to processing for direct marketing purposes.
Contact us on request. The contact details can be found in our imprint.
Right to lodge a complaint with the supervisory authority
In accordance with Article 77 GDPR, you have the right to complain to the supervisory authority if you believe that the processing of your personal data is not lawful.
Right to object
If the personal data processing listed here is based on our legitimate interest pursuant to Art. 6 para. 1 lit. f GDPR, you have the right to object to this processing at any time with effect for the future for reasons arising from your particular situation.
Shipping terms
We ship your order after we received them
for articles on hand latest 24 hours,
for articles with overnight supply latest 48 hours.
In case we need to order an article from our supplier our dispatch time depends on the reception date of the articles, but the articles will be shipped on the same day.
Our goal is to send the ordered articles in the fastest, but also most efficient and secure way to our customers.