Pipeline Inspection and Health Monitoring Technology
Hongfang Lu|Zhao-Dong Xu|Tom Iseley|Haoyan Peng|Lingdi Fu
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Covers pipeline inspection, monitoring, big data, and artificial intelligenceProvides comprehensively the practical examples in engineeringIntroduces application of big data and artificial intelligence in pipeline inspection and health moni.
Seller Inventory # 693976641
This book includes six chapters aiming to introduce global pipeline inspection and health monitoring technologies comprehensively. The pipeline is the blood vessel of the energy system and a vital lifeline project. After many years of service, the pipeline gradually enters the aging stage. Pipeline inspection and health monitoring can effectively reduce the failure and accident risks of the pipeline, and it is conducive to integrity management. Through case analysis, practitioners can have a deeper understanding of the application of related technologies.
Dr. Hongfang Lu is an associate professor at Southeast University. He has over ten years of experience in trenchless repair, health monitoring, and evaluation of underground pipelines. He received his bachelor's and master's degrees from Southwest Petroleum University in 2013 and 2016, respectively, and a doctor's degree from Louisiana Tech University in 2020. He has published more than 40 academic papers in journals such as J. Pipeline Syst. Eng.-ASCE and J. Perform. Constr. Fac.-ASCE, and four papers are included in the ESI Highly Cited Papers. He currently chairs three projects related to trenchless repair and assessment of pipelines. Dr. Lu served as the Chair of Oil and Gas Committee of BAMI-I (Buried Asset Management Institute-International). He served as a young editorial board member in Natural Gas Industry (1000-0976) and Oil & Gas Storage and Transportation (ISSN: 1000-8241). He also served as a committee member of the Youth Work Department of the Petroleum Storage& Transportation Committee of Chinese Petroleum Society. In 2018 and 2020, he received the NASSCO Jeffrey D. Ralston Memorial Scholarship. In 2020, he was selected as a "Star of the Youth" of the Chinese Society for Trenchless Technology (CSTT). In 2021, he won the first prize in the innovation and entrepreneurship competition (field of new materials) of Jiangsu Province.
Dr. Zhao-Dong Xu is a professor at Southeast University, a national outstanding youth, and a Changjiang scholar. He has long been engaged in research on structural seismic and multi-hazard coupling disaster prevention, structural vibration control and safety monitoring, big data processing, and disaster deduction. He has published more than 300 papers in international authoritative journals. He has published five monographs and 140 patents. He served as a fellow of the International Society for Disaster Prevention and Control, an executive director of the Chinese Society of Vibration Engineering,the director of the Structural Dynamics Professional Committee of the Chinese Society of Vibration Engineering, and the deputy director of the Engineering and Technology Committee of the National Science and Technology Innovation Alliance.
Dr. Tom Iseley is a professor at Purdue University. He has over 40 years of experience in the planning, design, and construction of underground infrastructure systems. From 1982, he served on the faculty of Mississippi State University, Purdue University, Indiana University–Purdue University Indianapolis, and Louisiana Tech University. During the past 40 years, he has maintained an international leadership position in trenchless technology. In April 2015, Dr. Iseley was selected as a Distinguished Member of the American Society of Civil Engineers (ASCE) for his eminence in pipeline engineering, becoming just one of only 637 Distinguished Members ever selected by the ASCE. He was also selected as the 2016 UCTA MVP (Most Valuable Professional) by the Underground Construction Technology Association (UCTA) and Underground Construction magazine. Dr. Iseley was inducted into the 2017 NASTT Hall of Fame. He received the Centre for Advancement of Trenchless Technologies (CATT) Award of Excellence on October 9, 2019.
Haoyan Peng is a master student of Southeast University. He graduated from Hefei University of Technology in 2021. After entering Southeast University, he engaged in research on pipeline health monitoring and machine learning. He has published papers in international authoritative journals.
Lingdi Fu is an engineer of PetroChina Southwest Oil & Gasfield Company. She graduated from Southwest Petroleum University with a master's degree at 2018. In recent years, she has engaged in research related to oil and gas storage and transportation engineering, safety engineering, and pipeline mechanics. She has participated in more than ten provincial and ministerial scientific research projects and published 12 articles in authoritative journals.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | US$ 57.13 | US$ 57.13 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.