Post-Project Monitoring of BMPs/SUDS to Determine Performance and Whole-Life Costs (Phase 2) (Paperback)
Language: English
Published by IWA Publishing, London, 2007
- Softcover
- New

Seller: AussieBookSeller, Truganina, VIC, AustraliaAussieBookSeller
AbeBooks seller since June 22, 2007
Condition: New
US$ 507.73
Quantity: 1 available
Add to basketItem description from seller
Paperback. The objectives of this project are to document the performance and whole-life costs of Best Management Practices (BMPs) and Sustainable Urban Drainage Systems (SUDS). These two terms refer to stormwater practices implemented in the U.S. and UK to reduce the impact of urbanization. The study was undertaken for a number of reasons, including: The lack of data on operational performance (in connection with both water quantity and quality management)A need to better understand future financial liabilities associated with the widespread adoption of these facilities The need to improve confidence in BMPs/SUDS techniques to facilitate appropriate regulation and adoption. The BMPs/SUDS selected for evaluation in this study include retention ponds, extended detention basins, vegetated swales, bioretention, porous pavements, and various infiltration practices. A whole-life cost model was developed in a spreadsheet framework to allow calculation of the expected cost of a facility based on drainage area, maintenance expectations, and other factors. Separate models were developed for five of the selected systems. The default values for many model parameters were extracted from the information gained in the survey of systems in the U.S. and UK. Shipping may be from our Sydney, NSW warehouse or from our UK or US warehouse, depending on stock availability.…
Seller Inventory # 9781843397434
- Title
- Post-Project Monitoring of BMPs/SUDS to Determine Performance and Whole-Life Costs (Phase 2) (Paperback)
- Author
- L.K. Lampe
- Publisher
- IWA Publishing, London
- Publication year
- 2007
- Condition
- new
- Binding
- Paperback
- Language
- English
- ISBN 10
- 1843397439
- ISBN 13
- 9781843397434
- The lack of data on operational performance (in connection with both water quantity and quality management)
- A need to better understand future financial liabilities associated with the widespread adoption of these facilities
- The need to improve confidence in BMPs/SUDS techniques to facilitate appropriate regulation and adoption.
"Synopsis" may belong to another edition of this title.
AussieBookSeller
Truganina, VIC, Australia
AbeBooks seller since June 22, 2007
Shipping rates from Australia to U.S.A.
| Item | 25 to 45 business days | 8 to 14 business days |
|---|---|---|
| First item | US$ 37.00 | US$ 44.00 |
Payment methods
Seller's business information
The Nile Group Pty Ltd
42 Apex Drive
Truganina, VIC Australia 3029
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days.
Shipping terms
Please note that titles are dispatched from our UK and NZ warehouse. Delivery times specified in shipping terms. Orders ship within 2 business days. Delivery to your door then takes 8-15 days.