Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs

Language: English

Published by IWA Publishing, GB, 2004

1843397161 / 9781843397168

  • Softcover
  • New
See all details

Seller: Rarewaves.com USA, London, London, United KingdomRarewaves.com USA

5-star seller

AbeBooks seller since June 11, 2025

Softcover

Condition: New

US$ 212.94

 Free Shipping 
Ships from United Kingdom to U.S.A.

Quantity: 4 available

Add to basket
Free 30-day returns

Item description from seller

Over the past 20 years, the use of Best Management Practices (BMPs) in the United States has been instrumental in reducing both the detrimental impacts to receiving water quality and the exacerbated flooding caused by urbanization and storm water drainage. More recently, Sustainable Urban Drainage Systems (SUDS) have started to be used in the United Kingdom. Both SUDS and BMPs attempt to mimic the drainage patterns of the natural watershed, and can also provide a degree of treatment needed to improve the quality of the water discharged to an acceptable level. The costs of conventional stormwater collection systems are determined primarily in terms of initial capital expenditure. Long-term maintenance costs are absorbed by stormwater authorities that are responsible for maintaining their infrastructure as part of their "asset base". Currently, only a few of these responsibilities exist for BMPs and SUDS, which generally incorporate surface components and are often dependent on landscaping rather than on traditional construction techniques, but may require significant regular maintenance. Any potential adopting organization will require guidance on the maintenance regimes of different types of systems and how such regimes translate into long-term adoption costs. The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the US and UK to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance. As part of Phase 2, the operation of selected BMPs and SUDS will be monitored over a one-year period in terms of pollutant removal and hydrologic/hydraulic efficiency, and applicability of their design criteria and maintenance regime. The protocols developed in Phase 1 will be used to assess BMPs/SUDS performance and whole-life costs.…

Seller Inventory # LU-9781843397168

Title
Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs
Author
L. K. Lampe
Publisher
IWA Publishing, GB
Publication year
2004
Condition
New
Binding
Paperback
Language
English
ISBN 10
1843397161
ISBN 13
9781843397168

Rarewaves.com USA

London, London, United Kingdom

5-star seller

AbeBooks seller since June 11, 2025

Shipping rates from United Kingdom to U.S.A.

Item7 to 12 business days7 to 12 business days
First itemUS$ 0.00US$ 0.00
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.

Payment methods

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay

Seller's business information

RAREWAVES.COM LIMITED

Elsley Court, 20-22 Great Titchfield Street
London, United Kingdom W1W 8BE