Powders and Solids: Developments in Handling and Processing Technologies
Language: English
Published by Royal Society of Chemistry, 2001
- Hardcover
- New

Condition: New
US$ 132.35
Quantity: Over 20 available
Add to basketItem description from seller
This book will be essential reading for all industrial practitioners and all engineers working either in industry or research on processes involving solid and powder handling.InhaltsverzeichnisHealth, Safety and Handling: The Evolvem.
Seller Inventory # 595098323
- Title
- Powders and Solids: Developments in Handling and Processing Technologies
- Author
- Hoyle, W.
- Publisher
- Royal Society of Chemistry
- Publication year
- 2001
- Condition
- New
- Binding
- Gebunden
- Language
- English
- ISBN 10
- 0854048014
- ISBN 13
- 9780854048014
The chemical industry processes a high proportion of its products in powder form, thus making the efficient, effective and safe handling and processing of powders of prime importance. Powders and Solids: Developments in Handling and Processing Technologies brings the reader right up-to-date with both newly-introduced commercial practices and results of recent fundamental research on the behaviour of model powders. Case studies are also included. Commencing with an overview of developments in the health and safety aspects of handling powders, the book then goes on to look at the new technologies being applied to powders and powder handling, followed by aspects of measurement and control in powder handling. It will be essential reading for all industrial practitioners, particularly those in the pharmaceutical industry, as well as all engineers working either in industry or research on processes involving solid and powder handling.
"Synopsis" may belong to another edition of this title.
Excerpt. © Reprinted by permission. All rights reserved.
Powders and Solids
Developments in Handling and Processing Technologies
By W. HoyleThe Royal Society of Chemistry
All rights reserved.
Contents
Health, Safety and Handling,
The Evolvement of Solids Handling Technology Lyn Bates, 3,
Explosion Hazards in Powder Handling and Processing: The Changes Ahead Pieter Zeeuwen, 11,
Practical Solutions to Critical Solids Handling Problems P. Cooper, 29,
New Developments in the Containment of Pharmaceutical Powders Martyn Ryder, 42,
New Technologies,
Powder Products and Structure John Dodds, 57,
Granular Powders and Solids: Insights from Numerical Simulations M. Ghadiri, S. J. Antony, R. Moreno and Z. Ning, 70,
Flow Aid Technology N. Harnby, 82,
Measurement and Control,
Wheat Flour Milling: A Case Study in Processing of Particulate Foods Grant M. Campbell, Chaoying Fang, Philip J. Bunn, Andrew Gibson, Frank Thompson and Arthur Haigh, 95,
Experimental Observations of Powder Consolidation A. de Ryck, 112,
Process and Powder Handling Improvements Resulting from Particle Emission Measurement and Powder Mass Flow Monitoring using Electrodynamic Technology: A Case Study William Averdieck, 120,
Subject Index, 128,
CHAPTER 1
Health, Safety and Handling
THE EVOLVEMENT OF SOLIDS HANDLING TECHNOLOGY
Lyn Bates
Ajax Equipment Ltd
Milton Works Mule
Street Bolton BL2 2AR
1 INTRODUCTION
Solids Handling Technology is a multi-discipline science, with roots in civil and mechanical engineering, with stimulus from structural and chemical engineering. Its emergence as a single, comprehensive field of study followed a long gestation period in soil mechanics and a belated recognition in the bulk handling industry that particulate solids represented a fourth state of matter. The technology combines features from liquids, solids and gases, but embraces infinitely greater variation due to the interaction of a host of factors. The effect of mechanical, chemical, thermal, electrostatic and molecular features in a two or three phase media brings in further complications and the situation is made even more complex by the influence of scale, ambient conditions, industrial equipment factors and operating sequences. No wonder that the accumulation of technical knowledge took a long time to mature in order to bring a coherent structure to the subject. Any attack on a subject of this complexity must involve simplifying assumptions. Treating the media as a continuum is appropriate under certain conditions and this step allowed advances to be made.
2 HISTORY
Bulk solids have been handled and stored for thousands of years. One famous engineer from ancient times, Archimedes, calculated the number of grains of sand that would fill the then known universe as 1051, displaying a basic understanding of the packing characteristics of bulk solids. His perception of density being mass divided by displacement, regardless of container shape, is also applicable to particulate solids and their variable voidage condition.
His invention of using helical screws to pump water evolved to ubiquitous applications for handling of bulk solids. Evidence of grain stores in Babylon, ancient Egypt and through the Roman Empire show that relative large volumes of bulk materials have been shipped, stored and handled from antiquity. However, it is only in recent times, with the growth of cities and the industrial revolution, that concentrations of a wide range of loose solids have been held in large gravity flow structures other than by manual handling. Whereas grain is comparatively free flowing, many other mineral and processed products display difficult flow and handling characteristics. Solids handling remains a mature industry with an immature technology.
Modern solids handling technology has its roots in soil mechanics. The stability of bridges, buildings, earthworks, dams and military fortifications has attracted the attention of engineers for centuries. The work of Coulomb and Rankine on friction and Reynolds, who observed the dilatancy effects on sand during deformation are especially relevant to bulk solids flow. The one and only known paper of an obscure German engineer in Hamburg in 1895 was a landmark in solids handling technology, developing a theory to explain the findings of an English engineer, Isaacs Roberts of the effect of wall friction on silo wall pressures. By way of wood and glass models and simple calculus Janssen developed a theory of pressure distribution in grain silos that remains today the most widely used method of assessing forces on silo walls. One might question how many papers published in this year of high technology, will be widely quoted a hundred years from now?
The maturity of centuries of bulk technology progressed at a snail pace over the first half of the next century. Verification and refinements to Janssen followed, mainly being concerned with structural aspects of silo construction. Airy, Prante Toltz, Ketchum, Jamieson, Lufft, Pliessner, Bovey and many others, constructing experiments and calculations. Interestingly, the findings of Janssen were re-discovered by Shaxby in a joint paper with Evans, during experiments with powders. Hvorslev, examining the stability of cohesive soils, introduced the important concept of 'critical state' to the study of the failure characteristics of bulk material. He showed the peak stress at failure to be a function of the effective normal stress and the void ratio, and independent of the stress history of the material. The void ratio has a direct correlation with bulk density and hence provides a basis for specifying the fundamental strength potential of a compact. This concept is particularly important to an understanding of the mechanism of consolidation and flow of solids. Meanwhile, the concentration of industry, increase in the scale of production, and growing automation, highlighted the shortfall in progress in solids handling technology. The growth of mess and pollution, a thriving 'flow aids' industry and the increasing number and scale of silo failures reported by Theimer all pointed to remaining deficiencies in the technology.
3 THE BREAK THROUGH
By a quirk of history a young, Polish army officer stood on a hill in 1939, with Germans advancing up one side and Russian forces up the other. It was time to pack up fighting and seek refuge in England. Andrew Jenike studied for his engineering degree in London after the war and later settled in America, working for US steel. He decided to examine a range of industrial problems and collected all the information available on about thirty subjects, collecting all the information in separate boxes that he rooted through systematically. One day he suddenly made the crucial decision that the flow of solids was one of the most important problems of the day and, being a man of very positive action, immediately scrapped all the boxes of papers collected on other topics. He approached various universities before agreeing with Utah University to research on bulk solids flow for one dollar per year.
This must have been the best scientific bargain of the century. With the aid of a young student named Jerry Johanson they developed a theory, powder property measuring instrument and design methodology that offered a solution to the age old problem of designing a silo that would guarantee the reliable discharge of non-free flowing materials. His knowledge of Russian was fortunate in that he came across a publication by a little known engineer called Sokolovskii, that provided the key mathematical tool for analyzing converging flow of a plastic medium. His classical Utah Engineering Experimental Station thesis' published in 1964, burst upon the academic world and suddenly changed the subject of bulk solids from a black art to a respectable topic of study. The influence of charge and discharge sequences, definitive flow patterns, transient and switch stresses all fell into an understandable and predictable structure. Problems of handling loose solids, long the scourge of industry, appeared to be banished to history.
Australia instituted a combined attack on solving bulk solids storage and handling problems with the Universities of New South Wales at Sydney, Newcastle and Wollongong combining to form a centre of Bulk Solids excellence. Through the prolific words and deeds of Alan Roberts and Peter Arnold they made a strong contribution to performance of the Continent's large-scale iron and steel export industry, and spread the word internationally. Robert, Arnold and Mclean's publication of a more intelligible interpretation of Jenike's work, put the theory within reach of industry.
4 THE GOLDEN YEARS
In the UK in the late 60's this science formed a part of Harold Wilson's 'White Heat of technology' that was going to transform British industry. The work of Roscoe, Schofield and Wroth on critical state soil mechanics at Cambridge University' fell into place. The Government set up Warren Spring Laboratories, with a major section under Dr. Fred Valentin devoted to bulk technology development. Bradford University formed a School of Powder Technology, headed Dr. John Willams. Prof. Scarlet formed a School of Particle Technology at Loughborough University. The exciting days of theory, testing and development flowed fast and furious. Devices were designed at Warren Spring Laboratories for measuring the tensile and cohesive strength of compacted bulk materials and they conducted much research into powder and paste behavior. The use of injected air for powder state control in flow was put on a scientific basis and the work broadened into investigating various forms of solids handling equipment. Walker, at the South East Electricity Generating Board developed the more user friendly Annular Shear Cell and supporting theory, and Williams and Birks introduced the Unconfined Failure Tester, surely the ultimate tool for measuring arching potential.
The inter-disciplinary nature of the field of bulk solids was firmly established when Abraham Goldburg organised the first PowTech exhibition, which was quickly followed by a proliferation of similar events in UK and internationally. Specialised trade journals for the bulk solids industry were started, and more continue to be introduced. These stirrings of a coherent industrial discipline have steadily strengthened through the formation of the trade organisation SHAPA, (Solids Handling and Processing Association), which now has 100 members selling equipment to this market.
The British Materials Handling Board was set up by the government to assist the co-ordination of research into powder technology and aid the dissemination of information. Despite sterling work by its secretary Peter Middleton in organising meetings, and publishing reports and books, with limited resources it was only able to scrape the surface of the task. Relative to the scale of the industrial importance of bulk solids, the number of universities and research establishments involved throughout the world has always been surprisingly small, even though their contributions has been very significant.
5 THE STRUGGLE TO APPLY THE TECHNOLOGY
Somehow, however, British Industry never secured the extent of benefits expected. These truly golden years of promise for powder technology are not as yet fulfilled. As a 'new' subject in a consolidated form across all industries, the scale of the training problem was immense and never caught up with the backlog. Bulk technology remained a little taught subject in the syllabus of either mechanical or chemical engineering degree courses, tending to fall between the two stools of the mechanical and chemical engineering professions. This is despite the fact that over half of all the products used or consumed by humans are at some stage in a particulate form and are handled many times from source to use.
Many groups previously active have retracted or become extinct. The School of Powder technology at Bradford University was assimilated into the Chemical Engineering department with the retirement of Williams. The Loughborough School of Particle Technology never reached the same heights when Scarlet departed to Delft. The initial Government backing faded as the 'breakthrough' of efficiency was sluggish, culminating in Michael Heseltine selling the Warren Spring Laboratory site for a car park. This situation partially explains the sad reading of the Rand reports on the lack of improvement in the solids handling industries from the 1960's onwards. The dismal record of efficiencies in plants that handle loose solids is compared with industries that handle gasses and liquids. The real reason for the lack of technical progress is that powder technology is a vast subject, greatly complicated by the host of interacting variables that influence the behavior of a mass of particulate solids.
The equipment and operator sensitivity of the apparatus, the time consuming process and the expertise needed to interpret the results of the Jenike method tended to confine application to major installations. It did not help that the theory was complex and written in a style difficult to understand. The academic world pursued even more complicated mechanical devices to reflect 'true' shear conditions, as the basic theory was considered solved, taking the subject further from widespread industrial utility. It took about ten years to develop a written procedure and provide a reference test material to give a basis for achieving consistent results, and it is still a very dubious question as to whether that objective has been achieved. No wonder that the technology virtually ground to a halt, with limited shining exceptions such as at British Steel under Herbert Wilkinson and Harold Wright. The technique remains the only internationally recognised method of establishing the critical arching dimension of a bulk material in a mass flow silo to determine a 'safe' outlet size. As an example of the slow progress in the industry, the adoption of the Jenike method as a standard for ASTM in the USA, the country of its origin, has only finally gained approval during 2000.
The greatest shortcoming in the promotion of the technology was that it was in few people's interest to publicise that the value of wall friction is arguably the most important feature for design requirements. This is a simple measurement to secure. Neither was it widely promoted that static stresses are crucially important to problems of initiating flow, as emphasis on dynamic stresses for flow channel analysis tended to dominate theoretical considerations. The pragmatic requirements of industry came a poor second to the intellectual challenge of understanding the failure complexities of particulate solids in different stress conditions.
J. Schwedes, Brian Scarlet, and Geisle Enstad of TelTech in Norway, separately sought the Holy Grail of powder testing through the development of elaborate bi-axial test devices. Peichel and Schultz market versions of an annular shear tester for automatic conduction of shear tests. Michael Rotter, at Edinburgh University re-invented the Uni-axial tester for coal applications, countering the wall friction problem by double-ended compaction in the preparation cylinder by use of an elastic support for the walls. Alan Roberts in Australia and Andy Matchett of Teeside University have studied the effect of vibration on wall friction. An approach to the failure properties of cohesive powders has been made by Molerus in the light of fluid dynamics and Enstad has proposed a new theory of arching in mass flow hoppers. Chris Thornton at Aston University is pursuing the interaction of hundreds of thousands of particles in two dimensions, by means of computer simulations. The task of replicating this analysis in three dimensions is many orders of magnitude more difficult, As a spoonful of micron size particles contains in the region of 5,000,000,000 particles, and individual interactions are significantly more complicated than the simple models used, realistic replication of bulk material behavior on these lines may be expected to lie far in the future.
6 WHERE DOES THAT LEAVE US TODAY IN TERMS OF SOLVING CURRENT PROBLEMS?
Researchers are using powerful and sophisticated techniques, such as positron tracking, Discrete Element Modelling (DEM) simulation, mathematical models and finite element analysis, to examine the behaviour of loose solids. In the UK two major bulk solids centres, based respectively at Greenwich University and the Glasgow Caledonian University, provide consultation service and training for industry. Teeside, Cambridge, Surrey, Edinburgh, Birmingham, Bristol, Bath, and a few other Universities have sections active in different areas of bulk technology.
Jerry Johanson is back on the scene with a set of instruments to measure wall friction, bulk porosity and a form of shear strength. This latter device is presented with limited underlying theory and hence is not intellectually acceptable to the scientific community. His vast experience has brought him to the conclusion that the Jenike method is not appropriate to industry and a simpler approach is needed. This form of 'vertical shear cell' has been used by the author for some years as a simple tool to measure static failure conditions of a uni-axially loaded compact, a formation and failure condition reflecting incipient collapse over an opening in a non-mass flow container. An elementary comparison of the mass stimulating shear against the strength opposing failure leads to the prediction of a critical size of opening at which self weight collapse will take place. Not an elegant solution, but a conservative guide to the size of outlet needed to commence flow compared with a situation of wall slip and of re-developing flow after a dynamic stress field has been established. A wall friction device and this tool suffice to address many solids handling problems
(Continues...)
Excerpted from Powders and Solids by W. Hoyle. Copyright © 2001 The Royal Society of Chemistry. Excerpted by permission of The Royal Society of Chemistry.
All rights reserved. No part of this excerpt may be reproduced or reprinted without permission in writing from the publisher.
Excerpts are provided by Dial-A-Book Inc. solely for the personal use of visitors to this web site.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | US$ 55.00 | US$ 55.00 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
-
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
-
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
-
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Engberdingdamm 27, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
-
To Moluna GmbH, Münsterstr. 105, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
-
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service () -
Ordered on ()/ received on ()
-
Name of the consumer(s)
-
Address of the consumer(s)
-
Signature of the consumer(s) (only in case of a notification on paper)
-
Date
(*) Cross out the incorrect option.
Standard Business Terms and customer information / data protection declaration
I. Standard business terms
§ 1 Basic provisions
(1) The following terms and conditions of business apply for all contracts concluded with us as the supplier (Moluna GmbH) via the websites AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of your own terms and conditions is explicitly rejected.
(2) A ‘consumer’ in the sense of the following regulations is every natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities. The term ‘businessman’ refers to every natural person, legal person or legally responsible partnership that concludes a legal transaction in pursuance of his/its independent professional or commercial activity.
§ 2 Conclusion of the contract
(1) The subject-matter of the contract is the selling of products .
(2) If an article is placed by us with AbeBooks or ZVAB, the activation of the page on AbeBooks or ZVAB shall involve the binding offer to conclude a contract under the terms and conditions contained in the article page.
(3) The contract shall become effective via the online shopping cart system as follows:
The products intended for purchase are moved to the "shopping cart". You can select the "Shopping Cart" using the appropriate buttons on the navigation bar and make changes there at any time.
After calling up the “Checkout” page and entering the required personal data and payment and shipping conditions, all order information is then displayed again on the order summary page.
Before submitting the order, you have the ability once more to review or change any information here (you may also use the "back" button on the Internet browser), or to cancel the purchase.
By clicking the “Buy now” button to submit the order, you declare your legally binding acceptance of the order which makes the contract effective.
(4) The execution of the order and the sending of all the details necessitated by the conclusion of the contract take place via e-mail, in a partially-automated manner. Consequently, you have to ensure that the e-mail address that you have deposited with us is the correct one, and that the receipt of the respective e-mails is guaranteed. In particular, you have to ensure that the respective e-mails are not blocked by a SPAM filter.
§ 3 Right of retention, reservation of proprietary rights
(1) You can only exercise a right of retention if the situation in question involves claims arising from the same contractual relationship.
(2) The goods remain our property until the purchase price is paid in full.
(3) If you are a businessman, the following conditions also apply:
a) We retain ownership of the goods until all the claims arising from the ongoing business relationship have been settled in full. The goods subject to retention of title may not be pledged or transferred by way of security before ownership of the said goods changes hands.
b) You can re-sell the goods within the framework of an orderly transaction. In this regard, you hereby cede all the claims amounting to the magnitude of the billing amount that accrue to you as a result of the re-selling operation to us, and we accept the cession. Furthermore, you are authorised to collect the claim in question. However, insofar as you do not discharge your payment obligations in an orderly fashion, we reserve the right to collect the claim ourselves.
c) In a situation involving the combination and amalgamation of the goods subject to retention of title, we acquire co-ownership of the newly-formed item. This co-ownership corresponds to the ratio that exists between the invoice value of the goods subject to retention of title and the other processed items at the time of processing.
d) If you make a request of this nature, we shall be obligated to release the securities that are due to us, to the extent that the realisable value of our securities exceeds the claim to be secured by more than 10%. We are responsible for selecting the securities to be released.
§ 4 Warranty
(1) The statutory warranty rights are applicable.
(2) As a consumer, you are requested to promptly check the product for completeness, visible defects and transport damage as soon as it is delivered, and promptly disclose your complaints to us and the shipping company in writing. Even if you do not comply with this request, it shall have no effect on your legal warranty claims.
(3) If a characteristic of the goods deviates from the objective requirements, the deviation shall only be deemed to be agreed if you were informed of the same by us before submitting the contractual declaration and the deviation was expressly and separately agreed between the contracting parties.
(4)
Insofar as you are an entrepreneur, the following shall apply in deviation from the above warranty provisions:
a) Only our own specifications and the manufacturer's product description shall be deemed agreed as the quality of the goods, but not other advertising, public promotions and statements by the manufacturer.
b) In the event of defects, we shall, at our discretion, provide warranty by rectification of the defect or subsequent delivery. If the rectification of defects fails, you may, at your option, demand a reduction in price or withdraw from the contract. The rectification of defects shall be deemed to have failed after a second unsuccessful attempt, unless the nature of the goods or the defect or other circumstances indicate otherwise. In the event of rectification of defects, we shall not be obliged to bear the increased costs arising from the transport of the goods to a place other than the place of performance, unless such transport is in accordance with the intended use of the goods.
c) The warranty period shall be one year from delivery of the goods. The shortening of the period shall not apply
- for culpable damage attributable to us arising from injury to life, limb or health and for other damage caused intentionally or by gross negligence;
- insofar as we have fraudulently concealed the defect or have assumed a guarantee for the quality of the item;
- in the case of items which have been used for a building in accordance with their customary use and have caused its defectiveness;
- in the case of statutory rights of recourse that you may assert against us in connection with rights arising from defects.
§ 5 Choice of law, place of fulfilment, jurisdiction
(1) German law shall apply. This choice of law only applies to customers if it does not result in the revocation of the protection guaranteed by the mandatory provisions of the law of the country in which the respective customer’s usual place of residence is located (benefit-of-the-doubt principle).
(2) If you are not a consumer, but a businessman, a legal entity under public law or an institutional fund governed by public law, our place of business is the place of jurisdiction as well as the place of fulfilment for all services that follow from the business relationships that exist with us. The same condition applies to situations in which you are not associated with a general place of jurisdiction in Germany or the EU, as well as situations in which the place of residence or the usual place of residence is not known at the time of commencement of proceedings. This has no bearing on the capacity to call upon the court associated with another place of jurisdiction.
(3) The provisions of the UN Convention on Contracts for the International Sale of Goods are explicitly inapplicable.
II. Customer information
- Identity of the seller
Moluna GmbH
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
E-Mail: abe@moluna.de
- Information regarding the conclusion of the contract
The technical steps associated with the conclusion of the contract, the contract conclusion itself and the correction options are executed in accordance to the regulations "conclusion of the contract" in our standard business terms (part I.).
- Contractual language, saving the text of the contract
3.1 Contract language shall be English.
3.2 The complete text of the contract is not saved with us. Before the order is sent, the contract data can be printed out or electronically saved using the browser’s print function. After the order is received by us, the order data, the legally-mandated details related to distance selling contracts and the standard business terms are re-sent to you via e-mail.
- Main features of the product or service
The key features of the goods and/or services can be found in the respective quote.
- Prices and payment arrangements
5.1 The prices mentioned in the respective offers represent total prices, as do the shipping costs. They include all the price components, including all the incidental taxes.
5.2 The dispatch costs that are incurred are not included in the purchase price. They can be viewed by clicking the appropriate button on our website or in the respective quote, are shown separately over the course of the order transaction and must additionally be borne by you, insofar as free delivery is not confirmed.
5.3 The payment methods that are available to you are shown by clicking the appropriate button on our website or are disclosed in the respective quote.
5.4 Unless otherwise specified for the respective payment methods, the payment claims arising from the contract that has been concluded become payable immediately.
- Delivery conditions
6.1 The delivery conditions, delivery date and existing supply restrictions, if applicable, can be found by clicking the appropriate button on our website or in the respective quote.
Unless a different period is specified in the item description or our delivery conditions, the goods are delivered within 3-5 days after the conclusion of the contract (in case an advance payment has been agreed upon, after the payment authorisation).
6.2 If you are a consumer, the following is statutorily regulated: The risk of the sold item accidentally being destroyed or degraded during shipping only passes over to you when the item in question is delivered, regardless of whether or not the shipping operation is insured. This condition does not apply if you have independently commissioned a transport company that has not been specified by us or a person who has otherwise been appointed to execute the shipping operation.
If you are a businessman, the delivery and shipping operations take place at your own risk.
- Statutory warranty right
Liability for defects is governed by the “Warranty” provisions in our General Terms and Conditions of Business (Part I).
last update: 01.01.2022
Data protection declaration
Unless stated otherwise below, the provision of your personal data is neither legally nor contractually obligatory, nor required for conclusion of a contract. You are not obliged to provide your data. Not providing it will have no consequences. This only applies as long as the processing procedures below do not state otherwise.
“Personal data” is any information relating to an identified or identifiable natural person.
Responsible person
Contact us at any time. The contact details of the person responsible for data processing can be found in our legal notice.
Collection, processing, and transfer of personal data in orders
When you submit an order we only collect and use your personal data insofar as this is necessary for the fulfilment and handling of your order as well as processing of your queries. The provision of data is necessary for conclusion of a contract. Failure to provide it will prevent the conclusion of any contract. The processing will occur on the basis of Article 6(1) b) GDPR and is required for the fulfilment of a contract with you.
Your data is transferred here for example to the shipping companies and dropshipping providers, payment service providers, service providers for handling the order and IT service providers that you have selected. We will comply strictly with legal requirements in every case. The scope of data transmission is restricted to a minimum.
Duration of storage
After contractual processing has been completed, the data is initially stored for the duration of the warranty period, then in accordance with the retention periods prescribed by law, especially tax and commercial law, and then deleted after the period has elapsed, unless you have agreed to further processing and use.
Rights of the affected person
If the legal requirements are fulfilled, you have the following rights according to art. 15 to 20 GDPR: Right to information, correction, deletion, restriction of processing, data portability. You also have a right of objection against processing based on art. 6 (1) GDPR, and to processing for the purposes of direct marketing, according to art. 21 (1) GDPR.
Right to complain to the regulatory authority
You have the right to complain to the regulatory authority according to art. 77 GDPR if you believe that your data is not being processed legally.
Right to object
If the data processing outlined here is based on our legitimate interests in accordance with Article 6(1)f) GDPR, you have the right for reasons arising from your particular situation to object at any time to the processing of your data with future effect.
If the objection is successful, we will no longer process the personal data, unless we can demonstrate compelling legitimate grounds for the processing that outweigh your interests or rights and freedoms, or the processing is intended for the assertion, exercise or defence of legal claims.
last update: 10.01.2022