Power System Assets
Book 7 of 10: CIGRE Green BooksNew - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketThis CIGRE Green Book describes the state-of-the-art of power Systems asset management dealing with all aspects asset management practice. The major focus of the book is on documenting practical methods that bridge the gap between just satisfying an asset management process and achieving real asset management results in the form of smarter investment decisions.
The book facilitates collaboration and blending of the engineering and technical aspects of asset management and the financial considerations needed to support asset investment decisions using risk-based business case analysis. Detailed case studies are included to illustrate generic and specific or customized methods and to demonstrate the application of such methods from the technology perspectives of several CIGRE study committees.
This practical guide is suitable for working asset managers and decision-makers (both engineering and financial) dealing with all aspects of the practice of asset management.The scope of Cigré Study Committee C1 is to study Economics and system analysis methods for the development of power systems: methods and tools for steady state and dynamic analysis, planning issues and methods in various contexts, asset management strategies, in order to support electricity system planners worldwide to anticipate and successfully manage system changes to address the arising needs, opportunities and uncertainties while respecting multiple constraints.
Dr. Graeme Ancell has worked in the electric utility sector for approximately three decades. Graeme is the owner of Ancell Consulting Limited, a company providing services to the electricity industry in New Zealand and internationally since 2015. He was the convenor of two C1 working groups and is a member of Study Committee C1..
Dr. Gary L. Ford has worked for Ontario Hydro and in the utility sector for more than four decades, Dr. Ford and two colleagues founded PowerNexAssociates Inc., which provides technical consulting services to electric utilities in the area of asset management, procurement, and decision support. Since 1981, his CIGRE experience includes active participation in working groups 23.02, B3.12, C1.1, C1.16, C1.25, C1.38, B3.38, and D1.39, and most recently as Lead Editor for this Green Book
Mr. Earl S. Hill has worked as an independent consultant to the electric utility industry for the past 30 years. He is the co-author of three EPRI publications on RCM and asset management. Mr. Hill has participated in CIGRE WG C1.25, WG C1.34, and currently WG C1.43. Mr. Hill has assisted in the implementation of maintenance improvement efforts for dozens of utilities, on every continent save Antarctica.
Ms. Jody Levine has worked approximately three decades with the former Ontario Hydro and derivative companies. After spending several years as an operational asset manager for station equipment, she currently manages a group of field support consultants for maintenance of transmission stations. She has been active in CIGRE B1.60 and C1.43, and is chair of IEEE 400.3.
Mr. Christopher Reali is employed at the Independent Electricity System Operator (Ontario, Canada) in the role of Engineering Manager, Transmission Planning. Christopher has over a decade of experience in system planning. Christopher is active in NPCC, NERC, and CIGRE working groups. He is the Canadian national representative on SC C1.
Mr. Gérald Sanchis has been in the transmission business for over three decades, holding various positions in management and in technical fields within RTE and EDF group in France and Germany. He was deeply involved in ENTSO-E, for system development, R&D domains, and as support to the president of the association. He is a distinguished member of CIGRE and present convenor of C1.44, addressing the global grid issue. He was the coordinator of the R&D European project e-Highway 2050.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | US$ 56.90 | US$ 56.90 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.