Proceedings of 2024 International Conference on Smart Electrical Grid and Renewable Energy (SEGRE 2024) | Volume 2
Language: English
Published by Springer, 2026
- Softcover
- New

Seller: preigu, Osnabrück, Germanypreigu
AbeBooks seller since August 5, 2024
Condition: New
US$ 253.74
Quantity: 5 available
Add to basketItem description from seller
Seller Inventory # 135769851
- Title
- Proceedings of 2024 International Conference on Smart Electrical Grid and Renewable Energy (SEGRE 2024) | Volume 2
- Author
- Fushuan Wen (u. a.)
- Publisher
- Springer
- Publication year
- 2026
- Condition
- Neu
- Binding
- Taschenbuch
- Language
- English
- ISBN 10
- 981961967X
- ISBN 13
- 9789819619672
- Item weight
- 1,218 grams
- Dimensions
- 235 x 155 x 44 mm
- Seller catalogs
- Bücher
The proceedings presents a comprehensive collection of carefully selected papers from the 2nd International Conference on Smart Electrical Grid and Renewable Energy (SEGRE 2024). With a strong emphasis on electrical engineering, smart grid technology, and green technology, this work serves as a valuable resource for researchers, experts, professionals, and practitioners in the fields of electrical grids and renewable energy. The conference aims to create knowledge exchange, where participants can present their cutting-edge research findings, showcase their latest research project outcomes, and engage in insightful discussions to share their views and experiences.
"Synopsis" may belong to another edition of this title.
About the Author
Fushuan Wen (Fellow, IEEE) received the B.E. and M.E. degrees from Tianjin University, Tianjin, China, in 1985 and 1988, respectively, and the Ph.D. degree from Zhejiang University, Hangzhou, China, in 1991, all in electrical engineering. He joined Zhejiang University as a Faculty Member in the School of Electrical Engineering in 1991, where he has been a Full Professor since 1997; he has also been a Full Professor with the Hainan Institute, Zhejiang University since 2022. He is a part-time distinguished professor in Hangzhou Dianzi University, China, and a visiting principal research scientist in Shenzhen Institute of Artificial Intelligence and Robotics for Society, China. He has been listed in "Most Cited Chinese Researchers" in eight consecutive years since 2015 by Elsevier. He is the Editor-in-Chief of Energy Conversion and Economics (IET), the deputy Editor-in-Chief of Automation of Electric Power Systems, and serves as the editor, subject editor and associate editor of several international journals. His research interests include power industry restructuring, power system alarm processing, fault diagnosis and restoration strategies, smart grids and electric vehicles, as well as artificial intelligence applications in power and integrated energy systems.
Haoming Liu, male, born in February 1977, from Yancheng, Jiangsu Province. Professor and doctoral supervisor of the School of Energy and Electrical Engineering, Hohai University. IEEE Senior Member, member of the Chinese Society for Electrical Engineering, member of the Electrical Mathematics Committee of the Chinese Society for Electrical Engineering, member of the Technical Committee of the Key Laboratory of Photovoltaic Power Generation Grid-connected Technology of Qinghai Province, selected into the Six Talent Peak Programs of Jiangsu Province, has been engaged in scientific research in the fields of smart grid, distributed renewable energy generation, electricity consumption and energy efficiency, electricity market, etc. In recent years, he has presided over more than 40 national, provincial and ministerial scientific research projects and enterprise commissioned projects, published more than 200 academic papers, including more than 100 SCI/EI indexed papers, authorized more than 10 national invention patents, won 8 provincial and ministerial science and technology progress awards, published 1 textbook of the 12th Five-Year Plan, and trained more than 80 graduate students.
Huiqing Wen (Senior Member, IEEE) received the B.S. and M.S. degrees from Zhejiang University, Hangzhou, China, in 2002 and 2006, respectively, and the Ph.D. degree from the Chinese Academy of Sciences, Beijing, China, in 2009, all in electrical engineering., From 2009 to 2010, he was an Electrical Engineer with the GE (China) Research and Development Center Company, Ltd., Shanghai, China. From 2010 to 2011, he was an Engineer with the China Coal Research Institute, Beijing, China. From 2011 to 2012, he was a Postdoctoral Fellow with the Masdar Institute of Science and Technology, Abu Dhabi, United Arab Emirates. Since 2013, he has been with the Department of Electrical and Electronic Engineering, Xi'an Jiaotong-Liverpool University, Suzhou, China, where he is currently an Professor. He has authored or coauthored more than 50 peer-reviewed technical papers in leading journals. His research interests include renewable energy, electric vehicle, power electronics, microgrid, and power semiconductor devices. Dr. Wen is a Fellow of the Institution of Engineering and Technology. He is the Associate Editor for IEEE Access, International Journal of Photoenergy, and Journal of Power Electronics.
Shunli Wang received the M.S. and Ph.D. degrees from the School of Information Engineering, Southwest University of Science and Technology, Mianyang, China. He is currently a Professor with the Southwest University of Science and Technology. He is currently an Authoritative Expert of the new energy research field and the Leader of New Energy Measurement and Control Research Team. He has undertaken more than 40 projects and 30 patents, authored or coauthored more than 150 research papers. Dr. Wang was the recipient of 20 awards, such as the Young Scholar, Science and Technology Progress Award, University-Enterprise Innovative Talent Team and National Electrical Safety and Quality Inspection Center (Sichuan) Academic Leader, developed multi-generational battery systems to improve the reliability and expand the application field with significant social and economic benefits.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 60 to 60 business days | 60 to 60 business days |
|---|---|---|
| First item | US$ 81.40 | US$ 81.40 |
Payment methods
- Paypal
Store description
Specialty
Bücher, SpielwarenSeller's business information
preigu GmbH & Co. KG
Lengericher Landstraße 19
Osnabrück, Germany 49078
Terms of sale
Standard Business Terms and customer information
I. Standard business terms
§ 1 Basic provisions
(1) The following terms and conditions of business apply for all contracts concluded with us as the supplier (preigu GmbH & Co. KG) via the websites AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of your own terms and conditions is explicitly rejected.
(2) A ‘consumer' in the sense of the following regulations is every natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities. The term ‘businessman' refers to every natural person, legal person or legally responsible partnership that concludes a legal transaction in pursuance of his/its independent professional or commercial activity.
§ 2 Conclusion of the contract
(1) The subject-matter of the contract is the selling of products .
(2) If an article is placed by us with AbeBooks or ZVAB, the activation of the page on AbeBooks or ZVAB shall involve the binding offer to conclude a contract under the terms and conditions contained in the article page.
(3) The contract shall become effective via the online shopping cart system as follows:
The products intended for purchase are moved to the "shopping cart". You can select the "Shopping Cart" using the appropriate buttons on the navigation bar and make changes there at any time.
After calling up the "Checkout" page and entering the required personal data and payment and shipping conditions, all order information is then displayed again on the order summary page.
Before submitting the order, you have the ability once more to review or change any information here (you may also use the "back" button on the Internet browser), or to cancel the purchase.
By clicking the "Buy now" button to submit the order, you declare your legally binding acceptance of the order which makes the contract effective.
(4) The execution of the order and the sending of all the details necessitated by the conclusion of the contract take place via e-mail, in a partially-automated manner. Consequently, you have to ensure that the e-mail address that you have deposited with us is the correct one, and that the receipt of the respective e-mails is guaranteed. In particular, you have to ensure that the respective e-mails are not blocked by a SPAM filter.
§ 3 Right of retention, reservation of proprietary rights
(1) You can only exercise a right of retention if the situation in question involves claims arising from the same contractual relationship.
(2) The goods remain our property until the purchase price is paid in full.
§ 4 Warranty
(1) The statutory warranty rights are applicable.
(2) As a consumer, you are requested to promptly check the product for completeness, visible defects and transport damage as soon as it is delivered, and promptly disclose your complaints to us and the shipping company in writing. Even if you do not comply with this request, it shall have no effect on your legal warranty claims.
(3) If a characteristic of the goods deviates from the objective requirements, the deviation shall only be deemed to be agreed if you were informed of the same by us before submitting the contractual declaration and the deviation was expressly and separately agreed between the contracting parties.
§ 5 Choice of law, place of fulfilment, jurisdiction
(1) German law shall apply. This choice of law only applies to customers if it does not result in the revocation of the protection guaranteed by the mandatory provisions of the law of the country in which the respective customer's usual place of residence is located (benefit-of-the-doubt principle).
(2) If you are not a consumer, but a businessman, a legal entity under public law or an institutional fund governed by public law, our place of business is the place of jurisdiction as well as the place of fulfilment for all services that follow from the business relationships that exist with us. The same condition applies to situations in which you are not associated with a general place of jurisdiction in Germany or the EU, as well as situations in which the place of residence or the usual place of residence is not known at the time of commencement of proceedings. This has no bearing on the capacity to call upon the court associated with another place of jurisdiction.
(3) The provisions of the UN Convention on Contracts for the International Sale of Goods are explicitly inapplicable.
II. Customer information
- Identity of the seller
preigu GmbH & Co. KG
Lengericher Landstr. 19
49078 Osnabrück
Germany
Telephone: 0541-580 72 84
E-Mail: mail@preigu.de
We are neither willing nor obliged to participate in dispute resolution proceedings before consumer arbitration boards.
- Information regarding the conclusion of the contract
The technical steps associated with the conclusion of the contract, the contract conclusion itself and the correction options are executed in accordance to the regulations "conclusion of the contract" in our standard business terms (part I.).
- Contractual language, saving the text of the contract
3.1 Contract language shall be English.
3.2 The complete text of the contract is not saved with us. Before the order is sent, the contract data can be printed out or electronically saved using the browser's print function. After the order is received by us, the order data, the legally-mandated details related to distance selling contracts and the standard business terms are re-sent to you via e-mail.
- Main features of the product or service
The key features of the goods and/or services can be found in the respective quote.
- Prices and payment arrangements
5.1 The prices mentioned in the respective offers represent total prices, as do the shipping costs. They include all the price components, including all the incidental taxes.
5.2 The dispatch costs that are incurred are not included in the purchase price. They can be viewed by clicking the appropriate button on our website or in the respective quote, are shown separately over the course of the order transaction and must additionally be borne by you, insofar as free delivery is not confirmed.
5.3 If delivery is made to countries outside of the European Union, we may incur unreasonable additional costs, such as duties, taxes or money transfer fees (transfer or foreign exchange fees charged by the banks), which you must bear.
5.4 You must also bear the costs arising from money transfers in cases in which the delivery is made to an EU Member State, but the payment is initiated outside of the European Union.
5.5 The payment methods that are available to you are shown by clicking the appropriate button on our website or are disclosed in the respective quote.
5.6 Unless otherwise specified for the respective payment methods, the payment claims arising from the contract that has been concluded become payable immediately.
- Delivery conditions
6.1 The delivery conditions, delivery date and existing supply restrictions, if applicable, can be found by clicking the appropriate button on our website or in the respective quote.
Unless a different period is specified in the item description or our delivery conditions, the goods are delivered within 3-5 days after the conclusion of the contract (in case an advance payment has been agreed upon, after the payment authorisation).
6.2 If you are a consumer, the following is statutorily regulated: The risk of the sold item accidentally being destroyed or degraded during shipping only passes over to you when the item in question is delivered, regardless of whether or not the shipping operation is insured. This condition does not apply if you have independently commissioned a transport company that has not been specified by us or a person who has otherwise been appointed to execute the shipping operation.
- Statutory warranty right
Liability for defects is governed by the "Warranty" provisions in our General Terms and Conditions of Business (Part I).
Information on battery disposal
In connection with the sale of batteries or the delivery of devices containing batteries, we are obliged to inform you of the following:
Batteries must not be disposed of with household waste.
You can either return used batteries that we carry or have carried in our range as new batteries to us at your own expense or return them free of charge to our shipping warehouse (shipping address). Alternatively, you can hand in the batteries at your local collection points.
As an end user, you are legally obliged to return used batteries so that they can be recycled or disposed of properly.
Used batteries may contain harmful substances that can damage the environment or your health if not stored or disposed of properly. However, batteries also contain important raw materials such as iron, zinc, manganese or nickel and can be recycled.
The symbols on the batteries have the following meanings:
The symbol of the crossed-out wheelie bin means that the battery must not be disposed of with household waste.
For batteries containing a certain amount of lead, cadmium or mercury, the following additions below the symbol with the crossed-out wheelie bin indicate the respective pollutants:
Pb = Battery contains more than 0.004% lead by weight
Cd = Battery contains more than 0.002% cadmium by weight
Hg = Battery contains more than 0.0005% mercury by weight
Information on the costs involved in accordance with Article 56 (4) of the EU Battery Regulation (Regulation 2023/1542) can be found at the ‘Batterie-Zurück (https://www.batterie-zurueck.de/de/bewirtschaftungvonaltbatterien/)' initiative.
Please pay attention to the above instructions.