Repetitive Project Scheduling: Theory and Methods
Zhang, Li-hui
Sold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since November 22, 2018
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: 3 available
Add to basketSold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since November 22, 2018
Condition: New
Quantity: 3 available
Add to basketRepetitive Project Scheduling: Theory and Methods is the first book to comprehensively, and systematically, review new methods for scheduling repetitive projects that have been developed in response to the weaknesses of the most popular method for project scheduling, the Critical Path Method (CPM).
As projects with significant levels of repetitive scheduling are common in construction and engineering, especially construction of buildings with multiple stories, highways, tunnels, pipelines, power distribution networks, and so on, the book fills a much needed gap, introducing the main repetitive project scheduling methods, both comprehensively and systematically.
Users will find valuable information on core methodologies, including how to identify the controlling path and controlling segment, how to convert RSM to a network model, and examples based on practical scheduling problems.
"About this title" may belong to another edition of this title.
We accept return for those books which are received damaged. Though we take appropriate care in packing to avoid such situation.
| Order quantity | 12 to 19 business days | 12 to 14 business days |
|---|---|---|
| First item | US$ 3.99 | US$ 6.99 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.