Second Progress Report on Kill Van Kull Bridge Between Bayonne, New Jersey, and

Language: English

Published by Forgotten Books, London, 2018

0364110244 / 9780364110249

  • Softcover
  • New
See all details
Item image 1 of 2.

Seller: Forgotten Books, London, United KingdomForgotten Books

5-star seller

AbeBooks seller since June 2, 2021

Softcover

Condition: New

US$ 17.29

 Free Shipping 
Ships from United Kingdom to U.S.A.

Quantity: Over 20 available

Add to basket
Free 30-day returns

Item description from seller

Print on Demand. Second Progress Report details the ascent of a monumental arch bridge project. This early-1931 report highlights the completion of the largest arch span attempted to date, built for the Kill van Kull Bridge between Bayonne and Port Richmond. It explains how engineers solved the challenge of falsework not encroaching on the nearby shipping channel and outlines the methods used to assemble and test the arch before opening to traffic.This edition presents a clear narrative of progress, from borings and abutments to the finished arch and the early stages of the approach structures. It documents the contracts awarded, the two-armed erection procedure, and the extensive stress measurements taken to verify design assumptions. The report also notes upcoming work on roadways, plazas, and utilities planned to complete the project in 1931.- What you'll learn about: the arch span's size, shape, and loading; the specialized construction methods used to protect the shipping channel; how stress observations supported confidence in the design; and the sequence of steel work, falsework, and floor system installation.- How engineers managed contracts, budgeting, and scheduling across multiple components of the Bayonne and Port Richmond approaches.- The scope of future work, including finishing touches on the plaza, lighting, railings, toll facilities, and administration buildings, all slated for 1931 completion.- The people and organizations contributing to the project, from consulting engineers to city and state officials, and how their collaboration enabled progress.Ideal for readers of historical engineering reports and those curious about early 20th-century bridge construction, this edition offers a concise view of a landmark project in progress. This book is a reproduction of an important historical work, digitally reconstructed using state-of-the-art technology to preserve the original format. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in the book. …

Title
Second Progress Report on Kill Van Kull Bridge Between Bayonne, New Jersey, and
Author
Port of New York Authority
Publisher
Forgotten Books, London
Publication year
2018
Condition
New
Dust jacket
No Jacket
Book Type
print-on-demand item
Binding
Paperback
Language
English
ISBN 10
0364110244
ISBN 13
9780364110249
Dimensions
5.98 x 0.25 x 9.02 inches
Seller catalogs
General Engineering

Forgotten Books

London, United Kingdom

5-star seller

AbeBooks seller since June 2, 2021

Shipping rates from United Kingdom to U.S.A.

Item5 to 10 business days5 to 10 business days
First itemUS$ 0.00US$ 0.00
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.

Payment methods

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay

Store description

Forgotten Books’ Classic Reprint Series utilizes the latest technology to regenerate facsimiles of historically important writings. Careful attention has been made to accurately preserve the original format of each page whilst digitally enhancing the quality of the aged text.

Specialty

Trade

Seller's business information

FB &c Ltd

Dalton House, 60 Windsor Avenue
London, United Kingdom SW19 2RR