Solar Power : A Practical Handbook
Language: English
Published by Globe Law And Business Jun 2018, 2018
- Hardcover
- New

Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH
AbeBooks seller since August 14, 2006
Condition: New
US$ 305.98
Quantity: 1 available
Add to basketItem description from seller
Neuware - This provides a practical guide to developing, financing, acquiring and disposing of solar power projects. Whilst being a technology which has been adopted on a global basis, each jurisdiction has its own dynamics, so the book considers the market-specific aspects of solar power in a number of key locations including China, Japan, the US and others.
Seller Inventory # 9781787421325
- Title
- Solar Power : A Practical Handbook
- Author
- Matthew Williams
- Publisher
- Globe Law And Business Jun 2018
- Publication year
- 2018
- Condition
- Neu
- Binding
- Buch
- Language
- English
- ISBN 10
- 1787421325
- ISBN 13
- 9781787421325
- Item weight
- 722 grams
- Dimensions
- 238x163x27 mm
"Synopsis" may belong to another edition of this title.
Excerpt. © Reprinted by permission. All rights reserved.
Solar Power
A Practical Handbook
By Matthew Williams, John DeaconGlobe Law and Business Ltd
All rights reserved.
Contents
Preface, 7,
Introduction, 9,
Part II – Regulation, technology and economics,
Legal, regulatory and industry frameworks, 13,
Solar power technologies and how they work, 31,
Economic drivers: support mechanisms, technology pricing, and other market dynamics, 53,
Part III – Developing solar power projects,
The anatomy of a solar power project, 65,
Real estate, 79,
The project agreements, 95,
Securing project revenues – the route to market and monetisation of generation, 105,
Financing perspectives, 119,
Part IV – M&A in the solar power market,
M&A and corporate structuring, 139,
Part V – Regional perspectives,
Algeria, 165,
Brazil, 179,
China, 193,
France, 205,
Germany, 215,
India, 225,
Italy, 243,
Japan, 257,
Middle East, 269,
Morocco, 285,
South Africa, 297,
Spain, 311,
United Kingdom, 329,
United States: Texas, 361,
Part VI – Broader perspectives,
The future for solar power, 373,
About the authors, 385,
CHAPTER 1
Legal, regulatory and industry frameworks
Munir Hassan
Andrew Sawbridge
CMS Cameron McKenna Nabarro Olswang LLP
1. Introduction
Solar power appears to be at the cusp of fulfilling its promise of providing utility-scale clean power at an affordable price. The plunge in solar technology costs, among other factors, has catalysed significant deployment of solar projects across the globe. Investors are keen to take advantage of the efficiencies offered by these developments while looking for a sufficient measure of stability to enable the required financial decisions to be made. Part of that stability is afforded by the legal and regulatory framework within which projects progress. But the framework may also seek to achieve a number of other objectives, such as:
• to progress and implement social, policy and environmental objectives;
• to ensure proper integration of solar projects within the wider industry matrix of legislation, codes, contracts, permits and guidance documents;
• to provide routes to market for the power produced from the project;
• where subsidies exist, to ensure that the project is, and remains, eligible for such subsidies.
The dynamic nature of the solar industry and its rapid technological advances have made governments and regulators sometimes feel, in responding to demands from investors for certainty and clarity, that they are seeking to establish enduring, stable and reliable policies on ever-shifting sands. Nevertheless, left to themselves, price signals from liberalised electricity markets generally tend to favour the safest investments. This disadvantages projects with high upfront capital expenditure (compared to operating costs) such as solar projects. Therefore, despite the difficulties, supportive national policies – in particular, specific renewables targets, arrangements for stable revenue streams and (in many cases) formal procurement programmes for solar projects – have been crucial to the success and growth of the solar sector. With the advent of subsidy-free solar, even in northern climes, the key to continued future growth will be for these policies to provide a sufficiently stable landscape for supply chains to be established and bed down, and for the economic benefits of greater scale to be fully realised.
The chapter provides an overview of the main considerations for solar projects in respect of the overarching legal, regulatory and industry frameworks, with specific details drawn from the regime in the United Kingdom and selected other jurisdictions to illustrate the approaches taken. What it shows is that the solar industry is in a period of major transition. The industry has long looked to legal, regulatory and industry frameworks to help to give solar projects preferential access to the system, to provide a policy backbone of decarbonisation and, in most cases, to provide subsidies to help solar projects achieve financial returns that justify investment. The solar industry is now having to adjust to a new reality, one in which, particularly in Europe, projects need to proceed without the benefit of a highly supportive policy blanket. In this more Darwinian world, revenue streams are potentially fixed at below market prices, or left entirely for projects to agree with offtakers. While formal procurement programmes for new solar projects remain in many countries, for those governments and regulators that have invested in solar programmes over the past years, many are now looking for the sector to become less reliant on government policy. It should be noted that legal frameworks can both support and actively destroy value in the sector, as was demonstrated by the examples of retroactive changes to subsidy arrangements for renewables a few years ago. However, with solar projects becoming increasingly self-sufficient, their exposure to such intervention is diminishing.
2. International legislation indirectly promoting solar projects
Climate change legislation has been seen as an important driver for policies promoting solar projects. Such legislation can be applicable on an international, continental, federal, state or national scale.
Public international law can come in a variety of forms, and does not automatically have the same legal effect or characteristics as legislation promulgated under the sovereign authority of a nation state. The need for a global response to the challenges of energy security and climate change has led to coordinated international legislative measures that are of varying legal effect. A well-known example is the Kyoto Protocol, an international agreement linked to the United Nations Framework Convention on Climate Change. The major feature of the Kyoto Protocol is that it set binding targets for 37 industrialised countries and the members of the European Union at that time for reducing greenhouse gas (GHG) emissions. These amounted to an average reduction of 5% against 1990 levels over the five-year period from 2008 to 2012. Levels vary by country: the United Kingdom accepted a legally binding target to reduce GHG emissions by 12.5% from 2008 to 2012.
The Kyoto Protocol requires countries to meet the targets mainly through national measures, although three market-based mechanisms are also offered to meet targets: emissions trading, the clean development mechanism (CDM) and joint implementation. The policy behind these mechanisms is to encourage green investment globally at least cost to the countries. For example, Brazil has implemented measures allowing the use of credits under the CDM in connection with renewable energy projects to incentivise investment in green energy.
The Kyoto Protocol works by monitoring the emissions made in each country and keeping a record of the trades that each country carries out to ensure that all transactions are within the rules prescribed. Countries submit annual emissions inventories and national reports for this purpose. The Kyoto Protocol has also established a compliance system that can assist countries with meeting their targets if they are having difficulty in complying.
In addition, the Kyoto Protocol helps countries to adapt to the negative impacts brought about by climate change and an Adaption Fund has been established to finance projects within this area. The Kyoto Protocol drove the development of national emissions reduction schemes and legislation in many countries worldwide before being superseded by the Paris Agreement.
The Paris Agreement entered into force on 4 November 2016. The text1 was agreed by 195 countries including a number of prominent polluters who were not signatories to the Kyoto Protocol, such as China, India and, initially, the United States.
The overall objective of the Paris Agreement was to hold global average temperatures to well below 2°C above pre-industrial levels. The message of the Paris Agreement was clear: it is the shared responsibility of the global community to mitigate the impact of climate change, and those with the broadest shoulders should take on the largest burden.
Developed countries are required to provide nationally determined contributions (NDCs) which consist of economy-wide absolute emission reduction targets. Article 6 of the Paris Agreement provides a framework for bilateral cooperation between countries to lower GHG emissions; countries may cooperate in implementing their NDCs by internationally transferred mitigation outcomes. This does not replace the CDM established under the Kyoto Protocol although the idea of a CDM transition has been floated, under which CDM projects could be incorporated into the structure of the Paris Agreement, rather than the Kyoto Protocol.
The longer-term commitment enshrined in Article 4 of the Paris Agreement is "to achieve a balance between anthropogenic emissions by sources and removals by sinks of GHGs (greenhouse gases)". The development of renewable sources of energy remains crucial to achieving these goals.
The Paris Agreement provides for a two-track approach. Developing countries have more time to transition to a low-carbon economy than developed countries.
Public international law, such as the Paris Agreement, is relevant for those projects that specifically use the mechanisms established under it. For most projects, the Kyoto Protocol and the periodic summits to discuss the climate change agenda are more important as indicators of trends, and drivers of government policies to promote the green agenda, of which renewable generation (and solar generation) is a part.
At an EU level, legislation can have direct effect on solar projects or require the implementation of measures that have such an effect. The principal piece of legislation is the 2009 Renewable Energy Directive (2009/28/EC), enacted by the European Parliament and the Council to promote the use of energy from renewable sources. It establishes an EU-wide framework for the promotion of renewable energy and sets legally binding targets on member states for the use of renewable energy. In particular, the directive requires:
• 20% of the European Union's overall energy consumption (electricity, heat and transport fuels) to come from renewable sources by 2020; and
• 10% of each member state's transport energy consumption to come from renewable sources by 2020.
Under the directive, each member state is required to submit a national renewable energy action plan (NREAP), following a template produced by the European Commission. The United Kingdom's NREAP requires the United Kingdom to reach its target for 15% of energy consumption in 2020 to be from renewable sources by setting out certain measures and action items. The directive also requires member states to implement measures for guarantees of origin, information and training and providing access to the grid for renewable energy projects.
The directive allows member states to achieve their targets by receiving a transfer of a certain amount of another country's renewable energy to contribute towards their national targets. Further, the directive provides for member states to enter into joint projects on renewable energy with other member states or third-party countries.
The directive must be implemented by each EU member state. For example, in the United Kingdom, the Promotion of the Use of Energy from Renewable Sources Regulations 2011 (SI 2011/243) implements the target set by the Renewable Energy Directive for the United Kingdom to achieve 15% of its energy consumption from renewable sources by 2020, together with interim indicative targets. Separate legislation then introduces the measures intended to achieve these targets.
In terms of broader organisations, a number of development banks and international organisations are active in the sector, to differing degrees. The World Bank has at its core, in relation to sustainable power, the Sustainable Energy for All initiative. This aims to promote sustainable energy across the world, particularly developing countries, while still allowing states to be autonomous in their energy policy decisions. The International Finance Corporation (IFC) appears more focused on renewables as a policy decision than the World Bank at large. In 2015, the IFC launched the 'Scaling Solar' project to attract investment in two large-scale solar projects in Zambia with a total capacity of 76 MW. The auction attracted 48 solar power developers, seven of whom submitted final proposals which secured the lowest solar power tariffs in Africa up to that point. In June 2016, one of the successful bidders offered to sell power at just US$0.06015 per kWh for 25 years. The European Bank for Reconstruction and Development takes a more geographically focused view on the renewable energy market as relevant to its reconstruction remit.
3. National legislation
3.1 Legislation indirectly promoting solar projects
A solar project developer should be cognisant of the overall international legislative landscape for its project, even if the developer is one step removed from day-to-day implementation, because it drives the impetus towards clean energy projects in general. However, the key requirements and determinants of success will be in the national-level legislation that directly applies to the project. A solar project is a complex venture requiring compliance with a wide variety of legislative requirements. It is beyond the scope of this chapter to detail the full scope of rules applicable to a solar project. This section therefore deals with two types of legislation: that dealing with climate change generally and that specifically dealing with solar or renewables projects.
Some countries have implemented national legislation to deal with decarbonisation in order to address climate change and to encourage investment in renewable energy. In the United Kingdom, the main piece of climate change legislation is the Climate Change Act 2008. The explanatory notes outline the purpose of the act as implementing a framework for the United Kingdom "to achieve its long-term goals of reducing greenhouse gas emissions and to ensure steps are taken towards adapting to the impact of climate change".
Some elements of the act include:
• establishment of emissions reduction targets and carbon budgeting in statute by the creation of an emissions reduction programme and medium and long-term targets;
• annual reporting by the government on the United Kingdom's GHG emissions, and the granting of powers so that domestic trading schemes can be established through secondary legislation; and
• the establishment of the Committee on Climate Change, an independent body set up to advise the government and devolved administrations.
3.2 Legislation directly promoting solar projects
The principal way that countries have supported solar projects is through the creation of financial support mechanisms. In Europe, such mechanisms tend to take the form of either a fixed payment or a top-up payment per megawatt hour (MWh) of electricity produced, the level of which tends to differ for different types of renewable generation (further detail on which can be found in the chapter on financial incentives and revenue streams). By way of example, policy in Morocco has tended to focus more on providing attractive tax incentives for renewable generation. There is no feed-in tariff in Morocco. Instead, there is a total exemption from corporate tax for any new industrial business and a number of Export Processing Zones have been established which are exempt from customs regulation, foreign trade and exchange control and other restrictive regulation. Likewise, in the case of India, the central government has tended to grant exemptions from customs and excise duties on certain machinery and systems needed to set up a renewable energy project. See the chapters on Morocco and India for further details of these solar markets.
Other governments have adopted legislation to limit foreign direct investment in order to protect the country's home-grown industries. In the United States, the government has approved tariffs of up to 30% on solar equipment made outside the United States, while high tariffs on solar technology remain in Brazil, despite the reduced import tax for solar PV equipment introduced in 2011, provided there is no equivalent local production.
In addition to providing financial incentives, governments have taken other actions to promote solar and other renewable projects. The European Union has been active in this area – for example, by requiring member states to impose an obligation on suppliers to disclose information about their fuel mix in the hope that this will enable consumers to exercise their purchasing power in favour of renewable electricity. It has also imposed a requirement on EU member states to ensure that renewable generation has priority access to the grid.
More broadly, governments can also make a difference to renewable projects by ensuring that the wider regulatory regime does not present an obstacle to their success – for example, by ensuring that planning laws balance local and national interests appropriately, and that the interests of renewables are taken into account in the development of industry arrangements, such as the network charging regime. In general terms, the perceived stability and nature of the regulatory regime in a particular jurisdiction can have a significant effect on the success of the renewables industry and the terms on which investors are willing to finance projects there, and therefore a stable legislative regime is important. Of course, this is important to all investors, but the fact that solar projects have high upfront capital costs and have traditionally depended on subsidies makes it all the more so for them.
(Continues...)
Excerpted from Solar Power by Matthew Williams, John Deacon. Copyright © 2018 Globe Law and Business Ltd. Excerpted by permission of Globe Law and Business Ltd.
All rights reserved. No part of this excerpt may be reproduced or reprinted without permission in writing from the publisher.
Excerpts are provided by Dial-A-Book Inc. solely for the personal use of visitors to this web site.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 5 to 7 business days | 7 to 10 business days |
|---|---|---|
| First item | US$ 35.38 | US$ 35.38 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Das Unternehmen AHA-BUCH GmbH: Seit der Gründung von AHA-BUCH im Juli 2005 ist unser Hauptziel, zufriedenen Kunden so schnell und so preisgünstig wie möglich ihren Bücherwunsch zu erfüllen. Unsere Firma beschäftigt 16 Mitarbeiter, die nur ein Ziel kennen: den Kunden und seine Wünsche! Auf über 3700 m2 Fläche haben wir über 100.000 Bücher, Modernes Antiquariat und Spiele auf Lager.
Specialty
Kinderbücher & Kinderhör Casetten, German Books, Software, Natur & Tiere, Ratgeber, Sachbücher, Englische Bücher, Medizin & Gesundheit, Universität & StudiumSeller's business information
AHA-BUCH GmbH
Garlebsen 48
Einbeck, Germany 37574
Terms of sale
General Terms and Conditions and Customer Information / Privacy Policy
I. General Terms and Conditions
§ 1 Basic provisions
(1) The following terms and conditions apply to all contracts that you conclude with us as a provider (AHA-BUCH GmbH) via the Internet platforms AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of any of your own terms and conditions used by you will be objected to
(2) A consumer within the meaning of the following regulations is any natural person who concludes a legal transaction for purposes that can predominantly be attributed neither to their commercial nor their independent professional activity. An entrepreneur is any natural or legal person or a partnership with legal capacity who, when concluding a legal transaction, acts in the exercise of his independent professional or commercial activity.
§ 2 Conclusion of the contract
(1) The object of the contract is the sale of goods.
(2) If an article is listed by us at AbeBooks or ZVAB, the activation of the offer page at AbeBooks or ZVAB constitutes the binding offer to conclude a contract under the conditions contained in the article page.
(3) The contract is concluded via the online shopping cart system as follows:
The goods intended for purchase are stored in the "shopping cart". Via the corresponding button in the navigation bar you can call up the "shopping cart" and make changes there at any time.
After calling up the "Checkout" page and entering the personal data as well as the payment and shipping conditions, all order data will be displayed again on the order overview page.
Before sending the order, you have the option of checking all information again, changing it (also via the "back" function of the Internet browser) or cancelling the purchase.
By submitting the order via the "Buy now" button, you declare the acceptance of the offer in a legally binding manner, whereby the contract is concluded.
(4) The processing of the order and transmission of all information required in connection with the conclusion of the contract is partly automated by e-mail. You must therefore ensure that the e-mail address you have stored with us is correct, that the receipt of the e-mails is technically ensured and, in particular, that spam filters do not prevent it.
§ 3 Right of retention, retention of title
(1) You can only exercise a right of retention if it concerns claims from the same contractual relationship.
(2) The goods remain our property until full payment of the purchase price.
§ 4 Warranty
(1) The statutory warranty rights exist.
(2) In the case of used goods, the warranty period is one year from delivery of the item, deviating from the statutory regulation. The shortening of the deadline does not apply:
- culpably caused damages attributable to us from injury to life, limb or health and in the case of other damages caused intentionally or through gross negligence;
- insofar as we have fraudulently concealed the defect or have assumed a guarantee for the quality of the item.
(3) As a consumer, you are requested to check the item immediately upon delivery for completeness, obvious defects and transport damage and to inform us and the freight forwarder of any complaints as soon as possible. If you do not comply with this, this will have no effect on your statutory warranty claims.
§ 5 Choice of law, place of performance, place of jurisdiction
(1) German law shall apply. In the case of consumers, this choice of law shall only apply insofar as this does not withdraw the protection afforded by mandatory provisions of the law of the state of the consumer's habitual residence (principle of favourability).
(2) The place of performance for all services arising from the existing business relationships with us as well as the place of jurisdiction is our registered office, insofar as you are not a consumer, but a merchant, a legal entity under public law or a special fund under public law. The same applies if you do not have a general place of jurisdiction in Germany or the EU or if the domicile or habitual residence is not known at the time the action is brought. The right to appeal to the court at another statutory place of jurisdiction remains unaffected by this.
(3) The provisions of the UN Convention on Contracts for the International Sale of Goods shall expressly not apply.
II. Customer Information
- Identity of the Seller
AHA-BUCH GmbH
Garlebsen 48
D-37574 Einbeck
Germany
Telephone: 055639996039
E-mail: abebooks@aha-buch.de.
Alternative dispute resolution:
The European Commission provides a platform for out-of-court online dispute resolution (ODR platform), which can be accessed under https://ec.europa.eu/odr.
- Information on the conclusion of the contract
The technical steps for the conclusion of the contract, the conclusion of the contract itself and the correction options are carried out in accordance with the provisions "Conclusion of the contract" of our General Terms and Conditions (Part I.).
- Contract language, contract text storage
3.1. The contract language is german.
3.2. The complete text of the contract will not be stored by us. Before sending the order, the contract data can be printed out or electronically saved via the print function of the browser. After receipt of the order by us, the order data, the legally prescribed information for distance contracts and the General Terms and Conditions will be sent to you again by e-mail.
- Essential characteristics of the goods or services
The essential characteristics of the goods and/or services can be found in the respective offer.
- Prices and terms of payment
5.1. The prices stated in the respective offers as well as the shipping costs represent total prices. They include all price components including all applicable taxes.
5.2. The shipping costs incurred are not included in the purchase price. They can be called up via a correspondingly designated button on our website or in the respective offer, are shown separately in the course of the ordering process and are to be borne by you in addition, unless free shipping has been promised.
5.3. If the delivery is made to countries outside the European Union, we may incur additional costs for which we are not responsible, such as.B customs duties, taxes or money transfer fees (transfer or exchange rate fees of the credit institutions), which are to be borne by you. Any costs incurred for the transfer of money shall also be borne by you in cases where the delivery is made to an EU member state, but the payment was initiated outside the European Union.
5.4. The payment methods available to you are indicated under a corresponding button on our website or in the respective offer.
5.5. Unless otherwise stated for the individual payment methods, the payment claims from the concluded contract are due for payment immediately.
- Terms of delivery
6.1. The terms of delivery, the delivery date and, if applicable, existing delivery restrictions can be found under a correspondingly designated button on our website or in the respective offer.
Insofar as no other deadline is specified in the respective offer or under the correspondingly designated button, the delivery of the goods will take place within 3-5 days after conclusion of the contract (in the case of agreed advance payment, however, only after the time of your payment instruction).
6.2. Insofar as you are a consumer, it is regulated by law that the risk of accidental loss and accidental deterioration of the sold item during dispatch shall only pass to you upon handover of the goods, regardless of whether the shipment is insured or uninsured. This does not apply if you have independently commissioned a transport company not named by the entrepreneur or a person otherwise designated to carry out the shipment.
- Statutory liability for defects
Liability for defects is governed by the "Warranty" provision in our General Terms and Conditions (Part I).
last update: 01/06/2022
Privacy policy
Unless otherwise stated below, the provision of your personal data is neither required by law or contract, nor is it necessary for the conclusion of a contract. You are not obliged to provide the data. Failure to provide this will have no consequences. This only applies if no other information is provided in the subsequent processing operations.
Collection, processing and disclosure of personal data when placing orders
When ordering, we collect and process your personal data only to the extent necessary to fulfil and process your order and to process your enquiries. The provision of the data is necessary for the conclusion of the contract. Failure to provide this provision means that no contract can be concluded. The processing takes place on the basis of Art. 6 para. 1 lit.b GDPR and is necessary for the performance of a contract with you.
Your data will be passed on, for example, to the shipping companies and dropshipping providers selected by you, payment service providers, service providers for order processing and IT service providers.
In all cases, we strictly observe the legal requirements. The scope of data transmission is limited to a minimum.
Duration of storage
After completion of the contract, the data will first be stored for the duration of the warranty period, then taking into account legal, in particular tax and commercial retention periods and then deleted after expiry of the period, unless you have consented to further processing and use.
Rights of the data subject
If the legal requirements are met, you have the following rights under Articles 15 to 20 GDPR: Right to information, to correction, to erasure, to restriction of processing, to data portability.
In addition, pursuant to Article 21 (1) GDPR, you have the right to object to processing based on Article 6 (1) f GDPR and to processing for direct marketing purposes.
Contact us on request. The contact details can be found in our imprint.
Right to lodge a complaint with the supervisory authority
In accordance with Article 77 GDPR, you have the right to complain to the supervisory authority if you believe that the processing of your personal data is not lawful.
Right to object
If the personal data processing listed here is based on our legitimate interest pursuant to Art. 6 para. 1 lit. f GDPR, you have the right to object to this processing at any time with effect for the future for reasons arising from your particular situation.
Shipping terms
We ship your order after we received them
for articles on hand latest 24 hours,
for articles with overnight supply latest 48 hours.
In case we need to order an article from our supplier our dispatch time depends on the reception date of the articles, but the articles will be shipped on the same day.
Our goal is to send the ordered articles in the fastest, but also most efficient and secure way to our customers.