Sustainable Ecological Engineering Design
Language: English
Published by Springer Verlag GmbH, 2026
- Softcover
- New

Condition: New
US$ 228.51
Quantity: Over 20 available
Add to basketItem description from seller
Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 3477576297
- Title
- Sustainable Ecological Engineering Design
- Publisher
- Springer Verlag GmbH
- Publication year
- 2026
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 3031739493
- ISBN 13
- 9783031739491
The International Conference of Sustainable Ecological Engineering Design for Society (SEEDS) brings together global experts to focus on a sustainability agenda and the positive and detrimental changes that are taking place. Papers presented at the conference come from across a broad spectrum of the Sustainable Development Goals (SDGs) and bring forward practices to tackle the climate emergency and evaluate their impact. It addresses technical issues, measuring, monitoring, and assessing change, emphasizing the environment, infrastructure, and buildings, how they exist in relative isolation, and the possibilities for sustainable integration. The SEEDS Conference addresses the interdependence of people and the built and natural environments and recognizes the interdisciplinary and international themes necessary to assemble the knowledge required for positive change.
"Synopsis" may belong to another edition of this title.
About the Author
Christopher Gorse is Professor of Construction Engineering and Management at Loughborough University, with 35 years construction consultancy and research experience. He has written extensively in the areas of energy, sustainability, social sustainability, systems management, infrastructure, construction technology, refurbishment and management. Chris’s multidisciplinary background established him as a leading authority on building quality, systems, standardisation and performance. Chris also holds Visiting Professor positions at the University of Suffolk and Central University of Technology in South Africa, engaging internationally on sustainability and lean construction. Chris is the founding Chair of the International Conference for Sustainable Ecological Engineering Design for Society (SEEDS) and past Chair of the Association of Researchers in Construction Management (ARCOM).
Bianca Drotleff is a Project Manager at the University of Cambridge Institute for Sustainability Leadership (CISL), where she helps develop new thinking and solutions for businesses to accelerate the transition to a sustainable economy that enables all people to lead healthy, flourishing lives within planetary boundaries. She also sits on IEMA’s Circular Economy Steering Group, where she delivers accessible content on the topic for members. Previously, Bianca worked at the Leeds Sustainability Institute, where she coordinated the International SEEDS Conference. Before this, she worked for CSR Europe, a Brussels-based organisation, where she supported their work on the circular economy, including the EU-funded project “R2π – tRansition from linear 2 circular”, investigating circular business models. She holds an MSc in Environment and Development from the University of Leeds and a BSc in International Business and Management from the University of Bradford. Throughout her studies, her research focused on circulareconomy as a solution to reaching the net zero ambition.
Beth Jones is a Research and Project Coordinator for Leeds Sustainability Institute based within the School of Built Environment Engineering and Computing at Leeds Beckett University. Beth coordinates the annual International SEEDS Conference and supports with the editing of the proceedings and publications, including the annual series of the Sustainable Ecological Engineering Design for Society (SEEDS) Springer Nature book.
Mohammad Dastbaz is the Deputy Vice-Chancellor at the University of Suffolk. Professor Dastbaz’s research work over recent years has been focused on the use and impact of emerging technologies in society, particularly learning, training and the development of “eGovernment.” Dr. Dastbaz has led EU and UK-based funded research projects and has been the Symposium Chair of Multimedia Systems in IEEE’s Information Visualisation (IV) conference since 2002. He has over 65 refereed publications, including numerous journal paper articles, conference papers, book chapters and books on e-learning, eGovernment, and the design and development of Multimedia Systems. Professor Dastbaz is a Fellow of the British Computer Society and the UK’s Higher Education Academy as well as a professional member of the ACM and IEEE Computer Society.
Lloyd M. Scott is a Professor of Practice in the Construction Science Division at the University of Oklahoma. He is also a practicing academic at the Technological University Dublin (formerly the Dublin Institute of Technology (DIT)). He attended DIT as a trade apprentice in Carpentry and Joinery and later qualified with a City and Guilds certificate in Site Management, where he worked in the industry as site superintendent for some years. Lloyd was a scholarship recipient at the University of Limerick where he earned a B.Tech (Hons) in Wood and Building Technology in 1988. He received a MA in Educational Management at Waterford Institute of Technology and a PhD from The School of the Built Environment at the University of Salford. Dr. Scott worked in construction as a site superintendent for a large contracting company in Dublin for many years. He continues to perform select projects, and provide consulting services with the emphasis on sustainable construction practice. Before becoming associated with the University of Oklahoma in 2009, he had spent the previous nine years in the newly formed Construction Management (CM) Department at DIT where he set up the CM program. He has been recognized for his efforts with students in and out of the classroom, has published a number of articles in peer-reviewed journals and has completed various externally funded projects. His research interests revolve around sustainability in construction and educational assessment in built environment. Professor Scott is an Associate Editor of the International Journal of Construction Education and Research and also serves on the editorial boards of the International Journal of Building Pathology and Adaptation and The Mass Timber Journal.
Colin Booth has been the Associate Head for Research and Scholarship for Architecture and the Built Environment since joining the University of the West of England in early 2012. He has also been a Director of the Construction and Property Research Centre, and a Director of the Centre for Floods, Communities and Resilience. He has previously been the Research Leader for a School of Built Environment, a Reader in Construction Management, a Reader in Civil Engineering, an Overseas Tutor (Hong Kong), a Senior Lecturer in Civil and Environmental Engineering, a European Research Project Manager and he has also held several Post-Doctoral Research Fellowship posts at other universities. He holds the distinguished titles of Visiting Professor of Civil Engineering and Visiting Professor of Sustainability at prestigious international universities.
Saheed Ajayi is a Professor of Digital Construction and Project Management and the Director of Construction Informatics and Digital Enterprise Laboratory (CIDEL) within the school of Built Environment, Engineering and Computing. His research interests are in Building Information Modelling (BIM), Sustainable Construction (with specific focus on waste management), Competency-based Modelling and Construction Informatics (the use of Digital Technologies such as Big Data Analytics, IoT and Machine Learning in Construction). Saheed holds a PhD in Construction and Architectural Management, MSc (with distinction) in Sustainable Architecture and Healthy Building and a BSc with First Class (Hons) in Architecture. Prior to joining the academia, he has worked in various capacities within the construction industry as a design/project architect and construction project manager. Over the years,he has been involved in various collaborative and multidisciplinary research involving key players within the UK construction industry. He has executed various externally funded projects with a combined value of up to £7 million.
Darryl Newport is Professor of Energy and Sustainable Development and Director of the Suffolk Sustainability Institute. He is an environmental scientist specialising in the built environment. His research and policy interests include alternative energy systems, sustainable construction through alternative material use and natural resource management including resource efficiency. He has written extensively in the areas of sustainable development, alternative energy, urban green infrastructure, resource efficiency and waste management. He currently leads the strategic sustainable development of the University of Suffolk. He is involved in numerous ongoing research and consultancy projects, national and international, as well as conducting research into novel construction materials. Darryl is a current Chair of the International Conference for Sustainable Ecological Engineering Design for Society (SEEDS) Currently focusing on the advancement of green technology and removal of the barriers to decarbonisation within the built environment utilizing green infrastructure. He has been successful in attracting multiple national and international funded projects with a combined value of up to £18 million.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | US$ 55.00 | US$ 55.00 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
-
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
-
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
-
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Engberdingdamm 27, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
-
To Moluna GmbH, Münsterstr. 105, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
-
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service () -
Ordered on ()/ received on ()
-
Name of the consumer(s)
-
Address of the consumer(s)
-
Signature of the consumer(s) (only in case of a notification on paper)
-
Date
(*) Cross out the incorrect option.
Standard Business Terms and customer information / data protection declaration
I. Standard business terms
§ 1 Basic provisions
(1) The following terms and conditions of business apply for all contracts concluded with us as the supplier (Moluna GmbH) via the websites AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of your own terms and conditions is explicitly rejected.
(2) A ‘consumer’ in the sense of the following regulations is every natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities. The term ‘businessman’ refers to every natural person, legal person or legally responsible partnership that concludes a legal transaction in pursuance of his/its independent professional or commercial activity.
§ 2 Conclusion of the contract
(1) The subject-matter of the contract is the selling of products .
(2) If an article is placed by us with AbeBooks or ZVAB, the activation of the page on AbeBooks or ZVAB shall involve the binding offer to conclude a contract under the terms and conditions contained in the article page.
(3) The contract shall become effective via the online shopping cart system as follows:
The products intended for purchase are moved to the "shopping cart". You can select the "Shopping Cart" using the appropriate buttons on the navigation bar and make changes there at any time.
After calling up the “Checkout” page and entering the required personal data and payment and shipping conditions, all order information is then displayed again on the order summary page.
Before submitting the order, you have the ability once more to review or change any information here (you may also use the "back" button on the Internet browser), or to cancel the purchase.
By clicking the “Buy now” button to submit the order, you declare your legally binding acceptance of the order which makes the contract effective.
(4) The execution of the order and the sending of all the details necessitated by the conclusion of the contract take place via e-mail, in a partially-automated manner. Consequently, you have to ensure that the e-mail address that you have deposited with us is the correct one, and that the receipt of the respective e-mails is guaranteed. In particular, you have to ensure that the respective e-mails are not blocked by a SPAM filter.
§ 3 Right of retention, reservation of proprietary rights
(1) You can only exercise a right of retention if the situation in question involves claims arising from the same contractual relationship.
(2) The goods remain our property until the purchase price is paid in full.
(3) If you are a businessman, the following conditions also apply:
a) We retain ownership of the goods until all the claims arising from the ongoing business relationship have been settled in full. The goods subject to retention of title may not be pledged or transferred by way of security before ownership of the said goods changes hands.
b) You can re-sell the goods within the framework of an orderly transaction. In this regard, you hereby cede all the claims amounting to the magnitude of the billing amount that accrue to you as a result of the re-selling operation to us, and we accept the cession. Furthermore, you are authorised to collect the claim in question. However, insofar as you do not discharge your payment obligations in an orderly fashion, we reserve the right to collect the claim ourselves.
c) In a situation involving the combination and amalgamation of the goods subject to retention of title, we acquire co-ownership of the newly-formed item. This co-ownership corresponds to the ratio that exists between the invoice value of the goods subject to retention of title and the other processed items at the time of processing.
d) If you make a request of this nature, we shall be obligated to release the securities that are due to us, to the extent that the realisable value of our securities exceeds the claim to be secured by more than 10%. We are responsible for selecting the securities to be released.
§ 4 Warranty
(1) The statutory warranty rights are applicable.
(2) As a consumer, you are requested to promptly check the product for completeness, visible defects and transport damage as soon as it is delivered, and promptly disclose your complaints to us and the shipping company in writing. Even if you do not comply with this request, it shall have no effect on your legal warranty claims.
(3) If a characteristic of the goods deviates from the objective requirements, the deviation shall only be deemed to be agreed if you were informed of the same by us before submitting the contractual declaration and the deviation was expressly and separately agreed between the contracting parties.
(4)
Insofar as you are an entrepreneur, the following shall apply in deviation from the above warranty provisions:
a) Only our own specifications and the manufacturer's product description shall be deemed agreed as the quality of the goods, but not other advertising, public promotions and statements by the manufacturer.
b) In the event of defects, we shall, at our discretion, provide warranty by rectification of the defect or subsequent delivery. If the rectification of defects fails, you may, at your option, demand a reduction in price or withdraw from the contract. The rectification of defects shall be deemed to have failed after a second unsuccessful attempt, unless the nature of the goods or the defect or other circumstances indicate otherwise. In the event of rectification of defects, we shall not be obliged to bear the increased costs arising from the transport of the goods to a place other than the place of performance, unless such transport is in accordance with the intended use of the goods.
c) The warranty period shall be one year from delivery of the goods. The shortening of the period shall not apply
- for culpable damage attributable to us arising from injury to life, limb or health and for other damage caused intentionally or by gross negligence;
- insofar as we have fraudulently concealed the defect or have assumed a guarantee for the quality of the item;
- in the case of items which have been used for a building in accordance with their customary use and have caused its defectiveness;
- in the case of statutory rights of recourse that you may assert against us in connection with rights arising from defects.
§ 5 Choice of law, place of fulfilment, jurisdiction
(1) German law shall apply. This choice of law only applies to customers if it does not result in the revocation of the protection guaranteed by the mandatory provisions of the law of the country in which the respective customer’s usual place of residence is located (benefit-of-the-doubt principle).
(2) If you are not a consumer, but a businessman, a legal entity under public law or an institutional fund governed by public law, our place of business is the place of jurisdiction as well as the place of fulfilment for all services that follow from the business relationships that exist with us. The same condition applies to situations in which you are not associated with a general place of jurisdiction in Germany or the EU, as well as situations in which the place of residence or the usual place of residence is not known at the time of commencement of proceedings. This has no bearing on the capacity to call upon the court associated with another place of jurisdiction.
(3) The provisions of the UN Convention on Contracts for the International Sale of Goods are explicitly inapplicable.
II. Customer information
- Identity of the seller
Moluna GmbH
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
E-Mail: abe@moluna.de
- Information regarding the conclusion of the contract
The technical steps associated with the conclusion of the contract, the contract conclusion itself and the correction options are executed in accordance to the regulations "conclusion of the contract" in our standard business terms (part I.).
- Contractual language, saving the text of the contract
3.1 Contract language shall be English.
3.2 The complete text of the contract is not saved with us. Before the order is sent, the contract data can be printed out or electronically saved using the browser’s print function. After the order is received by us, the order data, the legally-mandated details related to distance selling contracts and the standard business terms are re-sent to you via e-mail.
- Main features of the product or service
The key features of the goods and/or services can be found in the respective quote.
- Prices and payment arrangements
5.1 The prices mentioned in the respective offers represent total prices, as do the shipping costs. They include all the price components, including all the incidental taxes.
5.2 The dispatch costs that are incurred are not included in the purchase price. They can be viewed by clicking the appropriate button on our website or in the respective quote, are shown separately over the course of the order transaction and must additionally be borne by you, insofar as free delivery is not confirmed.
5.3 The payment methods that are available to you are shown by clicking the appropriate button on our website or are disclosed in the respective quote.
5.4 Unless otherwise specified for the respective payment methods, the payment claims arising from the contract that has been concluded become payable immediately.
- Delivery conditions
6.1 The delivery conditions, delivery date and existing supply restrictions, if applicable, can be found by clicking the appropriate button on our website or in the respective quote.
Unless a different period is specified in the item description or our delivery conditions, the goods are delivered within 3-5 days after the conclusion of the contract (in case an advance payment has been agreed upon, after the payment authorisation).
6.2 If you are a consumer, the following is statutorily regulated: The risk of the sold item accidentally being destroyed or degraded during shipping only passes over to you when the item in question is delivered, regardless of whether or not the shipping operation is insured. This condition does not apply if you have independently commissioned a transport company that has not been specified by us or a person who has otherwise been appointed to execute the shipping operation.
If you are a businessman, the delivery and shipping operations take place at your own risk.
- Statutory warranty right
Liability for defects is governed by the “Warranty” provisions in our General Terms and Conditions of Business (Part I).
last update: 01.01.2022
Data protection declaration
Unless stated otherwise below, the provision of your personal data is neither legally nor contractually obligatory, nor required for conclusion of a contract. You are not obliged to provide your data. Not providing it will have no consequences. This only applies as long as the processing procedures below do not state otherwise.
“Personal data” is any information relating to an identified or identifiable natural person.
Responsible person
Contact us at any time. The contact details of the person responsible for data processing can be found in our legal notice.
Collection, processing, and transfer of personal data in orders
When you submit an order we only collect and use your personal data insofar as this is necessary for the fulfilment and handling of your order as well as processing of your queries. The provision of data is necessary for conclusion of a contract. Failure to provide it will prevent the conclusion of any contract. The processing will occur on the basis of Article 6(1) b) GDPR and is required for the fulfilment of a contract with you.
Your data is transferred here for example to the shipping companies and dropshipping providers, payment service providers, service providers for handling the order and IT service providers that you have selected. We will comply strictly with legal requirements in every case. The scope of data transmission is restricted to a minimum.
Duration of storage
After contractual processing has been completed, the data is initially stored for the duration of the warranty period, then in accordance with the retention periods prescribed by law, especially tax and commercial law, and then deleted after the period has elapsed, unless you have agreed to further processing and use.
Rights of the affected person
If the legal requirements are fulfilled, you have the following rights according to art. 15 to 20 GDPR: Right to information, correction, deletion, restriction of processing, data portability. You also have a right of objection against processing based on art. 6 (1) GDPR, and to processing for the purposes of direct marketing, according to art. 21 (1) GDPR.
Right to complain to the regulatory authority
You have the right to complain to the regulatory authority according to art. 77 GDPR if you believe that your data is not being processed legally.
Right to object
If the data processing outlined here is based on our legitimate interests in accordance with Article 6(1)f) GDPR, you have the right for reasons arising from your particular situation to object at any time to the processing of your data with future effect.
If the objection is successful, we will no longer process the personal data, unless we can demonstrate compelling legitimate grounds for the processing that outweigh your interests or rights and freedoms, or the processing is intended for the assertion, exercise or defence of legal claims.
last update: 10.01.2022