Sustainable Innovations in Construction Management
Book 305 of 362: Lecture Notes in Civil EngineeringNew - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Covers topics of construction optimization and managementPresents select proceedings of ICC-IDEA 2023Provides the latest research in civil engineeringDr. Osman Gencel is working as a professor in the Civil Engineering Depart.
Seller Inventory # 1027290784
This book presents the select proceedings of International Conference on Civil Engineering: Innovative Development in Engineering Advances (ICC IDEA 2023). This book covers the latest research in the areas of construction engineering and management, urban planning and design, building energy conservation and green architecture, materials science and engineering, innovation in construction materials, and information technology in civil engineering. The book is useful for researchers and professionals in civil engineering.
Dr. Osman Gencel is working as a professor in the Civil Engineering Department faculty of Engineering, Architecture, and Design Bartin University, 74100 Bartin, Turkey. He graduated B.Sc. at Firat University, a Master’s from Afyoun Kocatepe University, a Ph.D. at Suleyman Demirel University, a Ph.D. in Studies, and a Postdoctorate from the University of North Texas. He listed the world’s top 2% of scientists as 275 in 2020, 174 in 2021, and 117 in 2022 at Stanford University. According to Web of Science, he had an H-index of 33. He has research interests in cement-based composites, foam concrete, lightweight concrete, radiation shielding concrete, polymer concrete, geopolymer concrete, fiber-reinforced concrete, mortar, Gypsum-based composites, phased change materials, energy storage, smart buildings, recycling and sustainability, 3D printing concrete, and nanomaterials. He had published more than 170 papers in SCI and SCI-E journals and published 5 books and has duties in 4 respective scientific journals.
Dr. M. Balasubramanian has fourteen years of diverse experience in academics and industrial projects. He completed his B.E. in Civil Engineering at Annamalai University, Chidambaram, M. Tech, in Construction Engineering and Management, and Doctorate of Philosophy in SRM Institute of Science and Technology. He has published more than 50 research articles in SCI and Scopus-indexed journals, he filed and published eight patents, and he has four funded projects for the various research streams, such as special concrete, energy efficiency buildings, and construction project management, and his current research topics include the energy efficiency construction material, IoT in construction, and artificial Intelligence in smart buildings. He served as the panel member of international and national conferences, an editorial board member, and a reviewer of several journals. He is a member of Institution of Engineers (M.I.E), Indian Concrete Institute (ICI), Indian Society for Technical education, and other technical membership communities.
Dr. T. Palanisamy is currently working in the Department of Civil Engineering, National Institute of Technology Karnataka (NIT K), Surathkal, India. He specialized in Structural Engineering and areas of interest in bio-concrete, concrete battery, micro-characterization of concrete, beam-column joint, and artificial intelligence and machine learning applications in beam-column joint. He obtained B.E. (Civil) at Government College of Engineering Erode from Bharathiyar University, Coimbatore, India, an M.E. (Structural Engineering) at Government College of Engineering, India, and a Ph.D. in Civil Engineering–Structural Engineering from Govt. College of Technology, Coimbatore, Tamil Nādu, under Anna University, Chennai, India. He has a total of 20 years of teaching experience and has published 35 research articles in journals and 45 in conferences. He published 7 books/chapters and E-learning materials developed. He acts as an editor of two international publication books. He has registered 17 patents and 3 have been granted. He has received 16 awards for his contribution including the “Young Concrete Engineer and Vishwakarma Award” and completed three R&D-sponsored projects with a total value of around 55 lakhs.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | US$ 56.74 | US$ 56.74 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.