Track-Bridge Interaction on High-Speed Railways (Hardcover)
Language: English
Published by Taylor & Francis Ltd, London, 2008
- Hardcover
- New

Seller: AussieBookSeller, Truganina, VIC, AustraliaAussieBookSeller
AbeBooks seller since June 22, 2007
Condition: New
US$ 432.95
Quantity: 1 available
Add to basketItem description from seller
Hardcover. The construction of high-speed railways includes a wide variety of aspects, ranging from safety to new types of equipment and construction solutions. All these require state-of-art technologies, and in recent years design concepts for high-speed railways have improved. The focus in this volume is on the interaction between rail track and bridges. Track-bridge interaction sets a limit to the vibration and deformability of structures, so that accelerations, stresses and track deformations are controlled, circulation safety is satisfied, and design solutions for bridges are determined. Track-Bridge Interaction on High-Speed Railways presents the latest research on the interaction between rail track and bridges, and will be invaluable to civil engineers involved in the design, construction and maintenance of high-speed railways and bridges, and to researchers and graduate and undergraduate engineering students with an interest in this field. The construction of high-speed railways entails a wide variety of aspects to be considered. They range from safety aspects to new types of equipment and construction solutions, and require state-of-the-art technologies. This volume presents the latest research on the interaction between rail track and bridges. Shipping may be from our Sydney, NSW warehouse or from our UK or US warehouse, depending on stock availability.…
Seller Inventory # 9780415457743
- Title
- Track-Bridge Interaction on High-Speed Railways (Hardcover)
- Author
- Rui Calcada
- Publisher
- Taylor & Francis Ltd, London
- Publication year
- 2008
- Condition
- new
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 0415457742
- ISBN 13
- 9780415457743
The construction of high-speed railways includes a wide variety of aspects, ranging from safety to new types of equipment and construction solutions. All these require state-of-art technologies, and in recent years design concepts for high-speed railways have improved.
The focus in this volume is on the interaction between rail track and bridges. Track-bridge interaction sets a limit to the vibration and deformability of structures, so that accelerations, stresses and track deformations are controlled, circulation safety is satisfied, and design solutions for bridges are determined.
Track-Bridge Interaction on High-Speed Railways presents the latest research on the interaction between rail track and bridges, and will be invaluable to civil engineers involved in the design, construction and maintenance of high-speed railways and bridges, and to researchers and graduate and undergraduate engineering students with an interest in this field.
"Synopsis" may belong to another edition of this title.
About the Author
"About the title" may belong to another edition of this title.
AussieBookSeller
Truganina, VIC, Australia
AbeBooks seller since June 22, 2007
Shipping rates from Australia to U.S.A.
| Item | 25 to 45 business days | 8 to 14 business days |
|---|---|---|
| First item | US$ 37.00 | US$ 44.00 |
Payment methods
Seller's business information
The Nile Group Pty Ltd
42 Apex Drive
Truganina, VIC Australia 3029
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days.
Shipping terms
Please note that titles are dispatched from our UK and NZ warehouse. Delivery times specified in shipping terms. Orders ship within 2 business days. Delivery to your door then takes 8-15 days.