Turning a Problem into a Resource: Remediation and Waste Management at the Sillamäe Site, Estonia

Language: English

Published by Springer Netherlands Aug 2000, 2000

0792361865 / 9780792361862

  • Hardcover
  • New
See all details

Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, GermanyBuchWeltWeit Ludwig Meier e.K.

5-star seller

AbeBooks seller since January 11, 2012

View this seller's items
Hardcover

Condition: New

US$ 189.86

US$ 26.42 shipping 
Ships from Germany to U.S.A.

Quantity: 2 available

Add to basket
Free 30-day returns

Item description from seller

This item is printed on demand - it takes 3-4 days longer - Neuware -In its present condition, the dam of the tailings pond is less stable than is recommended by international practice. A surveillance system has been established to observe both vertical and horizontal soil movement and the buildup of stresses in the soil. The stability of the dam depends primarily on erosion by shore processes and the consequent reduction of the counterbalance, as well as the reduction in strength of the Cambrian clay underlying the dam caused by creep and by water percolating to the bottom of the pond. The most critical need is to enlarge the counterbalance and to stop erosion. The surveillance system should be supplemented with a system of inclinometers. Monitoring of coastal processes should be continued. At present, the hydrodynamic stress on the dam is minimal because the pebble layer allows drainage of water out of the tailings pond and into the sea. The regulatory requirement to end emissions into the Baltic Sea must be met without causing undesirable hydrodynamic stresses on the dam. This could be done by covering the pond and diverting precipitation water. 9. References I. Report on Topographic-Geodetic Studies at the Tailings Pond. 1965, No. A-4-01187 (in Russian). 2. Report on Geotechnical Studies at the Tailings Pond of Plant PO Box 22. 1965, No. 64691 (in Russian). 3. Report on Topographic-Geodetic and Geotechnical Studies at the Thennal Power Plant's Ash Impoundment. 1976, No. 15740 (in Russian). 4. Technical Report on Topographic Planning of the Thennal Power Plant's Ash Impoundment. 1979, No. 296 pp. Englisch.

Seller Inventory # 9780792361862

Title
Turning a Problem into a Resource: Remediation and Waste Management at the Sillamäe Site, Estonia
Author
Tönis Kaasik
Publisher
Springer Netherlands Aug 2000
Publication year
2000
Condition
Neu
Binding
Buch
Language
English
ISBN 10
0792361865
ISBN 13
9780792361862
Item weight
612 grams
Dimensions
241x160x21 mm

BuchWeltWeit Ludwig Meier e.K.

Bergisch Gladbach, Germany

5-star seller

AbeBooks seller since January 11, 2012

Shipping rates from Germany to U.S.A.

Item5 to 15 business days5 to 15 business days
First itemUS$ 26.42US$ 26.42
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.

Payment methods

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Bank Wire Transfer
  • Check
  • Paypal

Seller's business information

BuchWeltWeit Ludwig Meier e.K.

Germany