Uncertainty in Acoustics | Measurement, Prediction and Assessment
Language: English
Published by CRC Press, 2022
- Softcover
- New

Seller: preigu, Osnabrück, Germanypreigu
AbeBooks seller since August 5, 2024
Condition: New
US$ 77.90
Quantity: 5 available
Add to basketItem description from seller
Uncertainty in Acoustics | Measurement, Prediction and Assessment | Robert Peters | Taschenbuch | Einband - flex.(Paperback) | Englisch | 2022 | CRC Press | EAN 9780367492472 | Verantwortliche Person für die EU: Libri GmbH, Europaallee 1, 36244 Bad Hersfeld, gpsr[at]libri[dot]de | Anbieter: preigu.
Seller Inventory # 126742522
- Title
- Uncertainty in Acoustics | Measurement, Prediction and Assessment
- Author
- Robert Peters
- Publisher
- CRC Press
- Publication year
- 2022
- Condition
- Neu
- Binding
- Taschenbuch
- Language
- English
- ISBN 10
- 0367492474
- ISBN 13
- 9780367492472
- Item weight
- 705 grams
- Dimensions
- 234 x 156 x 25 mm
- Seller catalogs
- Bücher
This guide to estimating uncertainties in the measurement, prediction and assessment of noise and vibration applies across environmental noise and vibration, occupational noise and vibration exposure, and building and architectural acoustics.
The book collates information from the various Standards and from research, with explanation, examples and case studies. It enables estimation of uncertainty in the measurement and prediction of acoustic quantities, suitable for use in environmental impact and occupational exposure assessments. It is for acoustic consultants, mechanical and building service engineers, architect and building professionals and environmental health officers.
Bob Peters worked for more than forty years in acoustics and noise control – teaching, research, consultancy. He was a principal acoustic consultant with Applied Acoustic Design, a senior research fellow at London South Bank University, and a tutor on Institute of Acoustics distance learning courses.
"Synopsis" may belong to another edition of this title.
About the Author
Dr. Bob Peters passed away early on 22nd June 2019. Bob was well known for his unbridled enthusiasm for and contributions to acoustics education. I had the pleasure and privilege of working with him for many years through both the Open University and the Institute of Acoustics (IOA).
Bob studied Physics at Imperial College, London, graduated in 1965 and stayed on to study for a PhD in Physics which included taking the Chelsea College MSc in Acoustics and Vibration Physics, taught by Professor R W B Stephens. Bob remained at Imperial as a research assistant in underwater acoustics until 1969 and obtained his PhD, supervised by Professor Stephens, in 1971.
After three years researching diesel engine noise for CAV Ltd and two years teaching at Twickenham College of Technology, Bob moved to North East Surrey College of Technology (NESCOT) where he remained for 23 years. He started and ran Diploma and MSc programmes at NESCOT until 2010. Few acousticians will be unaware of Bob’s text ‘Acoustics and Noise Control’ (3rd edition is published by Routledge). This was the basis for much of Bob’s rewrite of the General Principles of Acoustics Module for the IOA Diploma in 2008. While at NESCOT, Bob was a guest lecturer in acoustics on undergraduate and postgraduate courses at many other institutions, including the University of North London, Oxford Brookes University, Imperial College and UCL. For around 25 years, until 2017, he delivered a significant part of the MSc in Environmental and Architectural Acoustics at London South Bank University. He also acted as an examiner for several PhD students around the country.
After retiring from NESCOT, he embarked on a new career in consultancy, while continuing with a range of teaching activities. For 22 years he worked part time as Principal Consultant with Applied Acoustic Design (AAD) where his main responsibilities included computer modelling of indoor spaces and expert witness duties.
In addition to his involvement with the Diploma, Bob worked tirelessly in many other ways for the IOA and contributed enormously to the life of the Institute for over 40 years. Bob chaired the Industrial Noise Group (a forerunner of the current Noise and Vibration Engineering Group, NVEG) from 1992 to 1997, and was the technical organiser of two of the Institute’s Autumn conferences on industrial noise, held at Windermere in 1987 and 1989. He also chaired the programme committee for the 1992 Euronoise conference, held in London.
Bob represented the IOA on several national and international committees. He chaired the CIBSE committees responsible for rewriting the Acoustics sections of CIBSE Guides A and B and was a member of the BSI committee revising BS 6472 on the measurement and assessment of human response to vibration in buildings. At an international level, Bob was the IOA representative on the I-INCE technical sub group (TSG3) on noise policies and regulations.
He became a corporate member of the IOA (MIOA) in 1977, a Fellow in 1980 and was elected as an Honorary Fellow in 2008. He served as Vice-President for Group and Branches from 1992 to 1998 and received an IOA Distinguished Services Award in 2008. In 2013 he was awarded the R W B Stephens Medal in recognition of his extensive and outstanding work in acoustics education. At the time, Bob commented that this was particularly appropriate since Professor Stephens, as well as being his PhD supervisor, had been his proposer for membership in 1977 and for his Fellowship in 1980.
Bob was the fifth Chair of the IOA Education Committee, serving from 1994 to 1998 and more recently he took over as the ninth Chair in 2015 until standing down due to ill health in 2017. During these periods Bob was instrumental in starting the IOA’s certificate courses, acting as Chief Examiner for the Certificate of Competence in Workplace Noise Risk Assessment for several years and in creating the distance learning version of the Diploma after its major restructuring in 2008. In 2000, Bob became the first Project Examiner for the Diploma in which role he undertook to visit every Diploma Centre each year. He pursued this exhausting schedule every year until 2018.
Despite being nominally an ‘Examiner’, Bob was not backward in giving fellow examiners a hard time regarding the accuracy, clarity and length of questions, being particularly severe on those setting the examinations for the General Principles of Acoustics Module. Bob became the Senior Tutor for the tutored distance learning version of the Diploma and was the primary tutor for the St. Albans group and, before the most debilitating stage of his illness, planned to carry on with its successor the Milton Keynes group.
Bob was a great supporter of the Open University which necessitated the family acquiring a television and a telephone in the mid-1970s. He was a course tutor for a long period on the second and third level courses concerned with pollution control. He helped me, as author, particularly on the noise block of the third level course. Subsequently, Bob found the time to study for an Arts degree which he was awarded in 1995.
Bob was the last to acknowledge the severity of his illness or of the side-effects suffered from the intensive treatment he was receiving. While accepting, temporarily, that the loss of an effective immune system as a result of treatment made it impossible for him to travel by public transport, it was clear from telephone conversations with him in early 2019, that he fully expected to be back contributing to the Diploma as normal. Those attempting to fill the ‘tutor’ gap left by Bob, are finding that his is a hard act to follow. He will be sorely missed.
Bob must have been one of the most widely recognised figures in the UK acoustics world, regarded with great affection by all who knew him. Here are some quotes from former colleagues and students on hearing of Bob’s death:
Stuart Dyne (currently Chief Examiner for the IOA Diploma)
Bob gave great and long service to the IOA through many activities not least of which was his enthusiastic and authoritative support for education in general and for the Diploma in particular and many of us will have one or more versions of Acoustics and Noise Control on our shelves. We will miss that contribution very much, especially at the moderation meetings where he could reliably seek and often find a mark or two to get candidates over the line
Bridget Shields (Professor emeritus at LSBU)
He was such a lovely guy - and one of best teachers of acoustics in the country. We were so lucky to have him teaching on the MSc [at LBSU] - I think I recruited him as a PT lecturer about 30 years ago and he has been with us ever since. The course would have folded without him. And he did SO much for the IOA nationally and locally too.
David Trevor-Jones (Consultant and Founder Chair of the IOA Certificate of Competence in Environmental Noise Measurements)
A generation of acousticians was taught by Bob, either directly in face-to-face encounters or through his textbook. All who were privileged to know him will have witnessed his profound commitment to acoustics education and experienced his generosity with his time and, also, his own tireless drive to learn as well as to teach.
Jim Griffiths (Consultant)
Very sad for me as he started my career at the IOA.
Chris Goff (Consultant)
That’s really sad to hear, but I’m glad I got the opportunity to be taught by him – he could explain complex subjects in a clear and understandable way which is a very rare thing to be able to do as any kind of teacher (or consultant!), as well as being an extremely helpful and friendly guy. Will be missed!
Alex Krasnic (Consultant and member of IOA Education Committee and STEM WG)
I am in a deep state of shock right now as Bob meant a lot to me.
Simon Kahn (Consultant and former Chair of the IOA Education Committee)
Bob will be greatly missed by many of his students – including me!
He was a fantastic teacher as well as a fantastic acoustician. As a colleague he would often ask a question that would leave you thinking for weeks. He was both challenging and supportive in all the right ways.
Bob’s motivation for producing this book is illustrated by the quotations used to precede his original draft for Chapter 2.
"When reporting the result of a measurement of a physical quantity, it is obligatory that some quantitative indication of the quality of the result be given so that those who use it can assess its reliability. Without such an indication, measurement results cannot be compared, either among themselves or with reference values given in a specification or standard. It is therefore necessary that there be a readily implemented, easily understood, and generally accepted procedure for characterizing the quality of a result of a measurement, that is, for evaluating and expressing its uncertainty." [ISO/IEC Guide 98-3:2008 Uncertainty of measurement ― Part 3: Guide to the expression of uncertainty in measurement (GUM:1995): Introduction paragraph 0.1].
and
"A measurement result is complete only when accompanied by a quantitative statement of its uncertainty". [Stephanie Bell in the Measurement Good Practice Guide no. 11, A Beginner's Guide to Uncertainty of Measurement, National Physical Laboratory, issue 2, 2001)]
This book is about how to quantify, minimise and evaluate such uncertainties in acoustical measurements.
Its publication is a fitting tribute to Bob’s passion for acoustics and is dedicated to his memory. It is an honour to have been given the opportunity to contribute as Technical Editor.
Keith Attenborough
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 60 to 60 business days | 60 to 60 business days |
|---|---|---|
| First item | US$ 79.67 | US$ 79.67 |
Payment methods
- Paypal
Store description
preigu betreibt einen Onlineversandhandel mit über 1 Mio. Produkten in verschiedenen Sortimenten. Das Kernsortiment besteht aus Büchern, Medien und Spielwaren. Ein gelungenes Einkaufserlebnis ist das Ziel einer jeden Bestellung bei preigu, denn der Kunde und seine Zufriedenheit stehen an erster Stelle. preigu setzt daher auf einen kompetenten Kundenservice, funktionierende Prozesse und schnelle Reaktion.
Specialty
Bücher, SpielwarenSeller's business information
preigu GmbH & Co. KG
Lengericher Landstraße 19
Osnabrück, Germany 49078
Terms of sale
Standard Business Terms and customer information
I. Standard business terms
§ 1 Basic provisions
(1) The following terms and conditions of business apply for all contracts concluded with us as the supplier (preigu GmbH & Co. KG) via the websites AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of your own terms and conditions is explicitly rejected.
(2) A ‘consumer' in the sense of the following regulations is every natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities. The term ‘businessman' refers to every natural person, legal person or legally responsible partnership that concludes a legal transaction in pursuance of his/its independent professional or commercial activity.
§ 2 Conclusion of the contract
(1) The subject-matter of the contract is the selling of products .
(2) If an article is placed by us with AbeBooks or ZVAB, the activation of the page on AbeBooks or ZVAB shall involve the binding offer to conclude a contract under the terms and conditions contained in the article page.
(3) The contract shall become effective via the online shopping cart system as follows:
The products intended for purchase are moved to the "shopping cart". You can select the "Shopping Cart" using the appropriate buttons on the navigation bar and make changes there at any time.
After calling up the "Checkout" page and entering the required personal data and payment and shipping conditions, all order information is then displayed again on the order summary page.
Before submitting the order, you have the ability once more to review or change any information here (you may also use the "back" button on the Internet browser), or to cancel the purchase.
By clicking the "Buy now" button to submit the order, you declare your legally binding acceptance of the order which makes the contract effective.
(4) The execution of the order and the sending of all the details necessitated by the conclusion of the contract take place via e-mail, in a partially-automated manner. Consequently, you have to ensure that the e-mail address that you have deposited with us is the correct one, and that the receipt of the respective e-mails is guaranteed. In particular, you have to ensure that the respective e-mails are not blocked by a SPAM filter.
§ 3 Right of retention, reservation of proprietary rights
(1) You can only exercise a right of retention if the situation in question involves claims arising from the same contractual relationship.
(2) The goods remain our property until the purchase price is paid in full.
§ 4 Warranty
(1) The statutory warranty rights are applicable.
(2) As a consumer, you are requested to promptly check the product for completeness, visible defects and transport damage as soon as it is delivered, and promptly disclose your complaints to us and the shipping company in writing. Even if you do not comply with this request, it shall have no effect on your legal warranty claims.
(3) If a characteristic of the goods deviates from the objective requirements, the deviation shall only be deemed to be agreed if you were informed of the same by us before submitting the contractual declaration and the deviation was expressly and separately agreed between the contracting parties.
§ 5 Choice of law, place of fulfilment, jurisdiction
(1) German law shall apply. This choice of law only applies to customers if it does not result in the revocation of the protection guaranteed by the mandatory provisions of the law of the country in which the respective customer's usual place of residence is located (benefit-of-the-doubt principle).
(2) If you are not a consumer, but a businessman, a legal entity under public law or an institutional fund governed by public law, our place of business is the place of jurisdiction as well as the place of fulfilment for all services that follow from the business relationships that exist with us. The same condition applies to situations in which you are not associated with a general place of jurisdiction in Germany or the EU, as well as situations in which the place of residence or the usual place of residence is not known at the time of commencement of proceedings. This has no bearing on the capacity to call upon the court associated with another place of jurisdiction.
(3) The provisions of the UN Convention on Contracts for the International Sale of Goods are explicitly inapplicable.
II. Customer information
- Identity of the seller
preigu GmbH & Co. KG
Lengericher Landstr. 19
49078 Osnabrück
Germany
Telephone: 0541-580 72 84
E-Mail: mail@preigu.de
We are neither willing nor obliged to participate in dispute resolution proceedings before consumer arbitration boards.
- Information regarding the conclusion of the contract
The technical steps associated with the conclusion of the contract, the contract conclusion itself and the correction options are executed in accordance to the regulations "conclusion of the contract" in our standard business terms (part I.).
- Contractual language, saving the text of the contract
3.1 Contract language shall be English.
3.2 The complete text of the contract is not saved with us. Before the order is sent, the contract data can be printed out or electronically saved using the browser's print function. After the order is received by us, the order data, the legally-mandated details related to distance selling contracts and the standard business terms are re-sent to you via e-mail.
- Main features of the product or service
The key features of the goods and/or services can be found in the respective quote.
- Prices and payment arrangements
5.1 The prices mentioned in the respective offers represent total prices, as do the shipping costs. They include all the price components, including all the incidental taxes.
5.2 The dispatch costs that are incurred are not included in the purchase price. They can be viewed by clicking the appropriate button on our website or in the respective quote, are shown separately over the course of the order transaction and must additionally be borne by you, insofar as free delivery is not confirmed.
5.3 If delivery is made to countries outside of the European Union, we may incur unreasonable additional costs, such as duties, taxes or money transfer fees (transfer or foreign exchange fees charged by the banks), which you must bear.
5.4 You must also bear the costs arising from money transfers in cases in which the delivery is made to an EU Member State, but the payment is initiated outside of the European Union.
5.5 The payment methods that are available to you are shown by clicking the appropriate button on our website or are disclosed in the respective quote.
5.6 Unless otherwise specified for the respective payment methods, the payment claims arising from the contract that has been concluded become payable immediately.
- Delivery conditions
6.1 The delivery conditions, delivery date and existing supply restrictions, if applicable, can be found by clicking the appropriate button on our website or in the respective quote.
Unless a different period is specified in the item description or our delivery conditions, the goods are delivered within 3-5 days after the conclusion of the contract (in case an advance payment has been agreed upon, after the payment authorisation).
6.2 If you are a consumer, the following is statutorily regulated: The risk of the sold item accidentally being destroyed or degraded during shipping only passes over to you when the item in question is delivered, regardless of whether or not the shipping operation is insured. This condition does not apply if you have independently commissioned a transport company that has not been specified by us or a person who has otherwise been appointed to execute the shipping operation.
- Statutory warranty right
Liability for defects is governed by the "Warranty" provisions in our General Terms and Conditions of Business (Part I).
Information on battery disposal
In connection with the sale of batteries or the delivery of devices containing batteries, we are obliged to inform you of the following:
Batteries must not be disposed of with household waste.
You can either return used batteries that we carry or have carried in our range as new batteries to us at your own expense or return them free of charge to our shipping warehouse (shipping address). Alternatively, you can hand in the batteries at your local collection points.
As an end user, you are legally obliged to return used batteries so that they can be recycled or disposed of properly.
Used batteries may contain harmful substances that can damage the environment or your health if not stored or disposed of properly. However, batteries also contain important raw materials such as iron, zinc, manganese or nickel and can be recycled.
The symbols on the batteries have the following meanings:
The symbol of the crossed-out wheelie bin means that the battery must not be disposed of with household waste.
For batteries containing a certain amount of lead, cadmium or mercury, the following additions below the symbol with the crossed-out wheelie bin indicate the respective pollutants:
Pb = Battery contains more than 0.004% lead by weight
Cd = Battery contains more than 0.002% cadmium by weight
Hg = Battery contains more than 0.0005% mercury by weight
Information on the costs involved in accordance with Article 56 (4) of the EU Battery Regulation (Regulation 2023/1542) can be found at the ‘Batterie-Zurück (https://www.batterie-zurueck.de/de/bewirtschaftungvonaltbatterien/)' initiative.
Please pay attention to the above instructions.