Resources-constrained Project Scheduling: Models, Algorithms, Extensions and Applications - Hardcover

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel

 
9781905209729: Resources-constrained Project Scheduling: Models, Algorithms, Extensions and Applications

This specific ISBN edition is currently not available.

Synopsis

Presenting a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims to schedule at minimal duration a set of activities subject to precedence constraints and limited resource availabilities, this book tackles three main issues. First, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. The second part focuses on several other variants of the RCPSP and on their solution methods. Lastly, industrial case studies are presented where the RCPSP plays a central part.

"synopsis" may belong to another edition of this title.

About the Author

Christian Artigues is a researcher at the Laboratory for Analysis and Architecture of Systems of the French National Institute for Scientific Research. Sophie Demassey is an assistant professor at the School of Mining Engineering in Nantes, France. Emmanuel Néron is an assistant professor at the computer science department of Polytech'Tours, France, and a member of the computer science laboratory of the University of Tours, France.

"About this title" may belong to another edition of this title.

Other Popular Editions of the Same Title

9781848210349: Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications

Featured Edition

ISBN 10:  1848210345 ISBN 13:  9781848210349
Publisher: Wiley-ISTE, 2008
Hardcover