Items related to Resource-Constrained Project Scheduling: Exact Methods...

Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case - Softcover

Sprecher, Arno

 
9783642483981: Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case

This specific ISBN edition is currently not available.

Synopsis

The subject of the book is project scheduling under resource-constraints. Several well-known scheduling problems, like e.g. the job-shop-scheduling and the assembly line balancing problem, are embedded in the mathematical programming formulation used. Exact solution procedures for a broad class of performance measures, i.e. objectives, are presented. Moreover, an algorithm for the generation of problem instances (ProGen) is described. The newcomer is introduced by illustrative examples into the field of scheduling and the expert is familarized with a powerful exact solution procedure for the multi-mode resource-constrained project scheduling problem. For the more general readership the main ideas of problem generation and computational tractability are of interest.

"synopsis" may belong to another edition of this title.

Other Popular Editions of the Same Title

9783540578345: Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case (Lecture Notes in Economics and Mathematical Systems, 409)

Featured Edition

ISBN 10:  354057834X ISBN 13:  9783540578345
Publisher: Springer, 1994
Softcover