Earned Value Management in Construction Project

 
9783659750786: Earned Value Management in Construction Project
View all copies of this ISBN edition:
 
 

There are many potential measures of performance for evaluating the success of a construction project. All address performance in three key areas: scope, schedule and budget. Earned Value Management addresses many project management areas including project organizing, planning, scheduling and budgeting, accounting, analyzing, reporting and controlling. This book explained the introduce a new and alternative approach of using a neural network for earned value management of the infrastructure project, is the best indicator of future performance by using follow–up method, and therefore, it is possible to forecast cost or schedule overruns at quite an early stage in a construction project. The objective of this book is to demonstrate that Earned Value Management is an effective management technique that integrates technical performance requirements, resource planning, with schedules and cost. The major objectives of applying earned value are to encourage the project managers and contractors to use effective technical, cost and schedule management control systems.

"synopsis" may belong to another edition of this title.

About the Author:

1)Dr.Faiq Mohammed Sarhan AlzwainyAssistant Professor of Construction Management, Dept. of Civil Engineering, Alnahrain University,Iraq2)Dr.Ibrahim Abed MohammedAssistant Professor of Construction Management, Dept. of Building and Construction, University of Technology, Iraq3)Duha SameerM.Sc. Student,University of Technology

"About this title" may belong to another edition of this title.

Buy New View Book
List Price: US$ 41.00
US$ 39.33

Convert currency

Shipping: US$ 3.16
From Germany to U.S.A.

Destination, rates & speeds

Add to Basket

Top Search Results from the AbeBooks Marketplace

1.

Alzwainy, Faiq M. Sarhan / Mohammed, Ibrahim A.
ISBN 10: 3659750786 ISBN 13: 9783659750786
New Quantity Available: 1
Seller:
Rating
[?]

Book Description Condition: New. Publisher/Verlag: LAP Lambert Academic Publishing | There are many potential measures of performance for evaluating the success of a construction project. All address performance in three key areas: scope, schedule and budget. Earned Value Management addresses many project management areas including project organizing, planning, scheduling and budgeting, accounting, analyzing, reporting and controlling. This book explained the introduce a new and alternative approach of using a neural network for earned value management of the infrastructure project, is the best indicator of future performance by using follow-up method, and therefore, it is possible to forecast cost or schedule overruns at quite an early stage in a construction project. The objective of this book is to demonstrate that Earned Value Management is an effective management technique that integrates technical performance requirements, resource planning, with schedules and cost. The major objectives of applying earned value are to encourage the project managers and contractors to use effective technical, cost and schedule management control systems. | Format: Paperback | Language/Sprache: english | 203 gr | 220x150x7 mm | 140 pp. Seller Inventory # K9783659750786

More information about this seller | Contact this seller

Buy New
US$ 39.33
Convert currency

Add to Basket

Shipping: US$ 3.16
From Germany to U.S.A.
Destination, rates & speeds

2.

Alzwainy Faiq M. Sarhan
Published by LAP Lambert Academic Publishing (2016)
ISBN 10: 3659750786 ISBN 13: 9783659750786
New Paperback Quantity Available: 1
Print on Demand
Seller:
Ria Christie Collections
(Uxbridge, United Kingdom)
Rating
[?]

Book Description LAP Lambert Academic Publishing, 2016. Paperback. Condition: New. PRINT ON DEMAND Book; New; Publication Year 2016; Not Signed; Fast Shipping from the UK. No. book. Seller Inventory # ria9783659750786_lsuk

More information about this seller | Contact this seller

Buy New
US$ 37.52
Convert currency

Add to Basket

Shipping: US$ 5.03
From United Kingdom to U.S.A.
Destination, rates & speeds

3.

Alzwainy Faiq M Sarhan
Published by LAP Lambert Academic Publishing (2015)
ISBN 10: 3659750786 ISBN 13: 9783659750786
New Quantity Available: > 20
Print on Demand
Seller:
Paperbackshop-US
(Wood Dale, IL, U.S.A.)
Rating
[?]

Book Description LAP Lambert Academic Publishing, 2015. PAP. Condition: New. New Book. Shipped from US within 10 to 14 business days. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Seller Inventory # IQ-9783659750786

More information about this seller | Contact this seller

Buy New
US$ 43.71
Convert currency

Add to Basket

Shipping: US$ 3.99
Within U.S.A.
Destination, rates & speeds

4.

Alzwainy Faiq M. Sarhan
Published by LAP Lambert Academic Publishing 7/23/2015 (2015)
ISBN 10: 3659750786 ISBN 13: 9783659750786
New Paperback or Softback Quantity Available: 10
Seller:
BargainBookStores
(Grand Rapids, MI, U.S.A.)
Rating
[?]

Book Description LAP Lambert Academic Publishing 7/23/2015, 2015. Paperback or Softback. Condition: New. Earned Value Management in Construction Project. Book. Seller Inventory # BBS-9783659750786

More information about this seller | Contact this seller

Buy New
US$ 49.89
Convert currency

Add to Basket

Shipping: FREE
Within U.S.A.
Destination, rates & speeds

5.

Alzwainy, Faiq M. Sarhan
Published by LAP LAMBERT Academic Publishin (2018)
ISBN 10: 3659750786 ISBN 13: 9783659750786
New Paperback Quantity Available: > 20
Print on Demand
Seller:
Murray Media
(NORTH MIAMI BEACH, FL, U.S.A.)
Rating
[?]

Book Description LAP LAMBERT Academic Publishin, 2018. Paperback. Condition: New. Never used! This item is printed on demand. Seller Inventory # 3659750786

More information about this seller | Contact this seller

Buy New
US$ 50.84
Convert currency

Add to Basket

Shipping: FREE
Within U.S.A.
Destination, rates & speeds

6.

Alzwainy Faiq M Sarhan
Published by LAP Lambert Academic Publishing (2015)
ISBN 10: 3659750786 ISBN 13: 9783659750786
New Quantity Available: > 20
Print on Demand
Seller:
Books2Anywhere
(Fairford, GLOS, United Kingdom)
Rating
[?]

Book Description LAP Lambert Academic Publishing, 2015. PAP. Condition: New. New Book. Delivered from our UK warehouse in 3 to 5 business days. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Seller Inventory # LQ-9783659750786

More information about this seller | Contact this seller

Buy New
US$ 41.09
Convert currency

Add to Basket

Shipping: US$ 11.69
From United Kingdom to U.S.A.
Destination, rates & speeds

7.

Alzwainy Faiq M Sarhan, Mohammed Ibrahim a, Mohsen Duha S
Published by LAP Lambert Academic Publishing, United States (2015)
ISBN 10: 3659750786 ISBN 13: 9783659750786
New Paperback Quantity Available: 10
Print on Demand
Seller:
The Book Depository EURO
(London, United Kingdom)
Rating
[?]

Book Description LAP Lambert Academic Publishing, United States, 2015. Paperback. Condition: New. Language: English . Brand New Book ***** Print on Demand *****.There are many potential measures of performance for evaluating the success of a construction project. All address performance in three key areas: scope, schedule and budget. Earned Value Management addresses many project management areas including project organizing, planning, scheduling and budgeting, accounting, analyzing, reporting and controlling. This book explained the introduce a new and alternative approach of using a neural network for earned value management of the infrastructure project, is the best indicator of future performance by using follow-up method, and therefore, it is possible to forecast cost or schedule overruns at quite an early stage in a construction project. The objective of this book is to demonstrate that Earned Value Management is an effective management technique that integrates technical performance requirements, resource planning, with schedules and cost. The major objectives of applying earned value are to encourage the project managers and contractors to use effective technical, cost and schedule management control systems. Seller Inventory # AAV9783659750786

More information about this seller | Contact this seller

Buy New
US$ 55.87
Convert currency

Add to Basket

Shipping: US$ 3.89
From United Kingdom to U.S.A.
Destination, rates & speeds

8.

Faiq M. Sarhan Alzwainy
Published by LAP Lambert Academic Publishing Aug 2015 (2015)
ISBN 10: 3659750786 ISBN 13: 9783659750786
New Taschenbuch Quantity Available: 1
Seller:
BuchWeltWeit Inh. Ludwig Meier e.K.
(Bergisch Gladbach, Germany)
Rating
[?]

Book Description LAP Lambert Academic Publishing Aug 2015, 2015. Taschenbuch. Condition: Neu. Neuware - There are many potential measures of performance for evaluating the success of a construction project. All address performance in three key areas: scope, schedule and budget. Earned Value Management addresses many project management areas including project organizing, planning, scheduling and budgeting, accounting, analyzing, reporting and controlling. This book explained the introduce a new and alternative approach of using a neural network for earned value management of the infrastructure project, is the best indicator of future performance by using follow-up method, and therefore, it is possible to forecast cost or schedule overruns at quite an early stage in a construction project. The objective of this book is to demonstrate that Earned Value Management is an effective management technique that integrates technical performance requirements, resource planning, with schedules and cost. The major objectives of applying earned value are to encourage the project managers and contractors to use effective technical, cost and schedule management control systems. 140 pp. Englisch. Seller Inventory # 9783659750786

More information about this seller | Contact this seller

Buy New
US$ 43.00
Convert currency

Add to Basket

Shipping: US$ 19.38
From Germany to U.S.A.
Destination, rates & speeds

9.

Faiq M. Sarhan Alzwainy
Published by LAP Lambert Academic Publishing Aug 2015 (2015)
ISBN 10: 3659750786 ISBN 13: 9783659750786
New Taschenbuch Quantity Available: 1
Seller:
Rheinberg-Buch
(Bergisch Gladbach, Germany)
Rating
[?]

Book Description LAP Lambert Academic Publishing Aug 2015, 2015. Taschenbuch. Condition: Neu. Neuware - There are many potential measures of performance for evaluating the success of a construction project. All address performance in three key areas: scope, schedule and budget. Earned Value Management addresses many project management areas including project organizing, planning, scheduling and budgeting, accounting, analyzing, reporting and controlling. This book explained the introduce a new and alternative approach of using a neural network for earned value management of the infrastructure project, is the best indicator of future performance by using follow-up method, and therefore, it is possible to forecast cost or schedule overruns at quite an early stage in a construction project. The objective of this book is to demonstrate that Earned Value Management is an effective management technique that integrates technical performance requirements, resource planning, with schedules and cost. The major objectives of applying earned value are to encourage the project managers and contractors to use effective technical, cost and schedule management control systems. 140 pp. Englisch. Seller Inventory # 9783659750786

More information about this seller | Contact this seller

Buy New
US$ 43.00
Convert currency

Add to Basket

Shipping: US$ 19.38
From Germany to U.S.A.
Destination, rates & speeds

10.

Alzwainy, Faiq M. Sarhan; Mohammed, Ibrahim A.; Mohsen, Duha S.
Published by LAP LAMBERT Academic Publishing
ISBN 10: 3659750786 ISBN 13: 9783659750786
New PAPERBACK Quantity Available: > 20
Seller:
Russell Books
(Victoria, BC, Canada)
Rating
[?]

Book Description LAP LAMBERT Academic Publishing. PAPERBACK. Condition: New. 3659750786 Special order direct from the distributor. Seller Inventory # ING9783659750786

More information about this seller | Contact this seller

Buy New
US$ 58.43
Convert currency

Add to Basket

Shipping: US$ 7.00
From Canada to U.S.A.
Destination, rates & speeds

There are more copies of this book

View all search results for this book