Critical Path Method was developed in the 1950s by duPont deNemour Company in conjunction with the Rand Corporation, for optimal production time in a project. The method is still considered a staple. This 1968 book shows examples for building and engineering projects, including fold-out diagrams. -- Softcover, metal coil binding. Condition: very good (owner name).