Sujit Kumar Jha (9 results)

- Softcover
Seller: Books Puddle, New York, NY, U.S.A.Books Puddle
Contact seller4-star sellerCondition: New
US$ 87.27
US$ 3.99 shippingShips within U.S.A.Quantity: 4 available
Condition: New.

- Softcover
Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
Contact seller5-star sellerCondition: New
US$ 110.61
US$ 13.38 shippingShips from United Kingdom to U.S.A.Quantity: 1 available
Paperback. Condition: Brand New. 100 pages. 8.66x5.91x0.23 inches. In Stock.

- Softcover
Seller: preigu, Osnabrück, Germanypreigu
Contact seller5-star sellerCondition: New
US$ 50.95
US$ 79.88 shippingShips from Germany to U.S.A.Quantity: 5 available
Taschenbuch. Condition: Neu. Development of a framework for E-Manufacturing | Enabling Tool and System used for E-Manufacturing | Sujit Kumar Jha | Taschenbuch | 100 S. | Englisch | 2012 | LAP LAMBERT Academic Publishing | EAN 9783659250163 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078… Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu.

Language: English
Published by LAP LAMBERT Academic Publishing Sep 2012, 2012
- Softcover
- Print on Demand
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, GermanyBuchWeltWeit Ludwig Meier e.K.
Contact seller5-star sellerCondition: New
US$ 57.59
US$ 26.25 shippingShips from Germany to U.S.A.Quantity: 2 available
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -This thesis enlightens some of the key issues involved in developing real schedule generation architecture in E-manufacturing environment. The high cost and long cycle time of development of shop floor control systems accompanied by… the lack of robust system integration capabilities are some of the major deterrent in the development of the underlying architecture.In this thesis,a robust framework has been conceptualized,which is capable of providing flexibility to the system, communicating among various entities and making intelligent decisions. Owing to the fast communication, distributed control and autonomous character, agent-oriented architecture has been preferred here to address the scheduling problem in E- manufacturing. Further, an integer programming based model has been formulated for determining the optimal part type sequence from the part type pool with dual objectives namely, minimizing the makespan and increasing the system throughput. The proposed auction-based heuristic to allocate the operation on machines, supported by agent technology appears to be a good formalism to resolve a complex problem in e-manufacturing environment. 100 pp. Englisch.

- Softcover
- Print on Demand
Seller: Majestic Books, Hounslow, United KingdomMajestic Books
Contact seller4-star sellerCondition: New
US$ 87.23
US$ 8.69 shippingShips from United Kingdom to U.S.A.Quantity: 4 available
Condition: New. Print on Demand.

- Softcover
- Print on Demand
Seller: moluna, Greven, Germanymoluna
Contact seller5-star sellerCondition: New
US$ 48.25
US$ 55.91 shippingShips from Germany to U.S.A.Quantity: Over 20 available
Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Jha Sujit KumarSujit Kumar Jha is a Faculty member of Engineering Department at Ibra College of Technology,Ibra, Oman. He started his career as Lecturer in Anand Engineering College, India. He Graduated… from Govt. Engineering College.

- Softcover
- Print on Demand
Seller: Biblios, frankfurt am main, HESSE, GermanyBiblios
Contact seller4-star sellerCondition: New
US$ 93.93
US$ 11.35 shippingShips from Germany to U.S.A.Quantity: 4 available
Condition: New. PRINT ON DEMAND.

- Softcover
- Print on Demand
Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH
Contact seller5-star sellerCondition: New
US$ 57.59
US$ 69.43 shippingShips from Germany to U.S.A.Quantity: 1 available
Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - This thesis enlightens some of the key issues involved in developing real schedule generation architecture in E-manufacturing environment. The high cost and long cycle time of development of shop floor control systems accompanied by the…lack of robust system integration capabilities are some of the major deterrent in the development of the underlying architecture.In this thesis,a robust framework has been conceptualized,which is capable of providing flexibility to the system, communicating among various entities and making intelligent decisions. Owing to the fast communication, distributed control and autonomous character, agent-oriented architecture has been preferred here to address the scheduling problem in E- manufacturing. Further, an integer programming based model has been formulated for determining the optimal part type sequence from the part type pool with dual objectives namely, minimizing the makespan and increasing the system throughput. The proposed auction-based heuristic to allocate the operation on machines, supported by agent technology appears to be a good formalism to resolve a complex problem in e-manufacturing environment.

Language: English
Published by LAP LAMBERT Academic Publishing Sep 2012, 2012
- Softcover
- Print on Demand
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germanybuchversandmimpf2000
Contact seller5-star sellerCondition: New
US$ 57.59
US$ 68.47 shippingShips from Germany to U.S.A.Quantity: 1 available
Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -This thesis enlightens some of the key issues involved in developing real schedule generation architecture in E-manufacturing environment. The high cost and long cycle time of development of shop floor control systems accompanied by the… lack of robust system integration capabilities are some of the major deterrent in the development of the underlying architecture.In this thesis,a robust framework has been conceptualized,which is capable of providing flexibility to the system, communicating among various entities and making intelligent decisions. Owing to the fast communication, distributed control and autonomous character, agent-oriented architecture has been preferred here to address the scheduling problem in E- manufacturing. Further, an integer programming based model has been formulated for determining the optimal part type sequence from the part type pool with dual objectives namely, minimizing the makespan and increasing the system throughput. The proposed auction-based heuristic to allocate the operation on machines, supported by agent technology appears to be a good formalism to resolve a complex problem in e-manufacturing environment.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 100 pp. Englisch.